Tenders/Announcement of Reiwa 8 (Electrical A/B) Graded General Competitive Bidding. Project Name: Tsuruoka City Public Sewerage Project Nezugasaki NO.12 Manhole Pump Improvement Work
Open🇯🇵JapanWorks

Announcement of Reiwa 8 (Electrical A/B) Graded General Competitive Bidding. Project Name: Tsuruoka City Public Sewerage Project Nezugasaki NO.12 Manhole Pump Improvement Work

Auto-translated from Japanese
Original title: 9月15日公告(電気A・B)格付指定型一般競争入札の公告について 工事名:鶴岡市公共下水道事業 鼠ヶ関NO.12マンホールポンプ改良工事
山形県鶴岡市
Published: Sep 15, 2026
Updated: Sep 19, 2026
Source: jp_kkj

About This Opportunity

This is a works contract in the construction and civil works and water and sanitation sectors, with a focus on Wastewater, Sanitation, Groundwater and Demolition. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Tsuruoka City Sewerage Project Announcement No. 33 Announcement of Graded General Competitive Bidding Public notice is hereby given of a graded general competitive bidding to be executed as follows, pursuant to the provisions of Article 167-6 of the Local Autonomy Act Enforcement Order (1947 Cabinet Order No. 16) and Article 15 of the Tsuruoka City Contract Regulations (2005 Tsuruoka City Regulations No. 54). September 15, Reiwa 8 Satoshi Sato, Mayor of Tsuruoka City 1. Bidding and Bid Opening Location and Time (1) Location: Large Conference Room, 2nd Floor, Tsuruoka City Sewerage Department (2) Date and Time: 9:30 AM on October 5, Reiwa 8 (Monday) 2. Matters for Competitive Bidding (1) Project Name: Tsuruoka City Public Sewerage Project Nezugasaki NO.12 Manhole Pump Improvement Work (2) Project Location: Within Nezugasaki, Tsuruoka City (3) Construction Details: As per design documents (On-site briefing will not be held). Questions regarding design documents will be accepted in writing. ① Question Acceptance Date: By 10:00 AM on September 28, Reiwa 8 (Monday) ② Response: From 4:00 PM on September 29, Reiwa 8 (Tuesday) (4) Construction Period: From October 14, Reiwa 8 (Wednesday) to March 31, Reiwa 9 (Wednesday) (5) Estimated Price: 10,520,000 yen (excluding tax and local consumption tax). For bid award determination, the bid price will be the amount stated in the bid form plus an amount equivalent to 10/100 of that amount (if there is a fraction of less than 1 yen, that fraction will be rounded down). Therefore, bidders must state in their bid form the amount equivalent to 100/110 of their estimated contract desired amount, regardless of whether they are subject to consumption tax and local consumption tax or are exempt. 3. Qualifications for Bidders (1) Must be graded according to the Tsuruoka City Construction Work Designation Competitive Bidding Participant Grading Regulations (2005 Tsuruoka City Public Notice No. 19) and meet all of the following requirements. ① Work Type: Electrical Construction ② Grade: A, B ③ In-city Head Office/Branch Office Requirement: Must have a head office within the city. ④ Engineer Requirements, etc.: As per the attached "Specifications" for this project. ⑤ Construction Experience (2) Must not fall under Article 49, Paragraph 11 of the Tsuruoka City Construction Contract Terms regarding the exclusion of organized crime groups. (3) For public works subject to the Construction Industry Act, a supervising engineer or chief engineer must be assigned to manage the technical aspects of construction work at the construction site. Therefore, please confirm the planned engineers in advance. Also, for the proper operation of the supervising (chief) engineer system, please refer to the "Supervising Engineer System Operation Manual" on the Ministry of Land, Infrastructure, Transport and Tourism website. *Regarding "5. Maintenance of Construction System Ledger and Creation of Construction System Diagram" in the "Supervising Engineer System Operation Manual," Tsuruoka City has established the "Tsuruoka City Guidelines for Proper Management of Prime Contractor-Subcontractor Relationships in Construction Work," so please refer to it. (https://www.city.tsuruoka.lg.jp/sangyo/nyusatsu/nyuusatukeiyakuseido/sitaukesidouyouryou.html) (4) For site supervisors, please refer to "(Notice) Conditions for Concurrent Holding of Site Supervisor Position in Construction Work" posted on the city's website under "Bidding Information." In this project, concurrent holding of the site supervisor position with another project is permitted only when the assignment of a supervising engineer (including a special supervising engineer) is not required, and upon approval by the ordering party based on the successful bidder's application. 