FY2026 Myoko-Togakushi Mountain National Park Myoko Highland Visitor Center Entrance Renovation Work
About This Opportunity
This is a works contract in the construction and civil works and environment and climate sectors, with a focus on Buildings, Rehabilitation and Protected Areas. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from JapaneseFY2026 Myoko-Togakushi Mountain National Park Myoko Highland Visitor Center Entrance Renovation Work
1. Notice of Bidding (Construction Work) The following is subject to open competitive bidding. June 19, 2024 Delegated Discretionary Expenditure Authority Officer, Chubu Regional Environmental Office, Shinetsu Environmental Office Director, Hideaki Matsumoto 1. Outline of Work (1) Work Name: FY2026 Myoko-Togakushi Mountain National Park Myoko Highland Visitor Center Entrance Renovation Work (2) Work Location: 2248-4 Sekikawa, Myoko City, Niigata Prefecture (3) Work Details: As per separate drawings and specifications (4) Work Period: From the day after the contract is concluded until January 8, 2025 (5) This work will be carried out using the electronic procurement system for submission of documents, bidding, etc. If it is difficult to use the electronic procurement system, paper bidding may be substituted with the approval of the contracting party. (6) This work is subject to the "Two-Day Weekend Work (Site Closure Type)" which ensures two days off per week through site closure. 2. Qualifications for Bidding Participation (1) Not subject to the provisions of Article 70 and Article 71 of the Order on Budget, Settlement and Accounting (Imperial Ordinance No. 165 of 1947) (hereinafter referred to as "Budget Execution Order"). (2) Registered in "Building Construction" for FY2025-2026 open competitive bidding qualifications by the Ministry of the Environment, and certified as C or D grade. Or, registered in "Natural Environment Symbiosis Construction" and certified as A or B grade. (For those for whom rehabilitation proceedings have been initiated based on the Corporate Rehabilitation Act (Act No. 154 of 2002) or for whom reconstruction proceedings have been initiated based on the Civil Reconstruction Act (Act No. 225 of 1999), re-certification of open competitive bidding qualifications based on procedures separately established by the Ministry of the Environment after the decision to commence proceedings has been made). (3) Not a person for whom rehabilitation proceedings have been initiated based on the Corporate Rehabilitation Act or for whom reconstruction proceedings have been initiated based on the Civil Reconstruction Act (excluding those who have received re-certification as per (2) above). (4) Must have experience in constructing the same type of work as specified below, completed and delivered as the prime contractor since FY2011. (Experience as a member of a joint venture is limited to cases where the contribution ratio is 20% or more). The total evaluation score for such work experience must be 65 points or more. For ongoing construction joint ventures, any member must have experience in constructing the same type of work as specified below as the prime contractor since FY2011. 1) Same type of work: Experience in building construction commissioned by national or local governments. 2. Must be able to assign a chief engineer or supervising engineer who meets the following criteria to this work. 1) Must hold a Class 1 or Class 2 Construction Management Engineer qualification, or equivalent or higher. For chief engineers, they must hold the qualifications specified below. - Those who meet the qualifications specified in Article 7, Item 2 (a), (b), or (c) of the Construction Industry Act. (Refer to Article 7-3 of the Construction Industry Act Enforcement Regulations and Ministry of Land, Infrastructure, Transport and Tourism Notification No. 1424 (December 16, 2002)). 2) Must have experience in the work listed in (4) above since FY2011. The total evaluation score for such work experience must be 65 points or more. 3) For supervising engineers, they must possess a supervising engineer's license and have completed the supervising engineer training. (6) Not be subject to a suspension of bidding, etc., in accordance with the "Standards for Suspension of Bidding, etc., for Construction Contracts, etc." (Ministry of the Environment Circular No. 2012255 dated December 25, 2020) from the Ministry of the Environment during the period from the submission deadline of the qualification confirmation application form (hereinafter referred to as "Application Form") and qualification confirmation documents (hereinafter referred to as "Documents") to the bid opening. (7) Not be a contractor who has undertaken design work related to the work specified in 1. (1) or a construction company that is related to such a contractor in terms of capital or personnel. (Refer to the bid explanation document). (8) There should be no capital or personnel relationship between bidders. (Refer to the bid explanation document). (9) The head office, branch office, or business office established under the Construction Industry Act must be located within the following areas. Nagano Prefecture, Gunma Prefecture, Niigata Prefecture, Gifu Prefecture, Toyama Prefecture. (10) Not be a person who has been requested by the police authorities to be excluded from bidding on contracts, etc., commissioned by the Ministry of the Environment, on the grounds that a member of a violent group effectively controls the management, or is equivalent to such a person, and such a state continues. 