Tenders/Proposal for Outsourcing the Publication of "Kōhō Toshima Special Edition" for Reiwa 9
Open🇯🇵JapanConsulting

Proposal for Outsourcing the Publication of "Kōhō Toshima Special Edition" for Reiwa 9

Auto-translated from Japanese
Original title: 令和9年度「広報としま特集版」発行業務委託のプロポーザルを実施します
東京都豊島区
Published: Oct 20, 2026
Updated: Oct 24, 2026
Source: 官公需 (kkj.go.jp)

About This Opportunity

This is a consulting contract in the media and communication and general supplies sectors, with a focus on Public Relations, Advertising and Printing. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for consulting in the media and communication sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Proposal for Outsourcing the Publication of "Kōhō Toshima Special Edition" for Reiwa 9 - 1 - Reiwa 9 "Kōhō Toshima Special Edition" Publication Outsourcing Proposal Recruitment Guidelines 1. Purpose These guidelines establish the necessary matters based on Article 9 of the Toshima City Proposal Implementation Handling Regulations for the procedures to select a contractor through a public proposal method for the publication of the Reiwa 9 "Kōhō Toshima Special Edition". 2. Scope of Work Editing and publication of "Kōhō Toshima Special Edition" *Details are as per the attached "Specifications". 3. Performance Period April 1, Reiwa 9 - March 31, Reiwa 10 *This is a single-year contract, and if the performance of the work is satisfactory, the contract may be extended up to two times (for a total of three years). 4. Proposal Limit Price 29,999,200 yen (tax included) *Proposals exceeding the proposal limit price will not be considered for evaluation. 5. Eligibility Requirements The eligibility requirements for proposal applicants are as follows, and all must be met as of the submission date of the Intent to Participate Application Form (Joint ventures are not permitted). If a proposal applicant no longer meets the eligibility requirements by the time the contract is concluded, they will be disqualified at that point. (1) Must have eligibility to participate in competitive bidding in Toshima City for public relations paper publication and printing services. (2) Must not fall under the provisions of Article 167-4, Paragraph 1 of the Local Autonomy Act (Cabinet Order No. 16 of 1947). (3) Must not be subject to a designation suspension measure under the Toshima City Public Relations Paper Publication and Printing Services Suspension and Designation Suspension Measures Ordinance (Decision by the Director-General of General Affairs, August 1, 2008). (4) Must not be subject to an exclusion from bidding measure under the Toshima City Ordinance on Exclusion of Gangs, etc. (Decision by the Director-General of General Affairs, March 6, 2009). (5) Must not be in a state of financial distress (e.g., when a petition for commencement of rehabilitation proceedings has been filed under Article 17, Paragraph 1 of the Corporate Reorganization Act (Act No. 154 of 2002), when bills or checks have been dishonored, etc.). However, this does not apply if Toshima City deems that the company has overcome its financial distress). (6) Must have experience in creating public relations papers or booklets (excluding printing-only services) for local governments in Tokyo within the past 5 years. (7) The information provided in the submitted documents must not be false. - 2 - 6. Selection Schedule (Tentative) Date | Content October 20, Reiwa 8 (Tuesday) | Start of applicant recruitment (announcement of guidelines, etc.) October 20, Reiwa 8 (Tuesday) - November 2, Reiwa 8 (Monday) | Submission of Intent to Participate Application Form November 6, Reiwa 8 (Friday) - November 12, Reiwa 8 (Thursday) | Acceptance of questions regarding the proposal November 17, Reiwa 8 (Tuesday) - December 2, Reiwa 8 (Wednesday) | Submission of proposal By December 25, Reiwa 8 (Friday) | Notification of first-stage review (document screening) results January 13, Reiwa 9 (Wednesday) | Second-stage review (presentation screening) By January 22, Reiwa 9 (Friday) | Notification of final results Late January, Reiwa 9 | Contract conclusion (tentative) 7. Application Acceptance (1) Acceptance Period October 20, Reiwa 8 (Tuesday) - November 2, Reiwa 8 (Monday) *Acceptance hours are from 9:00 AM to 4:00 PM on business days, excluding Saturdays, Sundays, and national holidays. (2) Submission Method and Location Direct delivery to "20. Document Submission and Inquiries" (Mail is not accepted). (3) Documents to Submit (1 copy each) Document | Content/Notes | Form 1. Intent to Participate Application Form | - | Form 1 2. Articles of Incorporation and Regulations of the Corporation | - | Optional Form 3. Personal Information Protection Measures | Copy of certificate of acquisition of Privacy Mark or ISO27001, etc. (most recent) If the qualification is not held, a written explanation for not holding the qualification and internal regulations demonstrating protection measures, etc. | - 4. Business Overview and Work Experience | Company profile, etc. | - 8. Confirmation of Eligibility Eligibility will be confirmed for those who submit the Intent to Participate Application Form. The "Eligibility Confirmation Notice" will be sent via email on November 6, Reiwa 8 (Friday). Applicants who are not deemed eligible will be notified of the reason. - 3 - 9. Acceptance and Response to Questions After submitting the Intent to Participate Application Form, questions regarding this proposal will be accepted as follows. Questions submitted by any other method will not be accepted. (1) Acceptance Period November 6, Reiwa 8 (Friday) - November 12, Reiwa 8 (Thursday) *Acceptance hours are from 9:00 AM to 4:00 PM on business days, excluding Saturdays, Sundays, and national holidays. (2) Submission Method and Location Submit the Form 3 "Questionnaire" with your questions entered, attached to an email. The form should be in Word format with the extension ".docx". [Recipient] Toshima City Policy Management Department Public Relations Division Public Relations Group [Subject] (Company Name) Inquiry Regarding Proposal for "Kōhō Toshima Special Edition" Publication Outsourcing [Email] A0010509@city.toshima.lg.jp (3) Answers to questions will be emailed to all proposers by November 17, Reiwa 8 (Tuesday). If multiple similar questions are received, they will be answered collectively. The names of the questioners will not be disclosed. 10. Submission of Proposal Documents, etc. Those deemed eligible in section 8 above will be requested to submit the following documents. If the City requests clarification on the content of the proposal, please respond by the specified deadline. (1) Acceptance Period November 17, Reiwa 8 (Tuesday) - December 2, Reiwa 8 (Wednesday) *Acceptance hours are from 9:00 AM to 4:00 PM on business days, excluding Saturdays, Sundays, and national holidays. (2) Submission Method and Location ① Written Documents: Direct delivery to "20. Submission Location and Inquiries" (Mail is not accepted). ② Electronic Data: Submit via email to the following address. [Recipient] Toshima City Policy Management Department Public Relations Division Public Relations Group [Subject] (Company Name) Proposal for "Kōhō Toshima Special Edition" Publication Outsourcing [Email] A0010509@city.toshima.lg.jp - 4 - (3) Documents to Submit | Form | Remarks | Number of Copies 1. Proposal Submission Form | *Seal required | - | 1 2. Proposal Document (Original) | *Seal required | A4 landscape format *No specific format Create the proposal document covering the following items: ① Concept for design, layout, and page composition ② Production schedule (including proposal meetings, submission, proofreading, and delivery) ③ Creation of title logo for "Kōhō Toshima" (2 options for Japanese notation, 2 options for Roman alphabet notation with furigana: "TOSHIMA Kōhō Toshima") ④ Estimated total cost (including tax) *Provide breakdown for every 8 pages in 4 colors and every 4 pages in 4 colors. ⑤ Name, weight, and recycled paper content of paper to be used ⑥ Points to note and features in the creation of the public relations paper ⑦ System for interviews/reporting and manuscript creation, past achievements, etc. ⑧ Crisis management system (response to sudden manuscript changes or reprints due to errors in the final stages of production) ⑨ Number of staff assigned to this work (specify by task) ⑩ Health management system for assigned staff | - | 3 3. "Kōhō Toshima" Page Design Draft | Tabloid format *4 pages, 4 colors Create the page layout in accordance with the attached "Specifications". *Materials can be freely collected from "Kōhō Toshima", the ward's website, and pamphlets created by each contractor. If you wish to see a physical copy of "Kōhō Toshima", it will be distributed at the Public Relations Division counter. | 1 4. Supplementary Materials for Item 3 | A4 landscape format *No specific format Create materials including the following content. *Also include image materials for the web version of the public relations paper. ・Target audience ・Approach to address reader questions and interests ・Who to interview, what facts/voices to include ・Desired understanding or action after reading | 4 5. Documents demonstrating experience in publishing local government public relations papers/booklets | Select one item that demonstrates design capabilities (impact, readability, etc.) and planning/composition skills from past commissioned local government public relations paper/booklet publishing projects. *If you have published a public relations paper using recycled paper, submit it as a color sample. | 1 7- 5 - (4) Proposal Preparation Method Proposals should be A4 landscape, double-sided, long-edge bound, and stapled in two places. Do not include the company name on the duplicate proposal documents. 13. Withdrawal of Proposal If you wish to withdraw your proposal after submitting the Intent to Participate Application Form, please submit the "Proposal Withdrawal Form" (Form 4) in person or by mail (registered mail if by mail). Refer to "20. Document Submission and Inquiries" for the submission location. 