4. Location for Showing Contract Terms, etc. (1) Viewing Location: Tsuruoka City website and Tsuruoka City Sewerage Department. (2) Viewing Period: Until the day before the bidding date. 5. Matters Regarding Bidding and Contract Security Deposit: (1) Bid Bond: Exempt. (2) Contract Security Deposit: An amount equivalent to 10/100 of the contract amount. 6. Application and Confirmation of Bidders: (1) Submit 2 copies of the Graded General Competitive Bidding Participant Qualification Application Form to the Contract and Inspection Office, General Affairs Division, Tsuruoka City Sewerage Department by October 1, Reiwa 8 (Thursday) (mail is acceptable (enclose a return envelope). Must arrive by the deadline). One copy will be returned with a receipt stamp. (2) For public works subject to the Construction Industry Act where the prime contractor is to be the successful bidder, a valid "Notification of Evaluation of Management Scale, etc. / Notification of Overall Evaluation Score" (hereinafter referred to as "Result Notification") is required. Simply applying for the management performance review is not sufficient to contract for public works; the review must be completed and the result notification received to participate in the bidding application and bidding. When accepting the bidding participation application, confirmation of the Result Notification valid from the contract conclusion date onwards will be performed. Please attach a copy to the back of the bidding participation application form. Attaching it as a separate document is also possible. *Must not be subject to suspension of designation on any day during the period from the final day of application acceptance to the contract conclusion date. If suspension of designation is imposed after application acceptance, the application will be canceled, and participation in the bidding will not be permitted. If suspension of designation is imposed after the bid award and before the contract conclusion, the bid award will be canceled. 7. Other Bidding Conditions: (1) Please refer to the "Bidding Conditions," "Tsuruoka City Bidding Guidelines," and "Tsuruoka City Graded General Competitive Bidding Implementation Guidelines." Bidding may be canceled in accordance with Article 10 of the Tsuruoka City Graded General Competitive Bidding Implementation Guidelines. (2) At the time of bidding, submit a construction cost breakdown with the same amount as the first bid form, including the location, trade name, and representative's name, and affix your seal (unit price details are not required for the "design document excluding costs" items). Failure to submit will result in disqualification from bidding. (3) This project is subject to the Tsuruoka City Sewerage Department's Variable Minimum Restriction Price System. For bid award determination, the successful bidder will be the one who submits the lowest bid at or above the minimum restriction price among those who bid within the limit of the estimated price. If a bid below the minimum restriction price is submitted, the bidder will be disqualified. The coefficient for calculating the minimum restriction price for this project is as follows: "Coefficient related to the provisions of Article 6, Paragraph 5 of the Implementation Guidelines: 83 percent." For details, please refer to the "Tsuruoka City Sewerage Department Variable Minimum Restriction Price System Implementation Guidelines" on the city's website. (https://www.city.tsuruoka.lg.jp/kurashi/suido/gesui/suido_nyusatsu/hendo.files/hendou.pdf) (4) For contracts exceeding 1.3 million yen, advance payment can be requested. For contracts