Water Distribution Pipe Improvement Project: New Access Road Construction for Water Conduit [August 25]
About This Opportunity
This is a works contract in the architecture and engineering, construction and civil works and water and sanitation sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from JapaneseWater Distribution Pipe Improvement Project: New Access Road Construction for Water Conduit [August 25]
An open competitive tender will be held, and notice is hereby given as follows, in accordance with Article 4 of the Kushiro City Contract Regulations (2005 Kushiro City Ordinance No. 83; hereinafter referred to as "Contract Regulations"). July 27, Reiwa 8. Director General of Kushiro City Public Enterprise, Yuji Saito. Record. 1. Matters for Tender (1) Name of Work: Water Distribution Pipe Improvement Project: New Access Road Construction for Water Conduit (2) Work Number: 2026005159 (3) Location of Work: Hiro-sato, Kushiro City (4) Outline of Work: A. Load-bearing fill removal V=910㎥, Embankment fill V=7,420㎥, Sand mat V=2,090㎥, etc. B. Estimated Price: To be announced after the fact, in accordance with Article 7, Paragraph 1 of the Contract Regulations. (5) Period of Work: From August 27, Reiwa 8 to March 23, Reiwa 9. (6) This work is subject to the monthly "Two-Day Weekend Work" program. Please note that expenses related to Two-Day Weekend Work are included in the design amount. 2. Procurement Method: (1) This work will be performed by a specific joint venture using a joint construction method. (2) Applicants wishing to participate in the tender must meet the tender participation qualifications listed below for the members of the joint venture, the tender participation conditions listed in Section 4 below, and the conditions listed in Section 5 below, and must form a joint venture voluntarily before applying for tender participation. 3. Matters Concerning Tender Participation Qualifications for Joint Venture Members (as defined in Article 167-5, Paragraph 1 of the Local Autonomy Act Enforcement Order (1947 Cabinet Order No. 16; hereinafter referred to as "Enforcement Order"), meaning the tender participation qualifications stipulated in Article 3 of the Contract Regulations; hereinafter the same): Must be registered as a civil engineering contractor in the Reiwa 2025/2026 Kushiro City Construction Work Competitive Tender Participant Qualification List and have received an "A" rating. However, this also includes those certified as having an upper-level rating (skip-grade) due to the Reiwa 7 Fiscal Year Kushiro City Excellent Construction Award. 4. Matters Concerning Tender Participation Conditions for Joint Venture Members (as defined in Article 167-5, Paragraph 2 of the Enforcement Order, meaning the tender participation qualifications stipulated in Article 2, Paragraph 4 of the Contract Regulations; hereinafter the same): Applicants wishing to participate in the tender must meet all of the following conditions as of the application date. (1) Each member must not fall under Article 167-4 of the Enforcement Order. (2) Each member must not be subject to designation suspension measures based on the provisions of the Kushiro City Construction Work Designation Suspension Handling Guidelines from the date of announcement to the date of tender execution. (3) Each member must not be a person who has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (2002 Act No. 154) or commencement of rehabilitation proceedings under the Civil Rehabilitation Act (1999 Act No. 225). However, this excludes cases where re-certification of Kushiro City's competitive tender participation qualification has been obtained after the decision to commence rehabilitation proceedings or rehabilitation proceedings. (4) Each member must not be a "B" designated entity, "B" member, or "B" related business operator as defined in Article 2 of the Kushiro City Anti-Boryokudan Ordinance (2012 Kushiro City Ordinance No. 33). (5) Each member must have a head office within Kushiro City. (6) Each member must not have received an "E" rank evaluation for two consecutive years based on the performance evaluation stipulated in the Kushiro City Contract Work Performance Evaluation Guidelines within the two years prior to the application date. (7) Each member must not be a contractor for design work, etc. related to this work, or a party related to such contractor in terms of capital or personnel. (8) There must be no relationship between tender participants that falls under any of the following criteria (excluding cases where all parties with such a relationship