14. Evaluation Method (1) First Stage Review ① A document review will be conducted based on the submitted Intent to Participate Application Form and proposal documents. Evaluation will be performed based on the evaluation criteria, and up to approximately 3 candidates will be selected for the second stage review. ② The results of the first stage review (pass/fail) will be notified via email by December 25, Reiwa 8 (Friday). (2) Second Stage Review An interview will be conducted with the candidates selected in the first stage review to evaluate their proposals and submitted documents. *In case of a tie in scores, the selection committee chairperson will make the final decision. ① Date and Time: January 13, Reiwa 9 (Wednesday), 1:00 PM - 4:00 PM (tentative) ② Presentation Details: ・Presentation and Q&A time will be approximately 30 minutes (15 minutes for presentation, 15 minutes for Q&A). ・Presentations should use the proposal documents (written) and attached materials (written or screen projection). ・The City will provide the projector, connection cables, and screen. ・Proposers must bring their own computers for projector connection. ・The presentation team should consist of no more than 3 people (including the computer operator), and the person in charge of this work must attend. (3) Determination of Selected Contractor ① The selection committee will comprehensively review the evaluation of the proposal content and determine the contractor from among those who meet the minimum standards, based on the highest overall score in the second stage review. ② The selection results will be notified individually to each proposer via email by January 22, Reiwa 9 (Friday). Inquiries regarding the evaluation content and selection results will not be answered. - 6 - 15. Evaluation Criteria Major Category | Sub-Category | Basic Concept | | | - Understanding of the work | | | - Information dissemination concept Planning & Editing | - Planning and proposal capabilities | - Disseminating the appeal of the ward from the perspective of citizens | | - Uniqueness and creativity | | - Written expression skills | | - Appeal to the target audience Design, Page Layout, Web Development | - Design capabilities | - Layout capabilities | | - Visual appeal | | - Integration with web media | | - Design and information accessibility Execution Capability | - Interviewing and information gathering capabilities | - Quality control | | - Work execution system | | - Expertise and track record | | - Collaboration and consultation system with the ward | | - Schedule and progress management Cost | - Reasonableness of estimated amount | - Clarity and appropriateness of cost breakdown 16. Handling of Information Disclosure Information disclosure will be handled in accordance with the City's Information Disclosure Standards. For details, please refer to the following link: https://www.city.toshima.lg.jp/012/privacy.html 17. Handling of Materials Provided by the City Materials provided by the City are prohibited from being used for any purpose other than the examination related to the application. Furthermore, even within the scope of the aforementioned examination, it is prohibited to allow third parties to use or present the content without the City's permission. 18. Contract Conclusion, etc. (1) The contract for this work will be concluded with the selected contractor. (2) The contract conclusion is scheduled for late January, Reiwa 9. (3) If the selected contractor withdraws or if it is impossible to conclude the contract with the selected contractor for special reasons, contract negotiations will be conducted in order with the contractors ranked according to "14. Evaluation Method (3) Determination of Selected Contractor". Note that withdrawal from the contract will not result in disadvantageous treatment in subsequent selections or competitive bidding. - 7 - 19. Precautions (1) The wording in the proposal should be as clear and simple as possible. (2) If the submitted documents do not reach the City by the submission deadline, the applicant will be disqualified. (3) Proposals with an estimated price exceeding the "Proposal Limit Price" stated in Section 4 will be considered invalid. (4) If the selected contractor is found to have made false proposals or statements after selection but before contract conclusion, they will be disqualified. (5) The costs incurred in preparing and submitting the documents are the responsibility of the proposer. (6) Submitted documents will not be returned. (7) The City will not use the submitted proposal documents for any purpose other than contractor selection without the proposer's permission. (8) The submitted cover sheet and page layout drafts are for selection purposes and are not necessarily the final design to be produced upon contract award. (9) Replacement or resubmission of documents after the submission deadline is not permitted. (10) The City is not bound by the content of the selected proposal. (11) The City is not responsible for communication failures such as email. (12) The conclusion of the contract for this matter is conditional upon the approval of the budget. (13) Matters not covered in these guidelines will be determined separately by the selection committee. 20. Document Submission and Inquiries Toshima City Policy Management Department Public Relations Division Public Relations Group Contact Persons: Katayama, Okamoto, Fukino Address: 2-45-1 Minami-Ikebukuro, Toshima-ku Phone: 03-4566-2532 - 8 - Overview of "Kōhō Toshima" *This contract is only for the special edition. | | Special Edition | Information Edition |---|---|---| Role | Deeply convey themes | Broadly convey necessary information in a timely manner Purpose | Deepen understanding and interest, lead to action | Provide a wide range of necessary administrative information Features | Focus on specific themes | Broad coverage of systems, events, etc. Publication Frequency | Once a month (1st of each month) | Once a month (15th of each month) Circulation (Reiwa 8) | 65,000 copies | 65,000 copies Distribution Method | - Newspaper insert - Direct distribution - Placement in PR stands at stations within the ward - Placement in PR stands at facilities within the ward - Placement at Family Mart, post offices, public baths | - Viewing Method | - PDF version (https://www.city.toshima.lg.jp/012/kuse/koho/kohoshi/kohopdf.html) - Digital book (https://toshima.rlibrary.jp/#/home) - Web version (Special Edition only) (https://www.city.toshima.lg.jp/012/webkoho/index.html) | - Reference - 1 - Specifications Toshima City (hereinafter referred to as "Party A") Contractor (hereinafter referred to as "Party B") 1. Subject Matter Outsourcing of the publication of the Reiwa 9 "Kōhō Toshima Special Edition" 2. Performance Period April 1, Reiwa 9 - March 31, Reiwa 10 3. Performance Location Designated location by the City 4. Publication Issue and Circulation 1st of each month / 12 times per year / 65,000 copies per issue (tentative) *Party B must be flexible to changes in the number of copies. 5. Specifications ① Page Size: Tabloid / 4-color/4-color ② Page Count: 8 pages (11 issues), 4 pages (1 issue) ③ Printing Method: Offset printing / Newspaper rotary press ④ Font: Universal font ⑤ Opening: Left opening ⑥ Paper: Recycled paper with a high percentage of mixed waste paper, equivalent to the following. 2. T: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction D: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction (Comprehensive Evaluation Bidding System) Home Applications and Procedures Procurement Information Bidding Information Tender Announcements (Construction) Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction (Comprehensive Evaluation Bidding System) Tender Announcement Construction (Comprehensive Evaluation Bidding System) The following is an open competitive tender. October 20, Reiwa 8 Appointed Authorized Officer for Expenditures, Director of Shinjuku Gyoen National Garden, Nature Conservation Bureau, Ministry of the Environment, Michiharu Kono 1. Construction Overview (1) Construction Name: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction (Electronic Procurement Target Project) (2) Construction Location: 11 Naitomachi, Shinjuku-ku, Tokyo (3) Construction Details: As per attached specifications (4) Construction Period: Until March 31, Reiwa 9 (5) Construction Implementation Method: 1) This construction project will determine the successful bidder by comprehensively evaluating non-price factors and price, based on the company's technical capabilities and the capabilities of its engineers submitted at the time of bidding. This is a comprehensive evaluation bidding system (Construction Capability Evaluation Type II). 2) For this construction project, submission of documents and bidding will be conducted through the electronic procurement system. However, if it is difficult to use the electronic procurement system, paper bidding may be substituted with the consent of the contracting party. For consent to paper bidding, submit a request for consent to the department in charge in section 4 (1) below. 3) This construction project is subject to the "Act on the Recycling of Construction Materials" (Act No. 104 of 2000), which mandates the separation and recycling of construction waste and specified construction materials. 4) This construction project is subject to the low bid price investigation system. 5) This construction project allows for the assignment of an engineer to assist the chief engineer or supervising engineer on a full-time basis (hereinafter referred to as "full-time assistant") to improve the technical skills of engineers with limited field experience. (6) This construction project will provide additional points in the comprehensive evaluation for companies that implement wage increases. 