of 10 million yen or more that meet the requirements, interim advance payment can also be requested. (Tsuruoka City Construction Contract Terms, Article 36, Paragraphs 1 and 3) 8. Inquiries: Contract and Inspection Office, General Affairs Division, Tsuruoka City Sewerage Department Phone: 23-7731 997-0819 2-10 Nozomi-cho, Tsuruoka City FAX: 24-7033 Reiwa 8 Nezugasaki NO.12 Manhole Pump Improvement Work Tsuruoka City Public Sewerage Project Nezugasaki, Tsuruoka City Tsuruoka City Sewerage Division Construction Location Location Map S=FREE - Pump control panel installation N=1 unit Design Outline Revision Outline Nezugasaki NO.12 Manhole Pump Outdoor Pillar Type, for 2.2kW - Pump control panel (existing control panel) removal N=1 unit Construction Cost Breakdown Upper: Original, Lower: Revised Contract Price Consumption Tax, etc. Total Contract Price Construction Cost Consumption Tax, etc. (Total) Construction Price Electrical Equipment Work Construction Price Summary Construction Cost Unit | Quantity | Item | Type | Sub-type | Unit Price | Amount Reiwa 8 Tsuruoka City Public Sewerage Project Nezugasaki NO.12 Manhole Pump Improvement Work Electrical Equipment Work (Breakdown, Detailed Statement, Quantity Summary) Construction Cost Breakdown (Electrical Equipment Work) Upper: Original, Lower: Revised (Accumulated Safety Costs) Common Temporary Work Costs Electrical Detailed Statement No. 8 Temporary Work Costs (Accumulated) Unit Price | Amount | Summary Item | Type | Sub-type | Quantity | Unit Electrical Equipment Work Direct Construction Costs Direct Material Costs Electrical Detailed Statement No. 2-1, No. 2-2 Ancillary Material Costs Material Costs Labor Costs Electrical Detailed Statement No. 3 (General Labor Costs) Labor Costs (Technical Labor Costs (Installation)) Direct Expenses Direct Expenses (Machinery Costs) Temporary Work Costs Electrical Detailed Statement No. 7 Composite Work Costs Direct Construction Costs Indirect Construction Costs Common Temporary Work Costs Site Management Costs Installation Indirect Costs Installation Indirect Costs (Installation (Machinery) Indirect Costs) Installation Construction Costs General Management Costs, etc. Labor Costs Electrical Detailed Statement No. 5 (Technical Labor Costs (Simple Adjustment/Testing)) Construction Costs Indirect Construction Costs Composite Work Costs Electrical Detailed Statement No. 6 Machinery Costs Temporary Work Costs (Rate) (Installation (Technical Staff) Indirect Costs) Installation Indirect Costs Unit Price | Amount | Summary Total Switchboard SUS316, 300W x 400H x 200D | Unit | 1 (Friction type level switch) Level gauge cable 20m | Unit | 1 (Bubble type) Water level gauge tube 20m | Unit | 1 Monitoring device setting cost Cloud-based monitoring device | Airport | 1 3-phase 200V, for 2.2kW, with sequencer built-in Manhole pump control panel Outdoor pillar type, SUS316, 700W x 450D x 1625H | Unit | 1 Electrical Detailed Statement No. 1-1 Machinery Costs (New Installation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Unit Total Level gauge | | 3 | | | Existing removal (Friction type level switch) Switchboard | | 1 | | | Existing removal Level gauge cable 20m | | 1 | | | Existing removal (Bubble type) Water level gauge tube 20m | | 1 | | | Existing removal Monitoring device setting cost Cloud-based monitoring device | | 1 | | | Existing removal Electrical Detailed Statement No. 1-2 Machinery Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Manhole pump control panel Outdoor pillar type | - | - | - | - | - | - | - | - | - | - | - | - | - | - Unit Total Cables, wires, etc. Accessory material costs Jointing materials Cables, wires, etc. Accessory material costs (with bands) Concrete anchor A, B type, 1000L | Unit | 1 Concrete pole L8.0m, tip diameter 14cm | Piece | 1 Grounding rod connection terminal for φ10, 22mm² x 500mm | Unit | 1 Grounding rod φ10 x 1500mm | Piece | 1 Bell mouth FEP50 | Unit | 3 Different pipe connection material H type, FEP50 | Set | 3 Connector HIVE54 | Unit | 3 Entrance cap HIVE22 | Unit | 1 Corrugated rigid polyethylene pipe FEP50 | m | 19.80 