are members other than the representative of the joint venture). Note: Capital and personnel relationships in (7) and (8) refer to the following. Furthermore, if such a relationship exists, contacting parties to decide who will withdraw does not fall under Article 6, Paragraph 2 of the Kushiro City Construction Work Tender Guidelines. A. Capital Relationship: In the case of two companies falling under any of the following. However, this excludes cases where a subsidiary, etc. (meaning a subsidiary, etc. as defined in Article 2, Item 3-2 of the Companies Act (2005 Act No. 86); hereinafter the same) or one of the subsidiaries is a company undergoing reorganization as defined in Article 2, Item 7 of the Corporate Reorganization Act (2002 Act No. 154) or a company undergoing rehabilitation proceedings as defined in Article 2, Item 4 of the Civil Rehabilitation Act (1999 Act No. 225) (hereinafter referred to as "company undergoing reorganization, etc."). (A) Relationship between a subsidiary, etc. and a parent company, etc. (meaning a parent company, etc. as defined in Article 2, Item 4-2 of the Companies Act; hereinafter the same). (B) Relationship between subsidiaries, etc. with the same parent company, etc. B. Personnel Relationship: In the case of two companies falling under any of the following. However, (A) excludes cases where one of the companies, etc. (meaning a company, etc. as defined in Article 2, Item 3-2 of the Companies Act Enforcement Regulations (2006 Ministry of Justice Ordinance No. 12); hereinafter the same) is a company undergoing rehabilitation proceedings as defined in Article 2, Item 4 of the Civil Rehabilitation Act (1999 Act No. 225) or a company undergoing reorganization as defined in Article 2, Item 7 of the Corporate Reorganization Act (2002 Act No. 154). (A) A person who is currently an executive of one company, etc. (meaning an executive as defined in Article 2, Item 3-3 of the Companies Act Enforcement Regulations, including the following; hereinafter the same) is also an executive of the other company, etc. 1) Director of a stock company. However, the following are excluded: ① Director who is a member of the audit and supervisory committee in a company with an audit and supervisory committee as defined in Article 2, Item 11-2 of the Companies Act. ② Director of a company with a nomination committee, etc. as defined in Article 2, Item 12 of the Companies Act. ③ Outside director as defined in Article 2, Item 15 of the Companies Act. ④ Director whose duties are not to execute business as stipulated in the articles of incorporation under Article 348, Paragraph 1 of the Companies Act. 2) Executive officer of a company with a nomination committee, etc. as defined in Article 402 of the Companies Act. 3) Member of a partnership company (meaning a general partnership company, limited partnership company, or limited liability company) as defined in Article 575, Paragraph 1 of the Companies Act (excluding members whose duties are not to execute business as stipulated in the articles of incorporation under Article 590, Paragraph 1 of the same Act). 4) Director of a cooperative. 5) Other persons executing business who are equivalent to those listed in 1) to 4). (B) A person who is currently an executive of one company, etc. is also a trustee (hereinafter referred to as "trustee") appointed under Article 64, Paragraph 2 of the Civil Rehabilitation Act or Article 67, Paragraph 1 of the Corporate Reorganization Act for the other company, etc. (C) A trustee of one company, etc. is also a trustee of the other company, etc. C. Other: Cases where the fairness of the tender is deemed to be impeded, such as when a cooperative and its members participate in the same tender, or other capital or personnel relationships equivalent to A or B are recognized. (9) Each member must be able to appropriately assign a supervising engineer or chief engineer and a site manager for the construction industry law permission type corresponding to the work to the construction site. However, the site manager shall be assigned by the representative of the joint venture. 