2. Competition Participation Qualifications: (1) Not subject to the provisions of Articles 70 and 71 of the Budget, Settlement, and Accounting Order (hereinafter referred to as "Budget Order"). (2) Must have been certified in A, B, or C grade for civil engineering work or natural environment symbiosis work in the Reiwa 08/09 general competitive bidding qualifications of the Ministry of the Environment by the time of bid opening. For companies that have filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (Act No. 154 of 2002) or for companies that have filed for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Act No. 225 of 1999), re-certification of general competitive bidding qualifications must be obtained in accordance with procedures separately established by the Ministry of the Environment after the decision to commence proceedings. (3) Must have a head office, branch office, or business office with a license for civil engineering work under the Construction Industry Act within the Kanto region. (4) Not a company that has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act or for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (excluding those who have obtained re-certification under (2) above). (5) Must have construction experience of completing civil engineering work or natural environment symbiosis work as the prime contractor since Reiwa 23, meeting one of the following requirements. If applying as a joint venture, the construction experience of the joint venture will only be counted if the equity ratio is 20% or more. For projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. Highly similar work: Construction of new wooden bridges ordered by national or local governments with a contract amount of 5 million yen or more. More highly similar work: Among highly similar work experience, work including the removal of wooden bridges. (6) Must be able to assign a chief engineer or supervising engineer to this project who meets the following criteria: 1) Must hold a Class 1 or Class 2 Civil Engineering Construction Management Engineer, Class 1 or Class 2 Landscape Construction Management Engineer, or equivalent qualification. 2) Must have construction experience as the prime contractor in completing work meeting either of the following requirements since Reiwa 23 (experience as an engineer in a joint venture is limited to cases where the equity ratio of the member company is 20% or more). However, for experience in projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. ① Highly similar work: Construction of new wooden bridges ordered by national or local governments with a contract amount of 5 million yen or more. ② More highly similar work: Among highly similar work experience, work including the removal of wooden bridges. 3) If a full-time assistant meeting the qualifications in item 1) and the construction experience in item 2) is assigned, the assigned chief (supervising) engineer must have the construction experience in item 2) or, in lieu thereof, have the following construction experience. (Experience as an engineer in a joint venture is limited to cases where the equity ratio of the member company is 20% or more). Must have construction experience as a chief (supervising) engineer or site supervisor for civil engineering work or natural environment symbiosis work ordered by national or local governments since Reiwa 28. Furthermore, for experience in projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. 4) For supervising engineers, must possess a supervising engineer's license and a certificate of completion of supervising engineer training. (7) Must not have been subject to designation suspension measures under the Ministry of the Environment's Measures for Designation Suspension, etc., related to Public Works Contracts (Environmental Affairs Bureau Notification No. 2012255, December 25, Reiwa 2) during the period from the submission deadline of the Competition Participation Qualification Application Form (hereinafter referred to as "Application Form") and Competition Participation Qualification Confirmation Documents (hereinafter referred to as "Documents") to the bid opening. (8) Must not be the contractor for design work related to the construction specified in 1 (1) above, or a construction company related to such contractor in terms of capital or personnel. (9) There must be no capital or personnel relationship between the bidders. (10) Must not be a company whose management is substantially controlled by a member of a violent group, or equivalent, as requested by the police authorities for exclusion from public works projects ordered by the Ministry of the Environment, and such status must not be ongoing. (11) Must not be a construction company that has failed to fulfill its reporting obligations as specified below (excluding those for whom such obligations do not apply). - Obligation to report under Article 48 of the Health Insurance Act (Act No. 70 of 1922). - Obligation to report under Article 27 of the Employees' Pension Insurance Act (Act No. 115 of 1954). - Obligation to report under Article 7 of the Employment Insurance Act (Act No. 116 of 1974). 3. Matters Related to Comprehensive Evaluation: (1) The evaluation items for the comprehensive evaluation of this construction project are as follows. 1) Company's Technical Capabilities, etc. A. Company's Construction Capability (a) Experience in similar construction projects (b) Construction performance (c) Awards, etc. (d) Local familiarity (geographical conditions) (e) Local contribution (track record of activities during disasters, etc.) (f) Status of initiatives for promoting work-life balance, etc. B. Capabilities of Assigned Engineers (a) Experience and role in similar construction projects (b) Construction performance (c) Awards, etc. (d) Status of continuing education (CPD and CPDS) initiatives. C. Implementation of Wage Increases. (2) Comprehensive Evaluation Method: 1) Standard Score: A standard score of 100 points will be given if the requirements described in the bidding documents, etc., can be met for this construction project. 2) Bonus Points: Bonus points will be awarded based on the evaluation of each item listed in (1) above. 3) Evaluation Score: The comprehensive evaluation of performance, etc., presented as non-price factors will be conducted by dividing the sum of the standard points and bonus points obtained from 1) and 2) above by the bid price of the bidder, within the limit of the estimated price (hereinafter referred to as the "evaluation score"). Evaluation Score = (Standard Points + Bonus Points) / Bid Price (3) Hearing Implementation: No hearing will be conducted. (4) Method of Determining the Successful Bidder: 1) The successful bidder will be the bidder who meets the requirements of ① below and has the highest "evaluation score" calculated in (2) above. However, if it is recognized that the successful bidder may not be able to perform the contract in accordance with its terms due to their bid price, or if it is deemed significantly inappropriate to conclude the contract with them due to the risk of disrupting fair trade practices, the contracting party may select another bidder who has submitted a bid meeting all minimum requirements set by the contracting party within the limit of the estimated price, and who has the highest evaluation score. ① The bid price must be within the limit of the estimated price. 2) If there are two or more bidders with the highest evaluation score in 1), the successful bidder will be determined by drawing lots. 4. Bidding Procedures, etc.: (1) Department in Charge: Shinjuku Gyoen National Garden Management Office, General Affairs Section, 11 Naitomachi, Shinjuku-ku, Tokyo 160-0014, Phone: 03-3350-0152, Email: SHINJUKU@env.go.jp (2) Distribution Period for Bidding Documents, etc.: Bidding documents (documents, summary of quantities, drawings, application forms, etc.) will be distributed by downloading from the electronic procurement system. For details on operation and usage, please refer to the address below. If you wish to receive documents in paper format, please apply by email to the following. 1) Electronic Procurement System Address: http://www.geps.go.jp 2) Distribution Location: Same as 4 (1). 3) Distribution Period: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. 4) Paper Distribution Method: Email to the address in 2) above within the period specified in 3) above. A reply will be sent via email attachment. (No counter distribution will be provided.) (3) Method of Preparing and Submitting Application Forms and Documents: Application forms and documents must be prepared in accordance with the forms and notes indicated in the bidding documents and submitted through the electronic procurement system. However, if the data capacity of the documents exceeds 10MB, or if paper bidding is approved by the contracting party, the documents should be submitted via email, with a file capacity of 7MB or less (including compressed files). If the application form and documents unavoidably exceed 7MB, they should be sent in parts, and notification should be sent to the General Affairs Section of the Shinjuku Gyoen National Garden Management Office, Ministry of the Environment, confirming receipt of the email. 1) Submission Period via Electronic Procurement System: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. 2) Submission Period by Mail: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. (4) Date and Time and Place of Bidding and Bid Opening, and Method of Submitting Bids: Bids must be submitted through the electronic procurement system. However, paper bids may be submitted in person with the approval of the contracting party. Bids by mail or facsimile are not permitted. The deadline for submitting bids is as follows: 1) Deadline for Bids via Electronic Procurement System: Friday, November 6, Reiwa 8, 11:00 AM. 2) Deadline for Submission in Person: Friday, November 6, Reiwa 8, 11:00 AM. 3) Bid opening will be held on Friday, November 6, Reiwa 8, at 11:00 AM in the conference room of the Shinjuku Gyoen National Garden Management Office. 5. Other: (1) The language and currency used in the contract procedures shall be Japanese and Japanese currency, respectively. (2) Bid Bond and Contract Deposit: 1) Bid Bond: Exempt. 