Announcement of September 10 (Civil Engineering AB) Announcement of a graded designated open competitive tender. Project Name: Road Improvement Work on Municipal Road Kamihata-cho Wakaba-cho Line.
Tsuruoka City Announcement No. 150 Announcement of a graded designated open competitive tender.
As follows, a graded designated open competitive tender will be executed, and based on the provisions of Article 167-6 of the Local Autonomy Act (Showa 22, Order No. 16) and Article 15 of the Tsuruoka City Contract Regulations (Heisei 17, Tsuruoka City Regulations No. 54), an announcement is made.
Reiwa 8, September 10
Mayor of Tsuruoka, Satoshi Sato
1. Place and date of tender and opening of bids
(1) Place: Tsuruoka City Hall, 6th Floor Conference Room
(2) Date and Time: Reiwa 8, October 1 (Thursday) 9:40 AM
2. Matters subject to competitive bidding
(1) Project Name: Road Improvement Work on Municipal Road Kamihata-cho Wakaba-cho Line
(2) Project Location: Tsuruoka City, Kamihata-cho area
(3) Construction Details: As per design documents (On-site briefing will not be held.)
If there are any doubts regarding the design documents, they will be accepted in writing.
① Inquiry acceptance date: Reiwa 8, September 18 (Friday) by 10:00 AM
② Response: Reiwa 8, September 25 (Friday) from 4:00 PM
(4) Construction Period: Reiwa 8, October 8 to Reiwa 9, January 29
(5) Estimated Price: 26,360,000 yen (excluding consumption tax and local consumption tax).
When determining the successful bidder, the successful bid price will be the amount written on the bid form plus 10% of that amount (if there is a fraction of less than 1 yen, that fraction will be rounded down). Therefore, bidders shall state in their bid form an amount equivalent to 100/100 of their estimated contract desired amount, regardless of whether they are taxable or exempt from consumption tax and local consumption tax.
3. Qualifications of bidders
(1) Bidders must be graded in accordance with the "Tsuruoka City Construction Work Designated Competitive Bidding Participant Grading Regulations" (Heisei 17, Tsuruoka City Public Announcement No. 19) and meet all of the following requirements:
① Work Type: General Civil Engineering Works
② Grade: A, B
③ In-city Head Office/Branch Office Requirement: Must have a head office within the city.
④ Engineer Requirements: ----------------------------------------
⑤ Construction Experience: ----------------------------------------
⑥ Other: ----------------------------------------
(2) Regarding the exclusion of organized crime, the bidder must not fall under the provisions of Article 49, Item 11 of the Tsuruoka City Construction Contract Terms and Conditions.
(3) For public works subject to the Construction Industry Act, a supervising engineer or chief engineer responsible for the technical management of construction work at the construction site must be appointed. Therefore, please confirm the planned engineers in advance. Also, to ensure proper operation of the supervising (chief) engineer system, please refer to the "Supervising Engineer System Operation Manual" on the Ministry of Land, Infrastructure, Transport and Tourism website.
* Regarding "5. Preparation of construction system ledger and creation of construction system diagram" in the "Supervising Engineer System Operation Manual", please refer to the "Tsuruoka City Guidelines for Proper Management of Prime Contractor and Subcontractor Relationships in Construction Projects" as stipulated by Tsuruoka City. (https://www.city.tsuruoka.lg.jp/sangyo/nyusatsu/nyuusatukeiyakuseido/syakaihokenmikanyu.html)
(4) Regarding the site manager, please refer to "(Notice) Requirements for Concurrent Site Manager Positions in Construction Projects" posted on the city's website "Tender Information". For this project, the site manager may concurrently serve as the site manager for another project only when the supervising engineer (including a special supervising engineer) is not required to be assigned, and with the approval of the contracting authority based on the successful bidder's application.
4. Place to view contract provisions, etc.
(1) Viewing Location: Tsuruoka City website and Tsuruoka City Hall, 3rd Floor Contract Management Division
(2) Viewing Period: Until the day before the bid date
* Please contact us by phone in advance for lending of drawings, etc. Also, depending on the project, all data may be posted on the Tsuruoka City website as electronic data.
5. Matters concerning bid and contract deposit
(1) Bid Deposit: Exempt
(2) Contract Deposit: Amount equivalent to 1/10 of the contract amount
6. Application and confirmation of bidders
(1) Submit 2 copies of the "Application for Qualification Confirmation for Graded Designated Open Competitive Bidding" to the Contract Management Division, Tsuruoka City Hall, 3rd Floor, or the Regional Development Promotion Division, Regional Branch Office by Reiwa 8, September 29 (Tuesday) (mail is acceptable (enclose a return envelope). However, it must arrive by the deadline). One copy will be returned with an official receipt stamp.
