Construction Outline Description
Construction Name: Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Construction Location: Kakuda City, Kakuda, Machida area
Construction Period: From Reiwa Year Month Day to March 12, Reiwa 9
Location Map
Construction Location
Specifications
¥
¥
¥
Contract Construction
From Year Month Day to March 12, Reiwa 9
This Construction Cost
Number
Kakuda City, Kakuda, Machida area
Reason for Commencement
Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Construction Price
Consumption Tax Equivalent Amount
Construction Method
Other
Construction Period
Reiwa Days
Reiwa
Planned Structure/Specification Outline
Construction Length L=170.5m
Construction Width W=4.85m to 10.3m
Surface Layer Work (Recycled Dense Graded Asphalt 20F) t=5cm A=878m2
Upper Layer Sub-base Work (Graded Crushed Stone M-40) t=10cm A=878m2
Irregularity Leveling Work (No filler material) A=878m2
Design Breakdown (Main 01)
Construction Name: Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Project Classification
Construction Classification
Road New Construction/Renovation
Pavement Work
Classification/Work Type/Category/Detail
Specifications
Unit
Quantity
Unit Price
Amount
Quantity/Amount Increase/Decrease
Remarks
Pavement
Type
1
Road Earthwork
Type
1
Excavation Work
Type
1
Excavation Soil Type: Earth, Construction Method: Open Cut, Earth Push: None, Obstacles: None, Construction Quantity: Less than 5,000m3
m3
110
Unit 1
Excess Soil Disposal Work
Type
1
Earth and Sand Transport
Soil Type: Earth (including boulders/cobbles)
m3
110
Unit 2
Pavement Work
Type
1
Asphalt Pavement Work
Type
1
Surface Layer (Roadway/Shoulder)
Material Type: Various (exceeding 2.30 but less than 2.40t/m3), Material Specification: Recycled Dense Graded Asphalt 20F, Pavement Thickness: 50mm, Average Width: Exceeding 3.0m
m2
878
Unit 3
Upper Layer Sub-base (Roadway/Shoulder)
Sub-base Material Type: Graded Crushed Stone M-40, Finishing Thickness: 100mm
m2
878
Unit 4
Irregularity Leveling
Filler Material: None
m2
878
Unit 5
Line Marking Work
Type
1
Line Marking Work
Type
1
Melt-type Line Marking W=15cm Solid White Line
m
340
Unit 6
Structure Removal Work
Type
1
Structure Demolition Work
Type
1
Pavement Slab Cutting As Pavement Slab t=15cm or less
m
190
Unit 7
Pavement Slab Crushing As Pavement Slab t=15cm or less
m2
880
Unit 8
Transport and Disposal Work
Type
1
Shell Transport/Disposal As Shell
m3
26
Unit 9
Temporary Work
Type
1
Traffic Management Work
Type
1
Traffic Guidance Guard
Man-day
Unit
1
Unit 10
Direct Construction Cost
Type
1
Common Temporary Work
Type
1
Miyagi Prefecture - 1 -
Design Breakdown (Main 01)
Construction Name: Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Project Classification
Construction Classification
Road New Construction/Renovation
Pavement Work
Classification/Work Type/Category/Detail
Specifications
Unit
Quantity
Unit Price
Amount
Quantity/Amount Increase/Decrease
Remarks
Common Temporary Work Cost
Type
1
Site Environmental Improvement Cost
Type
1
Weekly Holiday 2-Day PR Signboard
Base
1
Unit 11
Common Temporary Work Cost (Ratio Calculation)
Type
1
Net Construction Cost
Type
1
Site Management Cost
Type
1
Construction Cost
Type
1
General Administrative Costs, etc.