5. Joint Venture Formation Conditions: Applicants wishing to participate in the tender must form a joint venture that meets the following conditions. (1) Each member shall not be a member of two or more joint ventures for this tender. (2) The number of members shall be two. (3) The share ratio of each member shall be at least 30%. (4) The share ratio of the representative of the joint venture shall not be less than that of other members. (5) At least one of the members must have experience as the prime contractor for construction work of the same or similar scale (hereinafter referred to as "same scale work"). However, this is limited to work where the construction objective has been delivered. If the prime contractor experience for the same scale work was as a joint venture, the share ratio must be 20% or more. Same scale work refers to prime contractor experience in road improvement work or sewer construction work in public works. 6. Tender Participation Application (1) Applicants wishing to participate in the tender must submit the following application documents in person. A. Application Documents: (A) Open Competitive Tender Participation Qualification Confirmation Application Form (Form 1-2). (B) Tender Participation Qualification Confirmation Statement (Form 2) [For each member]. (C) Documents proving construction experience of the same scale work. (D) Documents proving technical qualifications of assigned engineers, etc. (E) Application for Corporate Reorganization Act and Civil Rehabilitation Act (Form 3) [Submit only if applicable]. (F) Specific Construction Work Joint Venture Competitive Tender Participation Qualification Review Application Form (Separate Form 1). (G) Specific Construction Work Joint Venture Agreement (Separate Form 2). B. Submission Period: Daily from July 27, Reiwa 8 to August 17, Reiwa 8, excluding holidays of Kushiro City institutions as defined by the Kushiro City Holidays Ordinance (2005 Kushiro City Ordinance No. 2; hereinafter referred to as "Kushiro City Holidays"), from 9:00 to 17:00. C. Submission Location: Kushiro City General Affairs Department, Contract Management Division, Contract Section, 7-5 Kurogane-cho, Kushiro City, Postal Code 085-8505. Telephone: 0154-31-4508. (2) Application documents for confirmation of tender participation qualifications can be downloaded from the Kushiro City Hall website from the date of this announcement. (3) Persons who fail to submit application documents by the deadline or are deemed unqualified will not be permitted to participate in the tender for the work. (4) Other: A. Expenses incurred in preparing application documents shall be borne by the applicant. B. Submitted documents shall not be used for purposes other than those intended without the applicant's consent. C. Submitted application documents shall not be returned. D. Replacement or re-submission of documents after the deadline will not be permitted. 7. Tender Participation Qualification Notification: The results of the tender participation qualification review will be notified via the "Open Competitive Tender Participation Qualification Confirmation Notice" (hereinafter referred to as "Confirmation Notice"). (1) Notification Date and Time: August 21, Reiwa 8, 13:00 to 17:00. (2) Notification Location: Same as 6(1)C. (3) Other: A. The Confirmation Notice will be handed directly to the applicant at the location indicated in (2) through the prescribed procedure at the time of application. Notification by mail or other means will not be provided. B. Inquiries regarding the confirmation results by phone, etc., will not be accepted. 8. Explanation of Reasons for Disqualification (1) Those deemed unqualified may request an explanation of the reasons for disqualification from the city in writing by August 21, Reiwa 8. (2) The written explanation in (1) must be submitted in person to the Kushiro City General Affairs Department, Contract Management Division, Contract Section. (3) For those who request an explanation, a response will be provided by August 24, Reiwa 8. 9. Inspection of Design Documents, etc. (1) Design documents for the work will be made available for inspection as follows. A. Inspection Period: From 9:00 on July 27, Reiwa 8 to 17:00 on August 24, Reiwa 8. B. Inspection Location and Method: Documents are to be downloaded from the Kushiro City website. When downloading design documents, a password is required, so please submit a "Password Inquiry Application Form" to the Kushiro City General Affairs Department, Contract Management Division, Contract Section. (2) Inquiries regarding design documents should be submitted in person or by mail using the prescribed inquiry and response form to the reception location as follows. A. Reception Period: Same as 6(1)B. B. Reception Location: Kushiro City Waterworks Bureau, Waterworks Development Division, Construction Section, 2-1-121 Minami-Oodori, Kushiro City, Postal Code 085-0841. Telephone: 0154-43-2163. (3) Answers to inquiries (if any) will be made available for inspection as follows. A. Inspection