(2) To become a prime contractor for public works subject to the Construction Industry Act, a valid "Notification of Business Scale Evaluation Results / Overall Evaluation Score Notification" (hereinafter referred to as "Notification") is required. Simply applying for a business status examination does not allow you to undertake public works; you must have completed the examination and received the notification to apply for bidding and participate in bidding. When accepting the bid application, we will confirm the Notification that is valid from the contract date onwards. Please copy it to the back of the bid application form when submitting your bid application. Attaching it as a separate document is also possible.
* The bidder must not have been subject to a suspension of bidding during the period from the final day of application acceptance to the contract date. If the bidder is suspended from bidding after the application is accepted, the application will be canceled, and the bidder will not be able to participate in the bid. If the bidder is suspended from bidding after the bid is awarded and before the contract is concluded, the bid award will be canceled.
7. Other conditions related to bidding
(1) Please refer to "Bidding Conditions", "Tsuruoka City Bidding Guidelines", and "Tsuruoka City Graded Designated Open Competitive Bidding Implementation Guidelines for Construction Projects". Bidding may be canceled in accordance with Article 10 of the "Tsuruoka City Graded Designated Open Competitive Bidding Implementation Guidelines for Construction Projects".
(2) When bidding, submit a breakdown of construction costs of the same amount as the first bid form, with the location, trade name, and representative's name filled in and stamped (unit prices are not required for the "design document excluding costs" items). Failure to submit will result in disqualification from bidding.
(3) This project is subject to the Tsuruoka City Variable Minimum Reserve Price System. When determining the successful bidder, the bidder who bid within the limit of the estimated price and submitted the lowest bid at or above the minimum reserve price will be the successful bidder. If a bid below the minimum reserve price is submitted, the bidder will be disqualified. For details, please refer to the "Tsuruoka City Variable Minimum Reserve Price System Implementation Guidelines" on the city's website.
(https://www.city.tsuruoka.lg.jp/sangyo/nyusatsu/nyuusatukeiyakuseido/301227henndougata.html)
(4) This project is a work that secures two days off per week (monthly basis) as designated by the contracting authority. Please check the special specifications or on-site briefing details. For details, please refer to the "Tsuruoka City Implementation Guidelines for Securing Two Days Off per Week (Four Weeks, Eight Days Off Site Closure) in Construction Projects" on the city's website.
(https://www.city.tsuruoka.lg.jp/sangyo/nyusatsu/nyuusatukeiyakuseido/keiyaku0120220401173.html)
(5) For works with a contract amount exceeding 1.3 million yen, advance payment can be requested. For works with a contract amount of 10 million yen or more that meet the requirements, interim advance payment can be requested. (Tsuruoka City Construction Contract Terms and Conditions, Article 36, Paragraphs 1 and 3)
8. Contact Information
Tsuruoka City Hall, General Affairs Department, Contract Management Division
Phone (Direct Dial): 35-1154
Municipal Road Kamihata-cho Wakaba-cho Line Road Improvement Work
Design Reviewer
Designer
"In creating this map, the 1:25,000 topographic map published by the Geospatial Information Authority of Japan was used with the approval of the Director of the Geospatial Information Authority of Japan.