Type
1
Construction Price
Type
1
Consumption Tax and Local Consumption Tax Amount
Type
1
Total Construction Cost
Type
1
Miyagi Prefecture - 2 -
Design Breakdown (Main 01)
Construction Name: Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Project Classification
Construction Classification
Road New Construction/Renovation
Pavement Work
Classification/Work Type/Category/Detail
Specifications
Unit
Quantity
Unit Price
Amount
Quantity/Amount Increase/Decrease
Remarks
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Excavation
Soil Type: Earth, Construction Method: Open Cut, Earth Push: None, Obstacles: None, Construction Quantity: Less than 5,000m3
Unit: m3
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Excavation
Earth, Open Cut, None, None, Less than 5,000m3
m3
10
Total
Unit Price: ¥/m3
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Earth and Sand Transport
Soil Type: Earth (including boulders/cobbles)
Unit: m3
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Earth and Sand Transport
Standard, Backhoe Bucket Capacity 0.8m3, Earth and Sand (including boulders/cobbles), None, within 2.0km
m3
10
Total
Unit Price: ¥/m3
Miyagi Prefecture - 4 -
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Surface Layer (Roadway/Shoulder)
Material Type: Various (exceeding 2.30 but less than 2.40t/m3), Material Specification: Recycled Dense Graded Asphalt 20F, Pavement Thickness: 50mm, Average Width: Exceeding 3.0m
Unit: m2
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Surface Layer (Roadway/Shoulder)
Exceeding 3.0m, 50mm, Various (exceeding 2.30 but less than 2.40t/m3), Prime Coat PK-3, All Costs
m2
10
Total
Unit Price: ¥/m2
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Upper Layer Sub-base (Roadway/Shoulder)
Sub-base Material Type: Graded Crushed Stone M-40, Finishing Thickness: 100mm
Unit: m2
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Upper Layer Sub-base (Roadway/Shoulder)
Graded Crushed Stone M-40, 100mm, 1-layer construction, All Costs
m2
10
Total
Unit Price: ¥/m2
Miyagi Prefecture - 5 -
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Irregularity Leveling
Filler Material: None
Unit: m2
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Irregularity Leveling
None, All Costs
m2
10
Total
Unit Price: ¥/m2
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Melt-type Line Marking
Construction Method: Melt-type Manual, Specification/Standard: Solid Line 15cm, Application Thickness: 1.0mm, Permeable Pavement: None
Unit: m
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Line Marking Installation
None, Melt-type Manual, None, Solid Line 15cm, None, 1.0mm, None, None, Content 15-18%, White, Asphalt Pavement, All Costs
m
10
Unit 12
Total
Unit Price: ¥/m
Miyagi Prefecture - 6 -
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Pavement Slab Cutting
As Pavement Slab t=15cm or less
Unit: m
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Pavement Slab Cutting
Asphalt Pavement Slab, 15cm or less, All Costs
m
10
Total
Unit Price: ¥/m
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Pavement Slab Crushing
As Pavement Slab t=15cm or less
Unit: m2
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Pavement Slab Crushing
Asphalt Pavement Slab, None, Not Required, 15cm or less, Yes, All Costs
m2
10
Total
Unit Price: ¥/m2
Miyagi Prefecture - 7 -
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Shell Transport/Disposal
As Shell
Unit: m3
Unit Quantity: 10
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Shell Transport
Pavement Slab Crushing, Machine (Noise Countermeasures Not Required, 15cm or less thick), None, within 6.5km, All Costs
m3
10
Disposal Fee (m3)
None
m3
10
Unit 13
Total
Unit Price: ¥/m3
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Traffic Guidance Guard
Unit: Man-day
Unit Quantity: 1
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Traffic Guidance Guard B
Man-day
Unit
1
Unit 14
Total
Unit Price: ¥/Man-day
Miyagi Prefecture - 8 -
Primary Unit Price Table
Unit Price Application Date: 2026.10
Work Rate Application Date: 2026.10
Labor Adjustment Factor: 1.000-00000
0.0
0
Weekly Holiday 2-Day PR Signboard
Unit: Base
Unit Quantity: 1
Unit Price
Name/Specification
Conditions
Unit
Quantity
Unit Price
Amount
Remarks
Weekly Holiday 2-Day PR Signboard
Base
1
Total
Unit Price: ¥/Base
Miyagi Prefecture - 9 -
Construction Number
Route Name
Construction Location
Scale
Kakuda City
Construction Name
Drawing Name
Designer
Location
Design Year
Drawing Number
11
Machida No. 2 Line
Kakuda City, Kakuda, Machida area
Reiwa 8 Noda Drainage Area Stormwater Pipe Construction
Plan View, Pavement Layout, Standard Cross Section
Illustrated
Plan View S=1:250
Standard Cross Section S=1:25
6000
3000
3000
CL
No.0
No.0+18.5
No.1
No.1+12.4
No.2
No.3
No.4
No.5
No.6
No.7
No.8
No.8+10.5
No.0+6.3
No.0
No.8+10.5
Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
Construction Length L=170.5m
Construction Width W=4.85m to 10.3m
Surface Layer Work (Recycled Dense Graded Asphalt 20F)
Upper Layer Sub-base Work (Graded Crushed Stone M-40)
Irregularity Leveling Work (No filler material)
t=5cm A=878m2
t=10cm A=878m2
A=878m2
Line Marking Work White Solid Line W=15cm L=170.5m
L=170.5m
Pavement Slab Cutting
No.0
No.8+10.5
Line Marking Work White Solid Line W=15cm L=170.5m
Pavement Slab Cutting L=4.85m
Pavement Slab Cutting L=10.3m
Pavement Layout H=1:250
S=1:250
No.0+18.5
No.0
No.0+6.3
No.1
No.1+12.4
No.2
No.3
No.4
No.5
No.6
No.7
No.8
No.8+10.5
20000
20000
20000
20000
20000
20000
7600
12400
1500
12200
6300
10500
10300
5800
5900
5450
5450
5400
4950
4950
5000
4950
4900
4900
4900
4900
4850
Surface Layer Work: (Recycled Dense Graded Asphalt 20F) t=5cm
Upper Layer Sub-base Work: (Graded Crushed Stone M-40) t=10cm
Main Restoration
Irregularity Leveling Work: (No filler material)
Temporary Restoration
Accompanying Pavement Restoration Work
Surface Layer Work: (Recycled Dense Graded Asphalt 13F) t=3cm
Lower Layer Sub-base Work: (Recycled Crushed Stone RC-40) t=42cm
Implementation
Office Name
Remarks
(1) Application of Estimation Standards and Design Unit Prices
(1) Adjustment of Construction Period due to Related Works
(2) Restrictions due to Construction Period
(3) Failure to reach agreement with relevant organizations, etc.