Impact-resistant rigid vinyl chloride conduit HIVE54 | m | 3.30 Impact-resistant rigid vinyl chloride conduit HIVE22 | m | 7.70 Grounding wire IV5.5 | m | 1.76 No material cost accounted for accessories (accessories) Level gauge cable CVV0.75-3C | m | 16.61 No material cost accounted for accessories (accessories) Water level gauge cable dedicated tube | m | 16.61 No material cost accounted for accessories (accessories) Immersion detection cable 2PNCT2.0-1C | m | 33.22 No material cost accounted for accessories (accessories) Overheat detection cable 2PNCT1.25-2C | m | 33.22 No material cost accounted for accessories (accessories) Pump cable VCT1.25-4C | m | 9.24 Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 2-1 Direct Material Costs (New Installation) Upper: Original, Lower: Revised Unit Total Concrete pole L8.0m, tip diameter 14cm | Piece | 1 | | | Existing removal Corrugated rigid polyethylene pipe FEP50 | m | 7.50 | | | Existing removal Entrance cap VE22 | Unit | 2 | | | Existing removal Rigid vinyl chloride conduit VE54 | m | 4.80 | | | Existing removal Corrugated flexible conduit PF22 | m | 6.00 | | | Existing removal Wire IV5.5 | m | 1.60 | | | Existing removal Grounding rigid vinyl chloride conduit VE22 | m | 12.00 | | | Existing removal Cable 2PNCT2.0-1C | m | 23.20 | | | Existing removal (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 | | | Existing removal (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No. 2 Pipe protection section BH0.13㎥,丘砂 | ㎥ | 3 | | | Unit Price Table No. 3 Backfill section earth and sand transport DT2t, 3.8km | ㎥ | 10 | | | Unit Price Table No. 4 Concrete drilling | Concrete drilling machine | Hole | 3 | | | Unit Price Table No. 5 64mm or more, 77mm or less, 50mm or more, 200mm or less Sewerage buried marker sheet Width 150mm, 2x | m | 18 Polyethylene cloth Buried marker tape Width 30mm, thickness 0.15mm±0.03mm | m | 20 Corrugated rigid polyethylene pipe FEP50 | m | 7.50 Rigid vinyl chloride conduit VE54 | m | 4.80 Flexible conduit PF22 | m | 6.00 Wire IV5.5 | m | 1.60 Grounding rigid vinyl chloride conduit VE22 | m | 12.00 Cable 2PNCT2.0-1C | m | 23.20 (Accessories) Immersion detection cable CVV0.75-3C | m | 34.80 (Accessories) | | | | | Level gauge cable | | 23.20 | | | Existing removal (Accessories) Pump cable 2PNCT1.25-2C | m | 23.20 | | | Existing removal (Accessories) Overheat detection cable | | | | | Electrical Detailed Statement No. 2-2 Direct Material Costs (Removal/Reinstallation) Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Cable VVR(SV)3.5-3C | m | 8.40 | | | Existing removal Power cable VVR(SV)3.5-2C | m | 8.00 | | | Existing removal Lighting cable VCT1.25-4C | | | | | Unit Total General laborers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 3 Labor Costs (General Labor Costs) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 4 Labor Costs (Technical Labor Costs (Installation)) Upper: Original, Lower: Revised Unit Total Electrical and Telecommunications Engineers | Person Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Electrical Detailed Statement No. 5 Labor Costs (Technical Labor Costs (Simple Adjustment/Testing)) Upper: Original, Lower: Revised Unit Electrical Detailed Statement No. 6 Composite Work Costs Upper: Original, Lower: Revised Item | Shape/Dimensions | Quantity | Unit Price | Amount | Summary Excavation BH0.13㎥ | ㎥ | 10 | | | Unit Price Table No. 1 Backfill BH0.13㎥,丘砂 | ㎥ | 1 | | | Unit Price Table No.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on September 15, 2026. Last refreshed 1 day ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 山形県鶴岡市

山形県鶴岡市 has issued 122 procurement notices on BidsFactory, including 11 currently open and 0 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Transport & Logistics. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: September 17, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by 山形県鶴岡市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
Japanese

Source

jp_kkj
jp_kkj
Official Source

Contracting Authority

山形県鶴岡市
🇯🇵Japan

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.