2) Contract Deposit: Payment required (handling bank: Bank of Japan, Central Branch). However, payment may be substituted with the provision of interest-bearing government bonds or a guarantee from a financial institution or guarantee company. Furthermore, the contract deposit will be waived if a public works performance bond or a performance guarantee insurance contract is provided. The amount of the contract deposit, guarantee amount, or insurance amount shall be 1/10 or more of the contract price. However, for contracts with bidders who have undergone the investigation stipulated in Article 86 of the Budget Order (low bid price investigation), the amount of contract guarantee shall be 3/10 or more of the contract price. (3) Invalid Bids: Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. (4) For contracts with bidders subject to low bid price investigation, Article 35, Paragraph 1 of the separate contract draft shall be amended from "4/10" to "2/10", and Paragraphs 5, 6, and 7 shall be applied accordingly. (5) Confirmation of Assigned Supervising Engineer, etc.: If a violation of the full-time assignment rule for the assigned supervising engineer, etc., is confirmed through CORINS or other means after the successful bidder is determined, the contract may not be concluded. Replacement of the application form is not permitted, except in unavoidable circumstances approved due to various situations. (6) For construction projects that require the assignment of a full-time chief engineer or supervising engineer, if the contract is concluded at a price below the investigation standard price, an engineer meeting equivalent requirements may be required in addition to the chief engineer or supervising engineer. (7) Requirement for Contract Document Preparation: Required. (8) Whether there is a plan to conclude a contract for other construction work directly related to this project with the contractor of this project on a discretionary basis: No. (9) Contact Point for Obtaining Related Information: Same as 4 (1) above. (10) Details are provided in the bidding documents. (11) Invalid Bids: 1) Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. 2) If a successful bidder has submitted an invalid bid, the bid award decision will be revoked. 3) Even if a person has been confirmed to have the necessary qualifications by the contracting officer, etc., if they do not possess the qualifications listed in 2) at the time of bid opening, they will be considered to lack the necessary qualifications. 4) Bids will be deemed invalid if the construction cost breakdown is not submitted, or if the submitted construction cost breakdown is incomplete (e.g., blank). (12) Participation by those who have not obtained general competitive bidding qualification certification: Those who have not obtained the general competitive bidding qualification certification listed in 2) (2) above must obtain such certification and undergo qualification confirmation before the deadline for submitting bids. Above Bidding Documents (Set) [PDF 737KB] Special Specifications [PDF 384KB] Drawings (Set) [PDF 737KB] (Form for Entry) Competition Participation Qualification Application Form [Word 174KB] (Form for Entry) Bidding Instructions Form [Word 68KB] 3. T: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction D: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction Procurement Item Number: 0000000000000628589 Procurement Type: Open Competitive Bidding Announcement (Excluding WTO) Classification: Simple Construction Procurement Item Name: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction Publication Start Date: October 20, Reiwa 8 Publication End Date: November 6, Reiwa 8 Procurement Organization: Ministry of the Environment Procurement Organization Location: Tokyo Announcement Content: Tender Announcement Construction (Comprehensive Evaluation Bidding System) The following is an open competitive tender. October 20, Reiwa 8 Appointed Authorized Officer for Expenditures, Director of Shinjuku Gyoen National Garden, Nature Conservation Bureau, Ministry of the Environment, Michiharu Kono 1. Construction Overview (1) Construction Name: Reiwa 8 Shinjuku Gyoen Mother and Child Forest Wooden Bridge Longevity Improvement Construction (Electronic Procurement Target Project) (2) Construction Location: 11 Naitomachi, Shinjuku-ku, Tokyo (3) Construction Details: As per attached specifications (4) Construction Period: Until March 31, Reiwa 9 (5) Construction Implementation Method: 1) This construction project will determine the successful bidder by comprehensively evaluating non-price factors and price, based on the company's technical capabilities and the capabilities of its engineers submitted at the time of bidding. This is a comprehensive evaluation bidding system (Construction Capability Evaluation Type II). 2) For this construction project, submission of documents and bidding will be conducted through the electronic procurement system. However, if it is difficult to use the electronic procurement system, paper bidding may be substituted with the consent of the contracting party. For consent to paper bidding, submit a request for consent to the department in charge in section 4 (1) below. 3) This construction project is subject to the "Act on the Recycling of Construction Materials" (Act No. 104 of 2000), which mandates the separation and recycling of construction waste and specified construction materials. 4) This construction project is subject to the low bid price investigation system. 5) This construction project allows for the assignment of an engineer to assist the chief engineer or supervising engineer on a full-time basis (hereinafter referred to as "full-time assistant") to improve the technical skills of engineers with limited field experience. (6) This construction project will provide additional points in the comprehensive evaluation for companies that implement wage increases. 2. Competition Participation Qualifications: (1) Not subject to the provisions of Articles 70 and 71 of the Budget, Settlement, and Accounting Order (hereinafter referred to as "Budget Order"). (2) Must have been certified in A, B, or C grade for civil engineering work or natural environment symbiosis work in the Reiwa 08/09 general competitive bidding qualifications of the Ministry of the Environment by the time of bid opening. For companies that have filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (Act No. 154 of 2002) or for companies that have filed for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Act No. 225 of 1999), re-certification of general competitive bidding qualifications must be obtained in accordance with procedures separately established by the Ministry of the Environment after the decision to commence proceedings. (3) Must have a head office, branch office, or business office with a license for civil engineering work under the Construction Industry Act within the Kanto region. (4) Not a company that has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act or for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (excluding those who have obtained re-certification under (2) above). (5) Must have construction experience of completing civil engineering work or natural environment symbiosis work as the prime contractor since Reiwa 23, meeting one of the following requirements. If applying as a joint venture, the construction experience of the joint venture will only be counted if the equity ratio is 20% or more. For projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. Highly similar work: Construction of new wooden bridges ordered by national or local governments with a contract amount of 5 million yen or more. More highly similar work: Among highly similar work experience, work including the removal of wooden bridges. (6) Must be able to assign a chief engineer or supervising engineer to this project who meets the following criteria: 1) Must hold a Class 1 or Class 2 Civil Engineering Construction Management Engineer, Class 1 or Class 2 Landscape Construction Management Engineer, or equivalent qualification. 2) Must have construction experience as the prime contractor in completing work meeting either of the following requirements since Reiwa 23 (experience as an engineer in a joint venture is limited to cases where the equity ratio of the member company is 20% or more). However, for experience in projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. ① Highly similar work: Construction of new wooden bridges ordered by national or local governments with a contract amount of 5 million yen or more. ② More highly similar work: Among highly similar work experience, work including the removal of wooden bridges. 3) If a full-time assistant meeting the qualifications in item 1) and the construction experience in item 2) is assigned, the assigned chief (supervising) engineer must have the construction experience in item 2) or, in lieu thereof, have the following construction experience. (Experience as an engineer in a joint venture is limited to cases where the equity ratio of the member company is 20% or more). Must have construction experience as a chief (supervising) engineer or site supervisor for civil engineering work or natural environment symbiosis work ordered by national or local governments since Reiwa 28. Furthermore, for experience in projects ordered by the Ministry of the Environment, projects with a total evaluation score of less than 65 points will be excluded. 4) For supervising engineers, must possess a supervising engineer's license and a certificate of completion of supervising engineer training. (7) Must not have been subject to designation suspension measures under the Ministry of the Environment's Measures for Designation Suspension, etc., related to Public Works Contracts (Environmental Affairs Bureau Notification No. 2012255, December 25, Reiwa 2) during the period from the submission deadline of the Competition Participation Qualification Application Form (hereinafter referred to as "Application Form") and Competition Participation Qualification Confirmation Documents (hereinafter referred to as "Documents") to the bid opening. (8) Must not be the contractor for design work related to the construction specified in 1 (1) above, or a construction company related to such contractor in terms of capital or personnel. (9) There must be no capital or personnel relationship between the bidders. (10) Must not be a company whose management is substantially controlled by a member of a violent group, or equivalent, as requested by the police authorities for exclusion from public works projects ordered by the Ministry of the Environment, and such status must not be ongoing. (11) Must not be a construction company that has failed to fulfill its reporting obligations as specified below (excluding those for whom such obligations do not apply). - Obligation to report under Article 48 of the Health Insurance Act (Act No. 70 of 1922). - Obligation to report under Article 27 of the Employees' Pension Insurance Act (Act No. 115 of 1954). - Obligation to report under Article 7 of the Employment Insurance Act (Act No. 116 of 1974). 