Period: From 10:00 on August 19, Reiwa 8 to 17:00 on August 24, Reiwa 8. B. Inspection Location: Same as (1)B. 10. Date and Time and Location of Tender Execution (1) Date and Time: August 25, Reiwa 8, 10:00. (2) Location: Meeting Room B, 5th Floor, Kushiro City Disaster Prevention Building, 8-2 Kurogane-cho, Kushiro City. 11. Minimum Reserve Price System: A minimum reserve price will be set in accordance with the Kushiro City Minimum Reserve Price Setting Guidelines and will be publicly announced after the fact. 12. Tender Method, etc. (1) Bidders must fill in the necessary items on the prescribed tender form and bid breakdown and submit them. (2) For the determination of the successful bidder, the amount obtained by adding 10% of the bid amount to the bid amount (if there is a fraction of less than 1 yen, that fraction will be rounded down) will be the successful bid price. Therefore, bidders must state in their bid the amount equivalent to 100/110 of their estimated contract desired amount, regardless of whether they are a taxable or tax-exempt business with respect to consumption tax. (3) The number of tenders will be up to 3 times. However, those who have withdrawn from the first or second tender or submitted invalid bids cannot participate in subsequent tenders. (4) If there are no bids below the estimated price in the third tender, a negotiated contract will be pursued. In the case of a negotiated contract, quotations will be solicited from two or more bidders, including the bidder with the lowest bid price. (5) If a negotiated contract cannot be concluded, the tender will be canceled, and a new tender will be announced. 13. Invalid Tenders: Tenders falling under any of the following will be deemed invalid. (1) Tenders falling under any of the items in Article 10 of the Contract Regulations. (2) Tenders submitted by persons who do not meet the conditions specified in this announcement. (3) Tenders submitted with false information in the application documents. (4) Other, as per Article 8 of the Kushiro City Tender Guidelines. 14. Bid Bond: Exempt, in accordance with Article 6, Item 3 of the Contract Regulations and Article 2, Section 1, Item 3, Item 2(A) of the "Regarding the Enforcement of Kushiro City Contract Regulations" (2005 Kushiro City Notice No. 3; hereinafter referred to as "Enforcement of Regulations"). 15. Method of Determining Successful Bidder: (1) Among those who bid within the limit of the estimated price, the bidder with the lowest bid price will be determined as the successful bidder. However, bidders who bid below the minimum reserve price will be disqualified and cannot participate in subsequent tenders. (2) If there are two or more bidders with the lowest valid bid price, a lottery will be held among them to determine the successful bidder. Refusal to participate in the lottery is not permitted. 16. Announcement of Tender Results: Tender results will be announced on the Kushiro City Hall website by 17:00 on the tender date. 17. Submission of Contract Price Breakdown: (1) The successful bidder must promptly submit a contract price breakdown after the successful bid determination. (2) The format of the contract price breakdown is free, but it must at least clarify quantities, unit prices, amounts, and costs for materials, labor, statutory benefits, safety and health expenses, and contributions to the Construction Industry Retirement Allowance Mutual Aid Association. (3) The contract price breakdown is requested as a reference document. 18. Contract Conclusion Deadline: The deadline for concluding the contract for this work is August 27, Reiwa 8. If the contract is not concluded by the deadline, the successful bid will be canceled. 19. Contract Security Deposit: Exempt, in accordance with Article 30, Item 6 of the Contract Regulations and Article 3, Section 1, Item 4, Item 2(A) of the "Regarding the Enforcement of Regulations" related to Article 30 of the Regulations.
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on July 27, 2026. Last refreshed today. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 北海道釧路市
北海道釧路市 has issued 123 procurement notices on BidsFactory, including 36 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Urban Development & Housing. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: July 27, 2026.
Frequently asked questions about this tender
What type of contract is this?
This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Who is the contracting authority?
This notice was issued by 北海道釧路市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.