(Approval Number: Heisei 24, Jo-shi, No. 244-30078)"
1:100000
100 200 300 400 500 m
Project Number
Construction Year: Reiwa 8
Project Name: Road Improvement Work on Municipal Road Kamihata-cho Wakaba-cho Line
Project Location: Tsuruoka City, Kamihata-cho and Wakaba-cho areas
Construction Manager
Tsuruoka City
Design Classification
Implementation
Route Name
Municipal Road Kamihata-cho Wakaba-cho Line
Construction Period: Reiwa Year Month Day to Reiwa Year Month Day
Construction Days: Days
Department Name: Civil Engineering Division
Estimation Manager
Total Amount
Construction Price
Consumption Tax Equivalent
Construction Outline
Construction Length L=137.6m
Municipal Road Kamihata-cho Wakaba-cho Line L=116m
Soundproof Ditch B300*H300 L= 2.0m
Gradient Adjustment Ditch B500*600 L=11.0m
B600*800 L= 7.0m
Rebar Work
Concrete Waterway B600*800 L= 1.0m
Centrifugal BOX Culvert φ500 L= 7.0m
φ700 L=10.0m
Gantry Bollard N=10 units
Wakaba-cho Line No. 3 L=21.6m
Soundproof Ditch B300*H300 L=18.0m
Soundproof Gradient Adjustment B300*H400 L= 4.0m
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
Main Construction Cost
Road Improvement Work
Two Days Off Per Week
Labor Costs
1.02
Month
Unit
1
Earthwork
Unit: 1
Earthwork
Unit: 1
Item No. 1 Breakdown
Excess Soil Disposal Work
Unit: 1
Item No. 2 Breakdown
Slope Work
Unit: 1
Slope Shaping Work
Unit: 1
Item No. 3 Breakdown
Weed Control Concrete Work
Unit: 1
Item No. 4 Breakdown
Drainage Work
Unit: 1
Work Execution
Unit: 1
Item No. 5 Breakdown
Waterway Work
Unit: 1
Item No. 6 Breakdown
Culvert Work
Unit: 1
Item No. 7 Breakdown
Catch Basin Work
Unit: 1
Item No. 8 Breakdown
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
Guardrail Work
Unit: 1
Work Execution
Unit: 1
Item No. 9 Breakdown
H-Beam Bollard (Vehicle Type) Foundation Work
Unit: 1
Item No. 10 Breakdown
Guardrail Work
H-Beam Bollard (Vehicle Type)
Unit: 1
Item No. 11 Breakdown
Removal Work
Unit: 1
Removal Work
Unit: 1
Item No. 12 Breakdown
Structure Demolition Work
Unit: 1
Work Execution
Unit: 1
Item No. 13 Breakdown
Pavement Slab Demolition Work
Unit: 1
Item No. 14 Breakdown
Structure Demolition Work (Unreinforced Structure)
Unit: 1
Item No. 15 Breakdown
Structure Demolition Work (Reinforced Structure)
Unit: 1
Item No. 16 Breakdown
Pavement Work
Unit: 1
Roadway Pavement Work
Unit: 1
Item No. 17 Breakdown
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
Sidewalk Pavement Work
Unit: 1
Item No. 18 Breakdown
Entrance Road Work
Unit: 1
Item No. 19 Breakdown
Color Pavement Work Green
Unit: 1
Item No. 20 Breakdown
Line Work
Unit: 1
Line Work
Unit: 1
Item No. 21 Breakdown
Temporary Work
Unit: 1
Dewatering Work
Unit: 1
Item No. 22 Breakdown
Traffic Management Work
Unit: 1
Item No. 23 Breakdown
1
Earthwork
Unit: 1
Earthwork
Unit: 1
Item No. 24 Breakdown
Drainage Work
Unit: 1
Work Execution
Unit: 1
Item No. 25 Breakdown
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
Waterway Work
Unit: 1
Item No. 26 Breakdown
Side Ditch Closure Work
Unit: 1
Item No. 27 Breakdown
Pavement Work
Unit: 1
Roadway Pavement Work
Unit: 1
Item No. 28 Breakdown
Concrete Pavement Work
Unit: 1
Item No. 29 Breakdown
Line Work
Unit: 1
Line Work
Unit: 1
Item No. 30 Breakdown
Structure Demolition Work
Unit: 1
Pavement Slab Demolition Work
Unit: 1
Item No. 31 Breakdown
Structure Demolition Work Unreinforced Structure
Unit: 1
Item No. 32 Breakdown
Structure Demolition Work Reinforced Structure
Unit: 1
Item No. 33 Breakdown
Removal Work
Unit: 1
Removal Work
Unit: 1
Item No. 34 Breakdown
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
Regulation Sign Work
Unit: 1
Item No. 35 Breakdown
1
Retaining Wall Work
Unit: 1
Small Gravity Retaining Wall Work
Unit: 1
Item No. 36 Breakdown
Fence Work
Unit: 1
Item No. 37 Breakdown
Construction Waste Wood Disposal
Unit: 1
Item No. 38 Breakdown
Direct Construction Cost Total
Common Temporary Work Cost Total
Common Temporary Work
Unit: 1
Site Environmental Improvement Cost
Unit: 1
Item No. 24 Breakdown
Net Construction Cost
Construction Cost
This Project Breakdown
Construction Classification
Work Type
Category
Subcategory
Unit
Quantity
Unit Price
Amount
Remarks
General Administrative Cost (including contract guarantee fee)
Unit: 1
Works requiring monetary guarantee from the contracting authority
Construction Price
Consumption Tax Equivalent
Total Amount
Indirect Construction Breakdown
Design Conditions
Calculation Basis
* When multiplying by a correction factor, multiply by the factor and round to two decimal places, truncating at the third decimal place.