[Revision of Tender Documents dated June 25, Reiwa 8] Pavement Improvement Work on Major Prefectural Road Yano-Yasu Line (8-1) (Bidding scheduled for July 13, Reiwa 8)
About This Opportunity
This is a works contract in the transport and logistics and construction and civil works sectors. Located in Japan, Asia, this opportunity is open to firms and consortiums.
Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the transport and logistics sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Auto-translated from Japanese[Revision of Tender Documents dated June 25, Reiwa 8] Pavement Improvement Work on Major Prefectural Road Yano-Yasu Line (8-1) (Bidding scheduled for July 13, Reiwa 8)
[Revision of Tender Documents dated June 25, Reiwa 8] Pavement Improvement Work on Major Prefectural Road Yano-Yasu Line (8-1) (Bidding scheduled for July 13, Reiwa 8) Page number 1051299 Update date June 25, 2026 Project number: 2026100142001 Project name: Pavement Improvement Work on Major Prefectural Road Yano-Yasu Line (8-1) Ordering agency: Hiroshima City Procurement category: Construction Work Department in charge of construction: Aki Ward Office, Agriculture, Forestry and Construction Department, Regional Development Division Contract department: Finance Bureau, Contract Division Bidding date: June 19, Reiwa 8 Bid opening date: July 13, Reiwa 8 Remarks: The design documents (or public quantity documents) have an addition, so they will be replaced. The statement number has been added to the remarks column of the breakdown table. Please download the following files and replace them. Attached files Design documents (or public quantity documents) (Excel 44.2KB) Inquiries regarding this page Aki Ward Office, Agriculture, Forestry and Construction Department, Regional Development Division, First Regional Development Section 736-8501 Hiroshima City, Aki Ward, Funakoshi Minami 3-chome, 4-36 Phone: 082-821-4935 (First Regional Development Section) Fax: 082-823-6358 [email protected]
Cover Page Breakdown Statement Expense Information Construction Design Documents, Technical Management Section, Design, Verification, Verification, Comparison, Section Chief, Assistant Section Chief, Section Chief, Section, Section Chief, Section Chief, Supervisor, Design, Reiwa 08 Fiscal Year, Aki Ward Office, Agriculture, Forestry and Construction Department, Regional Development Division, First Regional Development Section, Reiwa, May 08, Construction Name, Construction Period, Pavement Improvement Work on Major Prefectural Road Yano-Yasu Line (8-1), 150 days from contract signing, until Year Month Day, Construction Location, Aki Ward, Yano Town, Budget Item, Construction Amount, (Breakdown), Accounting General Account, (Category) Civil Engineering Expenses, Amount Yen, (Item) Road and Bridge Expenses, (Sub-item) Road New Construction and Improvement Expenses, Reason for Construction, This construction is to improve the road surface pavement which has deteriorated and is hindering traffic.
,Construction Details,Construction Length,152,m,Paving Work,1,Set,Line Marking Work,1,Set,Temporary Work,1,Set, (Continued),"&L&"MS Mincho,Standard"&11 &C&"MS Mincho,Standard"&11 - &P - &R&"MS Mincho,Standard"&11 The construction conditions in these design documents are for reference in estimation and will be deleted in the contract.
Hiroshima City",Breakdown Table, (Upper: Previous, Lower: Current),Expense Item / Construction Category / Construction Type / Classification,Quantity,Unit,Unit Price,Amount,Remarks,Direct Construction Cost,Paving,Paving Work,Paving Work,1,Set, Statement No. 0001,Line Marking Work,Line Marking Work,1,Set, Statement No. 0002,Temporary Work,Traffic Management Work,1,Set, Statement No. 0003,Total Direct Construction Cost,Total Common Temporary Work,Common Temporary Work (Integral),Transportation Expenses,1,Set, Statement No. 9001,Common Temporary Work (Ratio),1,Set,Breakdown Table, (Upper: Previous, Lower: Current),Expense Item / Construction Category / Construction Type / Classification,Quantity,Unit,Unit Price,Amount,Remarks,Net Construction Cost,Site Management Expenses,1,Set,Construction Cost,General Administrative Expenses, etc.,1,Set, (Included) Contract Guarantee Fee,1,Set,Construction Price,Consumption Tax and Local Consumption Tax Equivalent,1,Set,Total Direct Construction Cost, "&L&"MS Mincho,Standard"&11 &C&"MS Mincho,Standard"&11 - &P - &R&"MS Mincho,Standard"&11 The construction conditions in these design documents are for reference in estimation and will be deleted in the contract.
