Tender Number 80_Road Lighting Renewal Work (File: 6.7MB)
Drawing Number 1 2 3 4 5 6 Location Drawing Reference Drawing Reiwa 8 Road Lighting Renewal Work Work Name Drawing Name Standard Design Drawing 1 (LED Road Lighting) Standard Design Drawing 2 (LED Road Lighting) LED Luminaire Detail Drawing 1 LED Luminaire Detail Drawing 2 Location Map: Senbodai Street: Hayamichi Street (2 locations) Each site/facility Location Map: West Coast Line 297: Hiroji Street (3 locations) 2642331695656 Lighting poles only (Completed for Reiwa 7) 297 169 264 Full renewal 233 235 237 Luminaires only 237235EDG.LG.L Reference Drawing Sub-base (crushed stone 0-40mm grade) t=10cm 1:0.55007001100 835(885)100 200 300200 1500(1600)1φ2W100V Incoming Band (galvanized) Internal wiring VVF2.0×2C-2 (overhead) Straight taper pole (galvanized) (oval) Control unit housing window Nameplate 100×80 White plating LED lighting control unit Safety breaker 2P15A Surface layer (recycled fine aggregate As13mm) t=3cm Anchor bolt (galvanized) PF-Sφ16 (conduit) Foundation concrete 4-φ25×Lσck=18N/mm2200 1500(1600) 600(680)750φ1755007008000170 100 302585(2685)2720(2820)2770(2870)1670(1770) *Dimensions in parentheses are for oval shape Surface layer (recycled fine aggregate As13mm) t=3cm Frost heave suppression layer (crushed stone 0-80mm grade) t=17cm Sub-base (crushed stone 0-40mm grade) t=10cm Frost heave suppression layer (crushed stone 0-80mm grade) t=17cm Foundation material (crushed stone 0-80mm grade) S=1:10 S=1:20 Date of creation Company Name Scale Drawing Name Work Name Drawing Number Hokkaido Rumoi City Road Lighting Renewal Work Lighting Drawing Illustration Reiwa 8 Year Month Day Cost Breakdown Sheet Year Month Day To Company Name: Representative Name: Control Number No. Work Name Road Lighting Renewal Work Unit Quantity Amount Road Maintenance Type 1 Paving Work Type 1 Asphalt Paving Work Type 1 Road Ancillary Facilities Work Type 1 Earthwork Type 1 Road Ancillary Facilities Work Work Classification/Type/Category - 1 - Cost Breakdown Sheet Work Name Road Lighting Renewal Work Unit Quantity Amount Work Classification/Type/Category Type 1 Lighting Work Type 1 Structure Removal Work Type 1 Road Ancillary Structure Removal Work Type 1 Structure Demolition Work Type 1 Transport and Disposal Work Type 1 Temporary Work Type 1 Traffic Management Work Type 1 Direct Construction Cost Type 1 - 2 - Cost Breakdown Sheet Work Name Road Lighting Renewal Work Unit Quantity Amount Work Classification/Type/Category Including Material Costs Type 1 Including Labor Costs Type 1 Common Temporary Work Costs Type 1 Common Temporary Work Costs (Rate Basis) Type 1 Net Construction Cost Type 1 Site Management Costs Type 1 Including Employer's Share of Statutory Welfare Costs Type 1 Including Construction Pension System Contributions Type 1 Construction Cost Type 1 - 3 - Cost Breakdown Sheet Work Name Road Lighting Renewal Work Unit Quantity Amount Work Classification/Type/Category Including Safety and Health Expenses Type 1 General Administrative Costs, etc. Type 1 Construction Price (= Bidder's Estimate) Type 1 Note 1 When submitting the breakdown sheet in electronic format, please attach it to the bid with the company name (or JV name) indicated. When submitting the breakdown sheet in paper format, the signature and seal are required, similar to the bid. 2 Do not include baseless rounding or reductions under the names of "discount", "adjustment amount", "volume discount", etc. Cost Breakdown Sheet_xlfn.IFERROR&C&16 Cost Breakdown Sheet&L&R&C- &P -Year Month Day, To, , Company Name:, Representative Name:, Control Number, No., Work Name, Road Lighting Renewal Work,, Work Classification/Type/Category, Unit, Quantity, Amount, Road Maintenance,,,,Type,1,,,,Paving Work,,,,Type,1,,,,Asphalt Paving Work,,,,Type,1,,,,Road Ancillary Facilities Work,,,,Type,1,,,,Earthwork,,,,Type,1,,,,Road Ancillary Facilities Work,,,,Type,1,,,,Lighting Work,,,,Type,1,,,,Structure Removal Work,,,,Type,1,,,,Road Ancillary Structure Removal