(4) As a result of consultation with relevant organizations, specific conditions are added.
(1) Restrictions on construction methods, machinery, working hours, etc.
(1) Necessity of special measures for turbidity and water inflow treatment
Name
Location
(2) Construction Generated Soil Treatment/Disposal
Treatment/Disposal Location
Free Disposal
(1) Regarding Treatment/Disposal of Construction Generated Soil
5 Process Management
3 Assignment of Exclusive Technicians
8 Drainage Work
This construction's excess soil shall be transported to the location below. If it is not possible to do so, it shall be done under the instruction of the supervisor and will be subject to design changes.
9 Construction By-product Countermeasures (Construction Generated Soil)
Estimation standards and design unit prices are for the month prior to the announcement date.
Within 90 days of the contract start date (if hand-held work is completed or there are no restrictions, work may commence before the deadline).
(1) Designation of On-site Construction Start Date (Exception to On-site Manager Assignment Requirements)
* Applicable from April 1, Reiwa 25 "Exception to On-site Manager Assignment Requirements for Construction with Designated On-site Start Date"
Within XX days from the contract start date.
In accordance with Common Special Specifications for Civil Engineering Works, Volume 1, Section 1-1-4.
Unless otherwise specified for the start date, the contractor shall generally commence on-site construction within 30 days from the contract start date.
(3) Other
During the period up to the day before the designated on-site construction start date, if it is clear that the construction site is inactive, including construction preparation, the exclusive assignment of the site manager to the construction site is not required.
Refer to the website of the Treasury Bureau Contract Division.
http://www.pref.miyagi.jp/soshiki/keiyaku/kk50.html
In accordance with the provisions of Article 26, Paragraph 3 of the Construction Industry Act (hereinafter referred to as "Exclusive Exception"), if a chief technician or supervising technician is assigned, it shall be as follows.
1. If a chief technician or supervising technician to whom the Exclusive Exception applies is assigned, refer to the following website of the Treasury Bureau Contract Division for the application requirements.
https://www.pref.miyagi.jp/soshiki/keiyaku/kk50.html
2. If the chief technician or supervising technician for this construction is subject to the Exclusive Exception, submit the Confirmation Items and Pledge Form when selected as the successful bidder candidate.
3. If a chief technician or supervising technician subject to the Exclusive Exception is assigned to this construction, or no longer needs to be assigned, register appropriately with CORINS.
4. Application Date for Estimation Standards and Design Unit Prices
(2) Construction where the contractor can choose the start date (Flex Construction)
Content
This construction shall be carried out in accordance with the "Common Specifications" established by the Miyagi Prefecture Civil Engineering Department, as well as this Special Specifications.
The order of priority for the contents of the specifications shall be: "Special Specifications", "Common Special Specifications", "Common Specifications".
Conditions
Item
Construction Method
Kakuda City Waterworks and Sewerage Office
2 Chief Technicians and Supervising Technicians (hereinafter referred to as "Assigned Technicians")
1 Application of Common Specifications
- SPECIAL SPECIFICATIONS -
Reiwa 8 Noda Drainage Area Stormwater Pipe Construction Pavement Restoration Work
6 Pollution Control Measures
(1) Restrictions on construction methods, working hours, etc. for traffic safety facilities, etc.
(2) Assignment of traffic guidance personnel due to proximity work with occupied buried objects
Construction Conditions Statement
Response to Police Consultation and Safety Facility Installation Plan
7 Safety Measures
Construction Name
2.0 km
Treatment/Disposal Method
Distance
Restrictions
Time
Remarks
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Applicable from bid announcements on or after May 1, Reiwa 8
Treatment/Disposal Method
(2) Treatment/Disposal other than Construction Generated Soil
Time
To
Construction By-products
Time
Time
To
Time
Time
To
Time
Time
To
Time
Time
To
Time
(1) Ready-mixed Concrete
(2) Purchased Soil
(3) Use of Miyagi Prefecture Green Products
1. Vegetation base materials, sight guide posts, and formwork plywood shall generally be Miyagi Prefecture Green Products.
2. Embankment material, backfill material
3. Other
( )
(4) Use of Prefectural Products
(5) On-site Spraying Method Frame Work
12 Quality Certification
When using purchased soil, submit a copy of the "Permit for Collection Plan under Article 33 of the Quarrying Act" or a copy of the "Permit for Collection Plan under Article 16 of the Gravel Collection Act" at the time of material approval.
(1) Procedures for Design Changes
In accordance with the "Miyagi Prefecture Green Product" Utilization Promotion Guidelines.