3. Matters Related to Comprehensive Evaluation: (1) The evaluation items for the comprehensive evaluation of this construction project are as follows. 1) Company's Technical Capabilities, etc. A. Company's Construction Capability (a) Experience in similar construction projects (b) Construction performance (c) Awards, etc. (d) Local familiarity (geographical conditions) (e) Local contribution (track record of activities during disasters, etc.) (f) Status of initiatives for promoting work-life balance, etc. B. Capabilities of Assigned Engineers (a) Experience and role in similar construction projects (b) Construction performance (c) Awards, etc. (d) Status of continuing education (CPD and CPDS) initiatives. C. Implementation of Wage Increases. (2) Comprehensive Evaluation Method: 1) Standard Score: A standard score of 100 points will be given if the requirements described in the bidding documents, etc., can be met for this construction project. 2) Bonus Points: Bonus points will be awarded based on the evaluation of each item listed in (1) above. 3) Evaluation Score: The comprehensive evaluation of performance, etc., presented as non-price factors will be conducted by dividing the sum of the standard points and bonus points obtained from 1) and 2) above by the bid price of the bidder, within the limit of the estimated price (hereinafter referred to as the "evaluation score"). Evaluation Score = (Standard Points + Bonus Points) / Bid Price (3) Hearing Implementation: No hearing will be conducted. (4) Method of Determining the Successful Bidder: 1) The successful bidder will be the bidder who meets the requirements of ① below and has the highest "evaluation score" calculated in (2) above. However, if it is recognized that the successful bidder may not be able to perform the contract in accordance with its terms due to their bid price, or if it is deemed significantly inappropriate to conclude the contract with them due to the risk of disrupting fair trade practices, the contracting party may select another bidder who has submitted a bid meeting all minimum requirements set by the contracting party within the limit of the estimated price, and who has the highest evaluation score. ① The bid price must be within the limit of the estimated price. 2) If there are two or more bidders with the highest evaluation score in 1), the successful bidder will be determined by drawing lots. 4. Bidding Procedures, etc.: (1) Department in Charge: Shinjuku Gyoen National Garden Management Office, General Affairs Section, 11 Naitomachi, Shinjuku-ku, Tokyo 160-0014, Phone: 03-3350-0152, Email: SHINJUKU@env.go.jp (2) Distribution Period for Bidding Documents, etc.: Bidding documents (documents, summary of quantities, drawings, application forms, etc.) will be distributed by downloading from the electronic procurement system. For details on operation and usage, please refer to the address below. If you wish to receive documents in paper format, please apply by email to the following. 1) Electronic Procurement System Address: http://www.geps.go.jp 2) Distribution Location: Same as 4 (1). 3) Distribution Period: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. 4) Paper Distribution Method: Email to the address in 2) above within the period specified in 3) above. A reply will be sent via email attachment. (No counter distribution will be provided.) (3) Method of Preparing and Submitting Application Forms and Documents: Application forms and documents must be prepared in accordance with the forms and notes indicated in the bidding documents and submitted through the electronic procurement system. However, if the data capacity of the documents exceeds 10MB, or if paper bidding is approved by the contracting party, the documents should be submitted via email, with a file capacity of 7MB or less (including compressed files). If the application form and documents unavoidably exceed 7MB, they should be sent in parts, and notification should be sent to the General Affairs Section of the Shinjuku Gyoen National Garden Management Office, Ministry of the Environment, confirming receipt of the email. 1) Submission Period via Electronic Procurement System: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. 2) Submission Period by Mail: Tuesday, October 20, Reiwa 8 to Friday, October 30, Reiwa 8, until 12:00 PM. (4) Date and Time and Place of Bidding and Bid Opening, and Method of Submitting Bids: Bids must be submitted through the electronic procurement system. However, paper bids may be submitted in person with the approval of the contracting party. Bids by mail or facsimile are not permitted. The deadline for submitting bids is as follows: 1) Deadline for Bids via Electronic Procurement System: Friday, November 6, Reiwa 8, 11:00 AM. 2) Deadline for Submission in Person: Friday, November 6, Reiwa 8, 11:00 AM. 3) Bid opening will be held on Friday, November 6, Reiwa 8, at 11:00 AM in the conference room of the Shinjuku Gyoen National Garden Management Office. 5. Other: (1) The language and currency used in the contract procedures shall be Japanese and Japanese currency, respectively. (2) Bid Bond and Contract Deposit: 1) Bid Bond: Exempt. 2) Contract Deposit: Payment required (handling bank: Bank of Japan, Central Branch). However, payment may be substituted with the provision of interest-bearing government bonds or a guarantee from a financial institution or guarantee company. Furthermore, the contract deposit will be waived if a public works performance bond or a performance guarantee insurance contract is provided. The amount of the contract deposit, guarantee amount, or insurance amount shall be 1/10 or more of the contract price. However, for contracts with bidders who have undergone the investigation stipulated in Article 86 of the Budget Order (low bid price investigation), the amount of contract guarantee shall be 3/10 or more of the contract price. (3) Invalid Bids: Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. (4) For contracts with bidders subject to low bid price investigation, Article 35, Paragraph 1 of the separate contract draft shall be amended from "4/10" to "2/10", and Paragraphs 5, 6, and 7 shall be applied accordingly. (5) Confirmation of Assigned Supervising Engineer, etc.: If a violation of the full-time assignment rule for the assigned supervising engineer, etc., is confirmed through CORINS or other means after the successful bidder is determined, the contract may not be concluded. Replacement of the application form is not permitted, except in unavoidable circumstances approved due to various situations. (6) For construction projects that require the assignment of a full-time chief engineer or supervising engineer, if the contract is concluded at a price below the investigation standard price, an engineer meeting equivalent requirements may be required in addition to the chief engineer or supervising engineer. (7) Requirement for Contract Document Preparation: Required. (8) Whether there is a plan to conclude a contract for other construction work directly related to this project with the contractor of this project on a discretionary basis: No. (9) Contact Point for Obtaining Related Information: Same as 4 (1) above. (10) Details are provided in the bidding documents. (11) Invalid Bids: 1) Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. 2) If a successful bidder has submitted an invalid bid, the bid award decision will be revoked. 3) Even if a person has been confirmed to have the necessary qualifications by the contracting officer, etc., if they do not possess the qualifications listed in 2) at the time of bid opening, they will be considered to lack the necessary qualifications. 4) Bids will be deemed invalid if the construction cost breakdown is not submitted, or if the submitted construction cost breakdown is incomplete (e.g., blank). (12) Participation by those who have not obtained general competitive bidding qualification certification: Those who have not obtained the general competitive bidding qualification certification listed in 2) (2) above must obtain such certification and undergo qualification confirmation before the deadline for submitting bids. Above Procurement Documents 1 Procurement Documents 1 Download URL Procurement Documents 2- Procurement Documents 3- Procurement Documents 4- Procurement Documents 5- 4. T: [Tokyo Regional Civil Aviation Bureau] Tokyo International Airport Apron Surveillance ITV Equipment Terminal 2 Area Fiber Optic Cable Switching and Other Work (Re-announcement) D: [Tokyo Regional Civil Aviation Bureau] Tokyo International Airport Apron Surveillance ITV Equipment Terminal 2 Area Fiber Optic Cable Switching and Other Work (Re-announcement) Procurement Item Number: 0000000000000628462 Procurement Type: Open Competitive Bidding Announcement (Excluding WTO) Classification: Simple Construction Procurement Item Name: [Tokyo Regional Civil Aviation Bureau] Tokyo International Airport Apron Surveillance ITV Equipment Terminal 2 Area Fiber Optic Cable Switching and Other Work (Re-announcement) Publication Start Date: October 20, Reiwa 8 Publication End Date: November 18, Reiwa 8 Procurement Organization: Ministry of Land, Infrastructure, Transport and Tourism Procurement Organization Location: Tokyo Announcement Content: To be posted at https://www.cab.mlit.go.jp/tcab/contract/announcements/notices/notices-tcab.html. Procurement Documents 1 Procurement Documents 1 Download URL Procurement Documents 2- Procurement Documents 3- Procurement Documents 4- Procurement Documents 5- 5. T: [Tokyo Metropolitan Police Department Information and Communications Division] Air Conditioning Equipment Renewal Work D: [Tokyo Metropolitan Police Department Information and Communications Division] Air Conditioning Equipment Renewal Work Procurement Item Number: 0000000000000628559 Procurement Type: Open Competitive Bidding Announcement (Excluding WTO) Classification: Simple Construction Procurement Item Name: [Tokyo Metropolitan Police Department Information and Communications Division] Air Conditioning Equipment Renewal Work Publication Start Date: October 20, Reiwa 8 Publication End Date: November 2, Reiwa 8 Procurement Organization: National Public Safety Commission (National Police