3. Bidding Procedures, etc. (1) Contact Department: 380-0846 1108 Asahi-cho, Nagano City, Nagano Prefecture, Nagano First Government Building 3rd Floor, Ministry of the Environment, Shinetsu Environmental Office, General Affairs Division Phone: 026-231-6570 FAX: 026-235-1226 Email: NCO-NAGANO@env.go.jp (2) Period, Place, and Method of Distribution of Bid Explanation Documents: 1) Bidders who wish to participate should download the bid explanation document by selecting the relevant work title from the "Procurement Information" on the Shinetsu Environmental Office website. Shinetsu Environmental Office URL: https://chubu.env.go.jp/shinetsu/procure/ Necessary separate drawings and specifications for bidding estimates can also be obtained in the same way. Period for distribution of bid explanation documents: June 19, 2024 to June 29, 2024 (3) Date, Time, and Place of Bidding, and Method of Submission of Bids: 3 Bids must be submitted via the electronic procurement system. However, with the approval of the contracting party, paper bids may be submitted using Form 5 of the Ministry of the Environment Bidding Guidelines. The deadline for bid submission is as follows. 1) The deadline for bids via the electronic procurement system is July 1, 2024, 10:00 AM. 2) Bid opening will be held on July 1, 2024, at 10:00 AM, in the conference room of the Shinetsu Environmental Office, Chubu Regional Environmental Office, Ministry of the Environment. 4. Other (1) Language and Currency Used in Procedures: Japanese language and Japanese currency only. (2) Bid Bond and Contract Deposit: 1) Bid Bond: Exempt. 2) Contract Deposit: Payment required. However, a guarantee from a financial institution or guarantee company (contracting authority: Shinetsu Environmental Office) may be substituted for the contract deposit. Furthermore, if a performance guarantee bond from a public works performance guarantee company is provided or a performance guarantee insurance contract is concluded, the contract deposit will be waived. (3) Invalid Bids: 1) Bids submitted by persons who do not meet the bidding qualifications stated in the notice, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. 2) If an invalid bid is selected as the successful bid, the successful bid decision will be canceled. 3) Even if a person has been confirmed to meet the bidding qualifications by the contract manager, etc., if they do not meet the qualifications listed in 2 at the time of bid opening, they will be considered to not meet the bidding qualifications. 4) Bids will be considered invalid if the cost breakdown is not submitted, or if the submitted cost breakdown is incomplete, such as being blank. (4) Method of Determining the Successful Bidder: The successful bidder will be the one who submits the lowest valid bid within the limit of the estimated price prepared in accordance with the provisions of Article 79 of the Budget Execution Order. However, if it is deemed that the contractor may not be able to perform the contract in accordance with its terms due to the bid price of the potential successful bidder, or if it is deemed significantly inappropriate because contracting with such person would disrupt the order of fair trade, the bidder with the next lowest bid price within the limit of the estimated price may be selected as the successful bidder. (5) Confirmation of Assigned Supervising Engineer, etc.: If a violation of the exclusivity rule for assigned supervising engineers, etc., is confirmed through CORINS or other means after the successful bidder has been determined, the contract may not be concluded. Replacement of the application form will not be permitted except in cases where it is approved as unavoidable due to various circumstances. (6) For works requiring the assignment of an exclusive supervising engineer, if the contract is concluded at a price below the investigation standard price, an engineer with equivalent qualifications may be required in addition to the supervising engineer. (Refer to the bid explanation document). (7) Requirement for Contract Document: Required. (8) Whether to conclude a separate contract with the same contractor for other works directly related to this work: None. (9) Inquiry desk for related information: Same as 3. (1). (10) Participation of persons who have not obtained certification of general competitive bidding qualifications: Persons who have not obtained the certification of general competitive bidding qualifications listed in 2. (2) may also submit an application form and documents (hereinafter referred to as "Application Documents, etc.") in accordance with 3. (3), but to participate in the bidding, they must obtain the certification of such qualifications and be confirmed to meet the bidding qualifications by the day before the bid submission deadline. (11) Hearing on the Content of Application Documents, etc.: A hearing on the content of the application documents, etc., will not be held in principle. If it becomes necessary to conduct a hearing, notification will be given separately. (12) Notes on Tender Documents: If the application documents, etc., are not submitted during the qualification examination, or if the content of the application documents, etc., is deemed inappropriate, such as being prepared after consulting with other bidders regarding this work, bidding qualifications will not be granted. (13) This work will be carried out using the electronic procurement system for application documents, etc., and bids. Details regarding the system can be found in the bid explanation document. Electronic Procurement System URL: https://www.geps.go.jp (14) For details, refer to the bid explanation document. End of announcement.