Hiroshima City",Statement No. 0001,Paving Work, 1 Set,Paving Work, (Upper: Previous, Lower: Current),Name,Quantity,Unit,Unit Price,Amount,Remarks,Milling and Overlay,Daytime 1, "J02=Exceeding 7cm up to 12cm, J03=Two layers, J04=Roadway and",and shoulder,J06=Pavement thickness (first layer) 60 mm,J07=Pavement"," 1,570",m2,"Thickness (second layer) 50 mm,J08=Various asphalt materials,J09=","Various asphalt materials,J10=Density after compaction (first layer) 2.","35 t/m3,J11=Density after compaction (second layer) 2.35 t/m3",",J12=Prime coat,J14=Various,J15=Asphalt binder application rate (second","layer) 43 liters/100m2,J16=No small vehicle surcharge",Pavement slab cutting,Daytime 1, "J01=Asphalt pavement slab, J02=15cm or less, J05=All included",21,m,Shell transport (road surface milling),Daytime 1, "J01=No DID section, J02=Up to 7.5km, J04=All included",172,m3,Shell disposal Asphalt shell, "J01=Asphalt shell, J03=Daytime delivery",405,t, (Included) Disposal fee,Total, (Included) Disposal fee,Statement No. 0002,Line Marking Work, 1 Set,Line Marking Work, (Upper: Previous, Lower: Current),Name,Quantity,Unit,Unit Price,Amount,Remarks,Line marking installation,Daytime 1, "J01=Melt type (manual), J02=Solid line Width 15cm, J03=In-use","section,J04=Normal pavement (excluding permeable pavement),J05=1.5m", 460,m,"m,J06=White,J07=Melt type Glass beads content 15-18","% ,J08=Asphalt pavement,J09=All costs",Line marking installation,Daytime 1, "J01=Melt type (manual), J02=Solid line Width 15cm, J03=In-use","section,J04=Normal pavement (excluding permeable pavement),J05=1.5m", 150,m,"m,J06=Yellow (lead/chromium-free),J07=Melt type Glass beads","Content 15-18% ,J08=Asphalt pavement,J09=All",costs,Line marking installation,Daytime 1, "J01=Melt type (manual), J02=Broken line Width 15cm, J03=In-use","section,J04=Normal pavement (excluding permeable pavement),J05=1.5m", 76,m,"m,J06=White,J07=Melt type Glass beads content 15-18","% ,J08=Asphalt pavement,J09=All costs",Total,Statement No. 0003,Temporary Work, 1 Set,Traffic Management Work, (Upper: Previous, Lower: Current),Name,Quantity,Unit,Unit Price,Amount,Remarks,Traffic guidance guard personnel,J01=Traffic guidance guard personnel B,30,Person-days,Total,Statement No. 9001, 1 Set,Transportation Expenses, (Upper: Previous, Lower: Current),Name,Quantity,Unit,Unit Price,Amount,Remarks,Transportation expenses by cargo vehicle,J01=Road milling machine (wheel type, with waste loading device) 2.0m, Outbound,",J02=Up to 20km, J04=No other miscellaneous charges, J06=Transport", 1,Vehicle,Rental fee during transport (depreciation) None,Transportation expenses by cargo vehicle,J01=Road milling machine (wheel type, with waste loading device) 2.0m, Return trip,",J02=Up to 20km, J04=No other miscellaneous charges, J06=Transport", 1,Vehicle,Rental fee during transport (depreciation) None,Total, "&L&"MS Mincho,Standard"&11 &C&"MS Mincho,Standard"&11 - &P - &R&"MS Mincho,Standard"&11 The construction conditions in these design documents are for reference in estimation and will be deleted in the contract.
Hiroshima City",Expense Breakdown Basis Table [Expense Information],Expense Item,Input Information,◆ Main Construction Type,06: Paving Work,◆ Construction Area / Construction Site Classification,3: General Traffic Impact Present ①,◆ Site Environmental Improvement Cost Inclusion Classification,0: Not included,◆ Emergency Work Correction,0: Not corrected,◆ Advance Payment Disbursement Ratio,5: When exceeding 35%,◆ Contract Guarantee Method,2: Monetary Guarantee,◆ 2 Days Off Per Week Correction,C: Correction applied Full 2 Days Off Per Week (Sat/Sun),◆ ICT Correction,0: No correction,◆ Consumption Tax Rate,10.00%,◆ Indirect Labor Costs / Factory Management Costs Inclusion Classification,◆ Applicable Edition,Reiwa 08 May,◆ Unit Price Adoption Area,Aki Ward,Expense Breakdown Basis Table [Legend],Symbol Item,Meaning,◆ Daytime/Nighttime Classification,Content of notation in the unit column of statements, price lists, and special price lists,Blank,Daytime work (8:00-17:00),Daytime 1,When significantly restricted by time during daytime work (work hours: over 4 hours/day up to 7 hours/day),Daytime 2,When restricted by time during daytime work (work hours: exceeding 7 hours/day up to 7.5 hours/day),Nighttime,Nighttime work (20:00-6:00),Nighttime 1,When significantly restricted by time during nighttime work (work hours: over 4 hours/day up to 7 hours/day),Nighttime 2,When restricted by time during nighttime work (work hours: exceeding 7 hours/day up to 7.5 hours/day),Continuous 1,Day and night continuous work in shield and tunneling work,Continuous 2,Night shift in day and night continuous work in shield and tunneling work,Expense Breakdown Basis Table [Legend],Symbol Item,Meaning,◆ Management Cost Classification,Content of notation in the upper right of the remarks column of statements, price lists, and special price lists,Blank,Subject to all indirect costs,1,Subject to site management costs and general administrative costs,2,Subject to factory management costs and general administrative costs,5,Subject to general administrative costs only,7,Subject to factory management costs, indirect labor costs, and general administrative costs,9,Not subject to any indirect costs,K1,Subject to common temporary work only,K2,Subject to site management costs only,K3,Subject to common temporary work and site management costs,K4,Subject to common temporary work and general administrative costs,T,Subject to disposal fees, etc.,"&L&"MS Mincho,Standard"&11 &C&"MS Mincho,Standard"&11 - &P - &R&"MS Mincho,Standard"&11 The construction conditions in these design documents are for reference in estimation and will be deleted in the contract.
Hiroshima City",
Data provenance
This notice is sourced from 官公需 (kkj.go.jp) and was originally published on June 19, 2026. Last refreshed 9 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About 広島県広島市
広島県広島市 has issued 346 procurement notices on BidsFactory, including 112 currently open and 7 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Water & Sanitation. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: August 4, 2026.
Frequently asked questions about this tender
Who is the contracting authority?
This notice was issued by 広島県広島市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Transport & Logistics sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.