Agency) Procurement Organization Location: Tokyo Announcement Content: As attached Procurement Documents 1 Procurement Documents 1 Download URL Procurement Documents 2- Procurement Documents 3- Procurement Documents 4- Procurement Documents 5- 6. T: Tokyo University of Marine Science and Technology (Ecchu-jima) Building No. 2 Automatic Fire Alarm System Renovation Work D: Tokyo University of Marine Science and Technology (Ecchu-jima) Building No. 2 Automatic Fire Alarm System Renovation Work 1. Tender Announcement (Construction) (Re-announcement) The following is an open competitive tender. This tender is a re-announcement of the "Tokyo University of Marine Science and Technology (Ecchu-jima) Building No. 2 Automatic Fire Alarm System Renovation Work" which was announced on January 16, Reiwa 8 and re-announced on March 27, Reiwa 8. Those who did not participate in the previous and previous re-announcements can participate in this tender. October 20, Reiwa 8 Contract Administrator, Executive Director, Tokyo University of Marine Science and Technology, Ryoyoshi Murakami 1. Construction Overview (1) Construction Name: Tokyo University of Marine Science and Technology (Ecchu-jima) Building No. 2 Automatic Fire Alarm System Renovation Work (2) Construction Location: 2-1-6 Ecchu-jima, Koto-ku, Tokyo (within Tokyo University of Marine Science and Technology Ecchu-jima Campus) (3) Construction Details: Work to renovate the automatic fire alarm system in Building No. 2 of the Ecchu-jima Campus. (4) Construction Period: From the day after the contract is concluded until May 31, Reiwa 9 (Monday). (5) This construction project will be conducted using the electronic bidding system for the submission of the Competition Participation Qualification Application Form (hereinafter referred to as "Application Form") and Competition Participation Qualification Confirmation Documents (hereinafter referred to as "Documents"), as well as for bidding, etc. However, those for whom the electronic bidding system is difficult may substitute paper bidding with the approval of the contracting party. (6) This construction project is a "Promoting Weekly Two-Day Weekend Work" (Complete Two-Day Weekend (Saturday/Sunday) Type II) where the contractor will implement the work after consulting with the contracting party regarding the commitment to "Complete Two-Day Weekend (Saturday/Sunday)" or "Monthly Two-Day Weekend" before commencing work. The contractor shall work towards a full two-day weekend regardless of consultation. 2. Competition Participation Qualifications: (1) Not subject to the provisions of Article 6 of the "Tokyo University of Marine Science and Technology Contract Administration Regulations". (2) Must have been certified in grade A, B, or C for electrical work in the Reiwa 7/8 fiscal year, as classified in Article 4, Chapter 1 of the "Qualifications for General Competitive Bidders" (Decision by the Minister of Education, Culture, Sports, Science and Technology on January 6, 2001) by the Ministry of Education, Culture, Sports, Science and Technology. (For companies that have filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act (Act No. 154 of 2002) or for companies that have filed for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (Act No. 225 of 1999), re-certification of general competitive bidding qualifications must be obtained after the decision to commence proceedings.) (3) Not a company that has filed for commencement of rehabilitation proceedings under the Corporate Reorganization Act or for commencement of rehabilitation proceedings under the Civil Rehabilitation Act (excluding those who have obtained re-certification under (2) above). (4) Must have experience in constructing new or renovation work of automatic fire alarm systems in buildings of 2,900 square meters or more, completed and delivered as the prime contractor since Reiwa 23. (Experience as a member of a joint venture is limited to cases where the equity ratio is 20% or more.) (5) Must be able to assign a chief engineer or supervising engineer to this project who meets the following criteria. (The assigned engineer for this project does not require full-time commitment.) ① Must hold a Class 2 Electrical Construction Management Engineer qualification or equivalent. "Equivalent qualification" refers to the following: - Holders of Class 1 Electrical Construction Management Engineer qualification. ② For supervising engineers, must possess a supervising engineer's license and a certificate of completion of supervising engineer training. ③ The assigned chief engineer or supervising engineer must have a direct and continuous employment relationship, and documentation to prove this may be requested. Failure to provide such documentation may result in disqualification from bidding. ④ For this project, refer to the bidding documents regarding the requirements for assigning a chief engineer or supervising engineer who is subject to the provisions of Article 26-5, Paragraph 1 of the Construction Industry Act (meaning a business site engineer or a specific business site engineer). (6) Must not have been subject to designation suspension measures under the "Measures Regarding Designation Suspension, etc., for Contracts for Construction Work" (Notice from the Director of the Planning Division for Educational Facilities, dated January 20, Reiwa 17, No. 17 Mombu-kankatsu No. 345) by the Ministry of Education, Culture, Sports, Science and Technology during the period from the submission deadline of the Application Form and Documents to the bid opening. (7) There must be no capital or personnel relationship between the bidders (excluding cases where all parties with capital or personnel relationships are members other than the representative of a regular construction joint venture (refer to bidding documents)). (8) Must have a head office, branch office, or business office licensed under the Construction Industry Act in Tokyo, Saitama, Chiba, Kanagawa, or Yamanashi Prefecture. (9) Must not be a construction company whose management is substantially controlled by a member of a violent group, or equivalent, as requested by the police authorities for exclusion from public works projects ordered by the Ministry of Education, Culture, Sports, Science and Technology, and such status must not be ongoing (refer to bidding documents). (10) Must have undergone a business performance evaluation as stipulated in Article 18-2 of the Enforcement Regulations of the Construction Industry Act. 3. Bidding Procedures, etc.: (1) Department in Charge: Facilities Division, Finance Department, Tokyo University of Marine Science and Technology, 4-5-7 Konan, Minato-ku, Tokyo 108-8477, Asset Management Section, Phone: 03-5463-0383, Email: si-kanri@o.kaiyodai.ac.jp (2) Period, Location, and Method of Bidding Document Distribution: Period: From 10:00 AM on Tuesday, October 20, Reiwa 8 to 5:00 PM on Monday, November 2, Reiwa 8. Method of Distribution: Distributed on the Tokyo University of Marine Science and Technology website ("About Tokyo University of Marine Science and Technology" -> "Information Disclosure" -> "Information on Tenders, Public Announcements, and Planning Competitions" -> "Construction Tender Information" https://www.kaiyodai.ac.jp/overview/docs/post-19.html). Distribution of bidding documents, drawings, etc., is free of charge. (3) Period, Location, and Method of Submission of Application Forms and Documents: Submission Period: From 9:00 AM to 5:00 PM daily from Tuesday, October 20, Reiwa 8 to Monday, November 2, Reiwa 8, excluding Sundays, Saturdays, and national holidays (However, on the first day, Tuesday, October 20, Reiwa 8, it will be from 10:00 AM). Submission Method: Submit via the electronic bidding system. However, with the approval of the contracting party, documents may be submitted in person or by mail (only registered mail or equivalent with delivery record) to the address in (1) above (must arrive within the submission period). (4) Date, Time, and Place of Bidding and Bid Opening, and Method of Submitting Bids and Construction Cost Breakdown: Submission Period: From 9:00 AM to 3:00 PM on Thursday, November 19, Reiwa 8. Submission Method: Submit via the electronic bidding system. However, with the approval of the contracting party, documents may be submitted in person to the address in (1) above (submission by mail is not permitted). Bid Opening Date and Time: 10:00 AM on Friday, November 20, Reiwa 8. Bid Opening Location: Tokyo University of Marine Science and Technology Headquarters Building, 1st Floor, Finance Department (Electronic Bidding System), 4-5-7 Konan, Minato-ku, Tokyo 108-8477. 4. Other: (1) Language and Currency Used in Procedures: Limited to Japanese and Japanese currency. (2) Bid Bond and Contract Deposit: ① Bid Bond: Exempt. ② Contract Deposit: Required. However, payment may be substituted with a guarantee from a bank, a financial institution deemed reliable by the contracting administrator, or a guarantee company. Furthermore, the contract deposit will be waived if a public works performance bond or a performance guarantee insurance contract is provided. The amount of the contract deposit, guarantee amount, or insurance amount shall be 10/100 or more of the contract price. (3) Invalid Bids: Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, bids with false statements in the application form or documents, and bids that violate the bidding conditions are invalid. (4) Method of Determining the Successful Bidder: The successful bidder will be the one who submits the lowest valid bid within the limit of the estimated price, in accordance with Article 43 of the "Tokyo University of Marine Science and Technology Accounting Regulations". However, if it is recognized that the successful bidder may not be able to perform the contract in accordance with its terms due to their bid price, or if it is deemed significantly inappropriate to conclude the contract with them due to the risk of disrupting fair trade practices, the bidder who submits the lowest valid bid within the limit of the estimated price may be selected as the successful bidder. (5) Confirmation of Assigned Supervising Engineer, etc.: If a violation of the full-time assignment rule for the assigned supervising engineer, etc., is confirmed through CORINS or other means after the successful bidder is determined, the contract may not be concluded. Replacement of the application form is not permitted, except in unavoidable circumstances approved due to illness, death, resignation, etc. If the assigned engineer needs to be changed due to illness or other special reasons, an engineer meeting the criteria in 2 (5) above and having equivalent or higher qualifications than the originally assigned engineer must be assigned. (6) Requirement for Contract Document Preparation: Required. (7) Contact Point for Obtaining Related Information: Same as 3 (1) above. (8) Participation by those who have not obtained general competitive bidding qualification certification: Those who have not obtained the general competitive bidding qualification certification listed in 2 (2) above may also submit the application form and documents according to 3 (3), but must obtain such certification and undergo qualification confirmation by the time of bid opening to participate in the competition. (9) Negotiation during Procedures: None. (10) Whether there is a plan to conclude a contract for other construction work directly related to this project with the contractor of this project on a discretionary basis: No. (11) Details are provided in the bidding documents. 