- 1 - Bid Explanation Document Regarding open competitive bidding for construction work commissioned by the Shinetsu Environmental Office, in addition to the provisions of relevant laws and regulations, this bid explanation document shall apply. 1. Date of Announcement: June 19, 2024 2. Contracting Officer, etc.: Delegated Discretionary Expenditure Authority Officer, Chubu Regional Environmental Office, Shinetsu Environmental Office Director, Hideaki Matsumoto 3. Outline of Work (1) Work Name: FY2026 Myoko-Togakushi Mountain National Park Myoko Highland Visitor Center Entrance Renovation Work (2) Work Location: 2248-4 Sekikawa, Myoko City, Niigata Prefecture (3) Work Details: As per separate drawings and specifications (4) Work Period: From the day after the contract is concluded until January 8, 2025 (5) This work is subject to the electronic procurement system for submission of documents and bidding. If it is difficult to use the electronic procurement system, paper bidding may be substituted with the approval of the contracting party. 1) The window and reception hours for this application are as follows. - Reception Window: Same as 6. - Reception Hours: 9:00 AM to 5:00 PM (excluding 12:00 PM to 1:00 PM). However, national holidays as defined in Article 1 of the Act on National Holidays (Act No. 91 of 1988) (Saturdays, Sundays, public holidays, and December 29 to January 3) are excluded. 2) Once the procedure has begun using the electronic procurement system, mid-process changes to the paper bidding method are generally not permitted. However, exceptions may be made if the bidder has unavoidable circumstances and the contracting party deems that it will not affect the overall bidding process. (6) This work is subject to the "Two-Day Weekend Work (Site Closure Type)" which ensures two days off per week through site closure. The concept of two days off per week is as follows. A. Two days off per week on a monthly basis means that during the site construction period, it is recognized that at least four weeks and eight days off have been provided each month. Two days off per week on a full-term basis means that at least four weeks and eight days off have been provided during the site construction period. B. The site construction period is the period from the start of work to the completion of work, excluding the year-end and New Year holidays (6 days), summer holidays (3 days), periods of factory production only, periods of temporary suspension of the entire work, and periods where site work is unavoidable due to reasons not attributable to the contractor. C. Four weeks and eight days off or more on a monthly basis means that the ratio of site closure days in each month within the site construction period reaches a level of 28.5% (8 days / 28 days) or more. However, in months where the ratio of Saturdays and Sundays in the calendar is less than 28.5%, it means that site closure has been carried out for at least the total number of Saturdays and Sundays in that month. Four weeks and eight days off or more on a full-term basis means that the ratio of site closure days within the site construction period reaches a level of 28.5% (8 days / 28 days) or more. Unplanned site closure days due to rain, snow, bad weather, etc., shall also be included in the number of site closure days. D. Site closure days refer to days when the site and site office are closed for the entire day, excluding days when necessary work for site management, such as patrol inspections and maintenance checks, is performed. 4. Qualifications for Bidding Participation (1) Not subject to the provisions of Article 70 and Article 71 of the Order on Budget, Settlement and Accounting (Imperial Ordinance No. 165 of 1947) (hereinafter referred to as "Budget Execution Order"). (2) Registered in "Building Construction" for FY2025-2026 open competitive bidding qualifications by the Ministry of the Environment, and certified as C or D grade. Or, registered in "Natural Environment Symbiosis Construction" and certified as A or B grade. (For those for whom rehabilitation proceedings have been initiated based on the Corporate Rehabilitation Act (Act No. 154 of 2002) or for whom reconstruction proceedings have been initiated based on the Civil Reconstruction Act (Act No. 225 of 1999), re-certification of open competitive bidding qualifications based on procedures separately established by the Ministry of the Environment after the decision to commence proceedings has been made). (3) Not a person for whom rehabilitation proceedings have been initiated based on the Corporate Rehabilitation Act or for whom reconstruction proceedings have been initiated based on the Civil Reconstruction Act (excluding those who have received re-certification as per (2) above). (4) Must have experience in constructing the same type of work as specified below, completed and delivered as the prime contractor since FY2011. (Experience as a member of a joint venture is limited to cases where the contribution ratio is 20% or more). The total evaluation score for such work experience must be 65 points or more. For ongoing construction joint ventures, any member must have experience in constructing the same type of work as specified below as the prime contractor since FY2011. 1) Same type of work: Experience in building construction commissioned by national or local governments. (5) Must be able to assign a chief engineer or supervising engineer who meets the following criteria to this work. 1) Must hold a Class 1 or Class 2 Construction Management Engineer qualification, or equivalent or higher. 2) The same person must have experience in the work listed in (4) above since FY2011...
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 19, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 環境省信越自然環境事務所
環境省信越自然環境事務所 has issued 9 procurement notices on BidsFactory, including 4 currently open and 3 awarded contracts. Activity concentrates in Construction & Civil Works, Transport & Logistics, and Environment & Climate. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 21, 2026.
Frequently asked questions about this tender
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Who is the contracting authority?
This notice was issued by 環境省信越自然環境事務所 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.