Work,,,,Type,1,,,,Structure Demolition Work,,,,Type,1,,,,Transport and Disposal Work,,,,Type,1,,,,Temporary Work,,,,Type,1,,,,Traffic Management Work,,,,Type,1,,,,Direct Construction Cost,,,,Type,1,,,,Including Material Costs,,,,Type,1,,,,Including Labor Costs,,,,Type,1,,,,Common Temporary Work Costs,,,,Type,1,,,,Common Temporary Work Costs (Rate Basis),,,,Type,1,,,,Net Construction Cost,,,,Type,1,,,,Site Management Costs,,,,Type,1,,,,Including Employer's Share of Statutory Welfare Costs,,,,Type,1,,,,Including Construction Pension System Contributions,,,,Type,1,,,,Construction Cost,,,,Type,1,,,,Including Safety and Health Expenses,,,,Type,1,,,,General Administrative Costs, etc.,,,,Type,1,,,,Construction Price (= Bidder's Estimate),,,,Type,1,,,,Note 1 When submitting the breakdown sheet in electronic format, please attach it to the bid with the company name (or JV name) indicated. When submitting the breakdown sheet in paper format, the signature and seal are required, similar to the bid. , 2 Do not include baseless rounding or reductions under the names of "discount", "adjustment amount", "volume discount", etc. , Mirror (excluding gold specified) Road Lighting Renewal Work Execution Design Book - 1 - Estimate Reference Material This material is for reference when calculating the bid amount and does not have contractual restrictions. 2026 Fiscal Year Implementation 26-15-A0-0147-0 Rumoi City Sole 1 Page Reference Material Mirror (Cost Estimation Information) Rumoi City Completion Deadline: March 29, 2027 2 Pages Location of Work: March 29, 2027 G00: Rumoi Construction Management Department Joint Materials G02: Rumoi City Design and Construction Name Normal Construction Period 26-15-A0-0147-0 Setting of Construction Period Port Stone Winter Labor Adjustment Applicable Work Type G76: Rumoi Port Stone Construction Period Setting: August 24, 2026 to August 24, 2026 Estimated Construction Period: September 30, 2026 to March 29, 2027 (181 days) 26-15-A0-0147-0 Time Constraints: Production Cost September 2026 Unit Price Application Year Month September 2026 September 29, 2026 Area Time Constraints None General Civil Engineering Work Unit Price Application Year Month Applicable Unit Price G01: Rumoi City, Mashike Town, Obira Town Actual Construction Period: 181 days G01: Rumoi City, Obira Town (West) None Road Maintenance Work Cost Estimation Information Mirror (Work Overview List) 30002 1st Class Municipal Road Senbodai Line 7 Work 626-15-A0-0147-0 Water System/Road River Name 0010 1st Class Municipal Road Hayamichi Line Project Type No. 2 Road Lighting Pole Removal N=4 poles Suehirocho 1, 2 Hanazoncho 5 Road Lighting Pole N=4 poles Segoecho Okimicho 5 Road Lighting Luminaire Replacement N=3 units Work Overview List - 3 - Change Work Location 0011 1st Class Municipal Road Hiroji 3 pages 1 Key Road Stock Improvement Project Road Lighting Renewal Work 0001 1st Class Municipal Road West Coast Line Cost Item 4 Work Overview Bridge Name, etc. Initial Construction Cost 5 Overhead Expenses Information - 4 - Urban Area Adjustment None None Site Environment Improvement Costs 26-15-A0-0147-0 2026/08 Emergency Work Adjustment No Adjustment (For rural areas where the construction site is not affected by general traffic, etc.) Adjustment by Advance Payment Ratio 13: Road Maintenance Work Construction Area Adjustment 4 weeks 8 days or more (monthly basis) (R6 standard) Adjustment for Extension of Construction Period None (For rural areas where the construction site is not affected by general traffic, etc.) No Adjustment Construction Area Adjustment ICT Adjustment Urban Area Adjustment None (For rural areas where the construction site is not affected by general traffic, etc.) Over 35% Adjustment for Contract Guarantee Extension Period Final Day Standard Month None Snow Removal Work Adjustment Foundation etc. Adjustment None Sand control/landslide work adjustment Weekly Holiday 2-day system adjustment None 0 days Site Management Costs Site Maintenance Costs due to Construction Period Extension, etc.