7. T: Main Research Building Air Conditioning Outdoor Equipment Renewal Work D: Main Research Building Air Conditioning Outdoor Equipment Renewal Work Tender Announcement The following is an open competitive tender. October 20, Reiwa 8 Kazuyuki Nakagomi, Director General, National Center of Neurology and Psychiatry, National Research and Development Agency 1. Matters for Competition (1) Contract Name and Estimated Quantity: Main Research Building Air Conditioning Outdoor Equipment Renewal Work (2) Specifications of Contract Name, etc.: Refer to bidding documents and specifications. (3) Performance Deadline: March 19, Reiwa 9 (4) Performance Location: National Center of Neurology and Psychiatry, National Research and Development Agency (5) Bidding Method: The contract will be awarded to the bidder with the lowest price. The bid amount shall be the amount written on the bid form plus 10% of that amount (if there are fractions of less than 1 yen, they shall be rounded down, except for unit price contracts). Therefore, bidders shall write the amount equivalent to 100/110 of their estimated amount on the bid form, regardless of whether they are taxable or non-taxable businesses for consumption tax. 2. Qualifications Required for Competition Participants, etc.: (1) Not subject to the provisions of Articles 6 and 7 of the "National Center of Neurology and Psychiatry Contract Administration Regulations". Minors, persons under guardianship, or persons under assistance who have obtained the necessary consent for contract conclusion are considered to fall under the special circumstances in Article 6. (2) The following persons may not be allowed to participate in the competition: (a) Persons who have made false statements in their qualification examination application or attached documents. (b) Persons whose management status or commercial transaction credit has extremely deteriorated. (3) Must not have been subject to designation suspension for business or other reasons within the past year from the Ministry of Health, Labour and Welfare or an organization under its jurisdiction. (4) Must be ranked in grade B, C, or D in "Specialized Construction" in the unified qualifications for all government ministries and agencies for the current fiscal year, and have the qualification to participate in competitive bidding in the Kanto-Koshinetsu region. (5) Must be enrolled in social insurance, etc. (including Employees' Pension Insurance, Health Insurance (managed by the Japan Health Insurance Association), Seamen's Insurance, National Pension Insurance, Workers' Accident Compensation Insurance, and Employment Insurance) and have no arrears in insurance premium payments for the relevant system. 3. Location for Tender and Contract Conditions, etc.: (1) The place for submitting bid forms, the place for showing contract conditions, the place for distributing bidding documents, and the contact point are as follows: 187-8551 4-1-1 Ogawa-higashi-cho, Kodaira-shi, Tokyo National Center of Neurology and Psychiatry, National Research and Development Agency, Finance and Accounting Department, Finance and Accounting Division, First Contract Section, Ishihara TEL 042-341-2712 (Ext. 2197) Mail: a.ishihara@ncnp.go.jp (2) Bidding Document Distribution Period: October 20, Reiwa 8 (Tuesday) - November 4, Reiwa 8 (Wednesday), 9:00 AM - 12:00 PM, 1:00 PM - 5:00 PM. Excluding Saturdays, Sundays, and national holidays. (3) Bidding Document Distribution Method: Request via email to the email address in (1). Electronic media will be delivered via email. (4) Bid Submission Deadline: November 5, Reiwa 8 (Thursday), 1:30 PM. (5) Bid Opening Date and Time and Location: November 5, Reiwa 8 (Thursday), 2:00 PM, First Conference Room, 2nd Floor, Central Building, National Center of Neurology and Psychiatry, National Research and Development Agency. 4. Other Necessary Matters: (1) Language and Currency Used in Contract Procedures: Japanese and Japanese currency. (2) Bid Bond and Contract Deposit: Exempt. (3) Invalid Bids: Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, and bids from persons who have not fulfilled the obligations required of bidders, are invalid. (4) Requirement for Contract Document Preparation: Required. (5) Method of Determining the Contract Recipient: The contract recipient will be the bidder who, after being judged by the Director General of the National Center of Neurology and Psychiatry, National Research and Development Agency, can perform the work specified in this announcement and the bidding documents, and who submits the lowest valid bid within the limit of the estimated price based on the specifications related to the contract conditions. Once the contract recipient is determined, negotiations will be conducted immediately to determine the contract price. (6) Other: Details are provided in the bidding documents. 8. T: Traffic Safety and Environment Research Institute Building No. 2 Engine Test Building Cubicle Renewal and Other Work D: Traffic Safety and Environment Research Institute Building No. 2 Engine Test Building Cubicle Renewal and Other Work Tender Announcement The following is an open competitive tender. October 20, Reiwa 8 Atsushi Matsuda, Director, Traffic Safety and Environment Research Institute, Japan Automobile Technology Association 1. Matters for Competition (1) Tender Name and Quantity: Traffic Safety and Environment Research Institute Building No. 2 Engine Test Building Cubicle Renewal and Other Work, One Lot (2) Overview: This work involves the integrated renewal of the cubicles (J7), dynamometer cubicle (J8), and No. 2 cubicle (J8') in Building No. 2 of the Engine Test Building, which have been in use for over 30 years and are aging. Additionally, the cubicles (J5) in Building No. 1 Engine Test Building and (J6) in the Vibration Strength Test Building, which have also been in use for over 30 years and are aging, will be removed after temporary power supply from the renewed cubicles. This work will contribute to the stable supply of power, prevention of electric shock, electrical safety, and environmental protection for the Engine Test Building, Building No. 1 Engine Test Building, and Vibration Strength Test Building. (1) Renewal of Building No. 2 Engine Test Building Cubicle: One Lot (2) Temporary Supply Distribution Board for Vibration Strength Test Building: One Lot (3) High Voltage Cable Work (for Building No. 2 Engine Test Building Q, including conduits, etc.): One Lot (4) Low Voltage Cable Work (Building No. 1 & 2 Engine Test Buildings, Vibration Strength Test Building): One Lot (5) Removal of Cubicles (J5, J6, J7, J8, J8'): One Lot (6) Other Work: One Lot (3) Performance Deadline: March 24, Reiwa 9 (Wednesday) (4) Performance Location: 7-42-27 Jindaiji-higashi-cho, Chofu-shi, Tokyo, Traffic Safety and Environment Research Institute, Japan Automobile Technology Association 2. Competition Participation Qualifications: (1) Not subject to the provisions of Article 25 of the "Japan Automobile Technology Association Contract Administration Regulations". (2) Must possess qualifications for "Construction Work (Electrical Equipment)" in the Reiwa 7/8 fiscal year for general competitive (designate competitive) bidding related to construction work, surveying, etc., from organizations under the jurisdiction of the Ministry of Land, Infrastructure, Transport and Tourism. (3) Must not be currently subject to designation suspension by a government agency. (4) Must not be a company whose management is substantially controlled by a member of a violent group, or equivalent, as requested by the police authorities for exclusion from public works projects ordered by the Ministry of Land, Infrastructure, Transport and Tourism, and such status must not be ongoing. (5) Must have received the bidding documents. 3. Bidding Location, etc.: (1) Place for Showing Contract Conditions and Distributing Bidding Documents: 7-42-27 Jindaiji-higashi-cho, Chofu-shi, Tokyo 182-0012, Traffic Safety and Environment Research Institute, Japan Automobile Technology Association, General Affairs Department, Accounting Division, Second Contract Section, TEL 0422-41-3206, e-mail: keiyaku@ntsel.go.jp (2) Bidding Document Distribution Period: October 20, Reiwa 8 (Tuesday) - November 4, Reiwa 8 (Wednesday), until 5:00 PM. (3) Date and Time and Place of Bidding and Bid Opening: November 5, Reiwa 8 (Thursday), 2:00 PM, 1st Conference Room, Traffic Safety and Environment Research Institute, Japan Automobile Technology Association, 7-42-27 Jindaiji-higashi-cho, Chofu-shi, Tokyo. *Please submit a copy of your "Qualification Decision Notice", etc. 4. Other: (1) Language and Currency Used in Bidding and Bidding Procedures: Limited to Japanese and Japanese currency. (2) Bid Bond and Contract Deposit: Exempt. (3) Invalid Bids: Bids submitted by persons who do not meet the competition participation qualifications stated in this announcement, and bids that violate the bidding conditions. (4) Requirement for Contract Document Preparation: Required (The language and currency used in the contract document and related documents shall be Japanese and Japanese currency). However, depending on the contract amount, contract document preparation may not be required. (5) Method of Determining the Successful Bidder: The successful bidder will be the one who submits the lowest valid bid within the limit of the estimated price, in accordance with Article 4 of the "Japan Automobile Technology Association Contract Administration Regulations". However, if it is recognized that the successful bidder may not be able to perform the contract in accordance with its terms due to their bid price, or if it is deemed significantly inappropriate to conclude the contract with them due to the risk of disrupting fair trade practices, the bidder who submits the lowest valid bid within the limit of the estimated price may be selected as the successful bidder. When determining the successful bid price, it will be the amount written on the bid form plus 10% of that amount (if there are fractions of less than 1 yen, they shall be rounded down). Therefore, bidders shall write the amount equivalent to 100/110 of their estimated contract amount on the bid form, regardless of whether they are taxable or non-taxable businesses for consumption tax. (6) Public Disclosure of Information Related to Independent Administrative Agency Contracts: Regarding contracts entered into by independent administrative agencies, as stated in the "Basic Policy for Review of Operations and Businesses of Independent Administrative Agencies" (Decision of the Council of Ministers, December 7, 2010), efforts are being made to disclose information such as re-employment status and transaction status with corporations having a certain relationship with the independent administrative agency when contracting with such corporations. Based on this, information related to the relationship with this agency will be disclosed on the agency's website as follows. Therefore, please understand and cooperate by providing the necessary information to us and agreeing to the disclosure of information when responding to bids, applying, or concluding contracts. Please note that by responding to bids, applying, or concluding contracts, you are deemed to have agreed. I. Contractors Subject to Disclosure: Contractors who meet both of the following criteria: ① Those who have been executives (former executives) or have held positions equivalent to or higher than section chief (former section chiefs and above) and are re-employed as executives, advisors, etc. ② Transactions with this agency account for one-third or more of their total sales or business revenue. II. Information to be Disclosed: For contractors meeting the above criteria, the following information will be disclosed for each contract, along with the name and quantity of goods/services, contract conclusion date, contractor name, contract amount, etc. ① Number of former executives and former section chiefs and above (former employees) of this agency, their job titles, and their final positions at this agency. ② Transaction volume with this agency. ③ Indication of whether the proportion of transactions with this agency to total sales or business revenue falls into one of the following categories: one-third or more but less than one-half, one-half or more but less than two-thirds, or two-thirds or more. ④ Indication if it is a single bidder or single applicant. III. Information to be Provided to Us: ① Information regarding former employees currently employed at the time of contract conclusion (number, current job title, final position at this agency, etc.). ② Total sales or business revenue for the most recent fiscal year and transaction volume with this agency. IV. Disclosure Date: Generally within 72 days from the contract conclusion date (generally within 93 days for contracts concluded in April). (7) Other: Details are provided in the bidding documents. 9. T: Purchase of Replacement Passenger Vehicle (Hybrid, 5-seater) D: Purchase of Replacement Passenger Vehicle (Hybrid, 5-seater) Procurement Item Number: 0000000000000628463 Procurement Type: Open Competitive Bidding Announcement (Excluding WTO) Classification: Goods and Services Procurement Item Name: Purchase of Replacement Passenger Vehicle (Hybrid, 5-seater) Publication Start Date: October 20, Reiwa 8 Publication End Date: November 13, Reiwa 8 Procurement Organization: Consumer Affairs Agency Procurement Organization Location: Tokyo Announcement Content: Tender Announcement The following is an open competitive tender. October 20, Reiwa 8 Authorized Officer for Expenditures, Director of General Affairs Division, Consumer Affairs Agency, Takahiro Horiuchi Details: 1. Office and Name of Contracting Officer: Authorized Officer for Expenditures, Director of General Affairs Division, Consumer Affairs Agency, Takahiro Horiuchi 2. Matters for Competitive Bidding: (1) Subject: Purchase of Replacement Passenger Vehicle (Hybrid, 5-seater) (2) Specifications and Quantity, etc.: Refer to bidding documents. (3) Delivery Location: Refer to bidding documents. (4) Delivery Deadline: March 31, Reiwa 9 (5) Bidding Method, etc.: The bid amount shall be the total price. The successful bidder will be determined by the comprehensive evaluation bidding system, so please submit the document stating the bid amount (hereinafter referred to as "bid form") and performance certificate, etc. When determining the successful bidder, the bid price will be the amount stated on the bid form plus 10% of that amount. Therefore, bidders shall write the amount equivalent to 100/110 of their estimated contract amount on the bid form, regardless of whether they are taxable or non-taxable businesses for consumption tax and local consumption tax. (6) Use of Electronic Procurement System: This is a project subject to the use of the electronic bidding function of the electronic procurement system (Government Electronic Procurement (GEPS)). However, those for whom electronic bidding is difficult may use the paper bidding method using the form specified in the bidding documents. 3. Qualifications Required for Participation in Competitive Bidding: (1) Not subject to the provisions of Article 70 of the Budget, Settlement, and Accounting Order. However, this does not apply to minors, persons under guardianship, or persons under assistance who have obtained the necessary consent for contract conclusion. (2) Not subject to the provisions of Article 71 of the Budget, Settlement, and Accounting Order. (3) Must have been ranked in grade A, B, C, or D in "Sales of Goods (Vehicles, etc.)" in the Reiwa 07/08/09 fiscal year unified qualification examination for competitive bidding participants under the jurisdiction of the Cabinet Office. (4) Must not be within the period of designation suspension based on the "Measures Regarding Designation Suspension, etc., for Contracts for Goods and Services" by the Consumer Affairs Agency. (5) Submit the performance certificate, etc., as described in Section 5 below and undergo prior screening. 4. Location for Showing Contract Conditions and Distributing Bidding Documents: Location: 3-1-1 Kasumigaseki, Chiyoda-ku, Tokyo, Consumer Affairs Agency, General Affairs Division, Management Office, Contract Section, Phone Number: 03-3507-8800 (Ext. 2424) 5. Deadline and Location for Submission of Performance Certificate, etc.: (1) Submission Deadline: Friday, November 6, Reiwa 8, until noon. (2) Submission Location: Consumer Affairs Agency, General Affairs Division, Management Office, Contract Section. (3) Notification of Screening Results: Will be notified to all parties by Tuesday, November 10, Reiwa 8. 6. Date, Time, and Place of Bidding and Bid Opening: (1) Mail Bid Deadline: Friday, November 13, Reiwa 8, until noon. (2) Bidding/Bid Opening: Friday, November 13, Reiwa 8, 2:00 PM, Consumer Affairs Agency Bidding Room. 7. Bid Bond and Contract Deposit: Exempt. 8. Invalid Bids: Bids submitted by persons who do not possess the necessary qualifications for participation in bidding as stated in this announcement, and bids that violate the conditions of bidding, are invalid. 9. Method of Determining the Successful Bidder: The successful bidder will be determined from among the bidders who have submitted proposals meeting all the performance requirements specified in the bidding documents, within the limit of the estimated price established based on Article 79 of the Budget, Settlement, and Accounting Order, using the comprehensive evaluation method specified in the bidding documents. 10. Requirement for Contract Document Preparation: A contract document shall be prepared upon conclusion of the contract. 11. Other: Details are provided in the bidding documents. Procurement Documents 1 Procurement Documents 1 Download URL Procurement Documents 2- Procurement Documents 3- Procurement Documents 4- Procurement Documents 5- 10. T: [Tokyo Labor Bureau] Purchase of Voice-Guided Number Display System at Hachioji Public Employment Security Office D: [Tokyo Labor Bureau] Purchase of Voice-Guided Number Display System at Hachioji Public Employment Security Office Procurement Item Number: 0000000000000628539 Procurement Type: Open Competitive Bidding Announcement (Excluding WTO) Classification: Goods and Services Procurement Item Name: [Tokyo Labor Bureau] Purchase of Voice-Guided Number Display System at Hachioji Public Employment Security Office Publication Start Date: October 20, Reiwa 8 Publication End Date: November 10, Reiwa 8 Procurement Organization: Ministry of Health, Labour and Welfare Procurement Organization Location: Tokyo Announcement Content: According to Public Notice No.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on October 20, 2026. Last refreshed 8 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 東京都豊島区

東京都豊島区 has issued 9 procurement notices on BidsFactory, including 7 currently open and 0 awarded contracts. Activity concentrates in Health & Medical, Construction & Civil Works, and General Supplies & Services. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: October 28, 2026.

Frequently asked questions about this tender

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 東京都豊島区 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Consulting contract in the Media & Communications sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans