Tenders/Kasumi Kogo Line (Section 9) Road New Construction and Other Work (8-1)
Open🇯🇵JapanWorks

Kasumi Kogo Line (Section 9) Road New Construction and Other Work (8-1)

Auto-translated from Japanese
Original title: 霞庚午線(9工区)道路新設その他工事(8-1)
広島県広島市
Published: Oct 23, 2026
Updated: Oct 27, 2026
Source: 官公需 (kkj.go.jp)

About This Opportunity

This is a works contract in the architecture and engineering, transport and logistics and construction and civil works sectors, with a focus on Roads, Demolition, Quantity Surveying and Warehousing. Located in Japan, Asia, this opportunity is open to firms and consortiums.

Published through 官公需 (kkj.go.jp), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from Japanese
Tender Announcement Trial Implementation of Comprehensive Evaluation (Simplified Type) - Trial Implementation of Post-Contract VE - Trial Implementation of Two-Day Weekend Work (Contractor-Designated Type) - Trial Implementation of Construction for which Calculation Disputes Can Be Filed Reiwa 8, October 23rd In accordance with the provisions of Article 234, Paragraph 1 of the Local Autonomy Act, we hereby announce the following regarding the conclusion of a contract for construction work through general competitive tender, in accordance with the provisions of Article 167-6, Paragraph 1 of the Local Autonomy Act Enforcement Order and Article 4 of the Hiroshima City Contract Regulations. Kazumi Matsui, Mayor of Hiroshima City Work Name: Kasumi Kogo Line (Section 9) Road New Construction and Other Work (8-1) Work Location: Nishi Kasumi Town, Minami Ward, etc. Work Outline: Construction length: Approx. 490 meters Paving work: Approx. 7,600 sq. meters Road improvement Road earthwork, drainage structure work, retaining wall work, ground improvement work, paving work, line marking work, curb work, guardrail work, sign work, structure removal work, temporary work: 1 set Utility tunnel Earthwork, utility tunnel work, road accessory work, paving work, structure removal work, temporary work: 1 set * Details are as per design drawings and specifications (hereinafter referred to as "Design Drawings, etc."). Construction period: 440 days from the date of contract conclusion Estimated price: To be announced after tender decision Evaluation standard price: To be announced after tender decision Application of Comprehensive Evaluation and Tender Method: - To ensure the quality of this work, a comprehensive evaluation and tender method (simplified type) will be applied, which comprehensively evaluates technical capabilities based on simple construction plans and corporate construction capabilities, along with price, to determine the successful tenderer. Tender classification: - Tenders for this work are subject to electronic tenders using the Hiroshima City Electronic Bidding System. - Furthermore, tenders for this work are limited to the use of the electronic bidding system, and paper tenders are not permitted. - Tender procedures shall be in accordance with the "Hiroshima City Electronic Bidding System Usage Agreement" and "Hiroshima City Electronic Bidding Operation Standards". Tender participation conditions: Persons who meet all of the following conditions: Qualifications: - Not falling under Article 167-4 of the Local Autonomy Act Enforcement Order and Article 2 of the Hiroshima City Contract Regulations. - Certified as a contractor for Hiroshima City construction work competitive tenders in Reiwa 7-8. - Must have acquired an IC card in the tenderer's name and completed user registration in the electronic bidding system. - Other qualification requirements are as per the tender instructions. Certified work type: Civil Engineering (General), etc. Grade classification, etc.: Certified as "B" or "A". Business office, etc.: - "B" Grade: Must have a head office or branch office, etc. in Hiroshima City. - "A" Grade: Must have its head office in Hiroshima City. * Head office refers to the principal place of business under the Construction Industry Act, and branch office, etc. refers to a secondary place of business (limited to those who have been delegated by this city for continuous bidding, etc.) under the Construction Industry Act. Company construction experience: Must have experience in the following work as the prime contractor, completed and delivered on or after April 1, Heisei 23: - Work involving the construction of asphalt pavement with an area of 3,000 square meters or more. However, construction experience as a member of a joint venture is limited to those with a capital contribution ratio of 20% or more. Technician: i. Must be able to assign a chief technician or supervising engineer for civil engineering works to the said work. If the contract amount is 45 million yen (including tax) or more, they must be assigned exclusively. Furthermore, if a supervising engineer (as defined in Article 26, Paragraph 3, Item 2 of the Construction Industry Act; hereinafter referred to as "supervising engineer") who is concurrently assigned under Special Exception Rule No. 2 is appointed, a supervising engineer assistant (a person who assists the duties stipulated in Article 26, Paragraph 4, Item 1 of the same Act, performed by the concurrently assigned supervising engineer) must be assigned exclusively to the said work. However, technicians shall be those stipulated in Paragraphs 1 to 5 of Article 26 of the same Act. ii. Technicians must be persons with a direct and continuous employment relationship with the tenderer at the time of tender opening, and have been employed for 3 months or more prior to the tender opening date. However, for contract amounts less than 45 million yen (including tax), technicians must be persons with a direct and continuous employment relationship with the tenderer at the time of tender opening, and have been employed prior to the day before the tender opening date. iii. Regarding the concurrent assignment of technicians, including cases where exclusive assignment is required, it will be permitted within the scope of the conditions described in the tender instructions if the conditions are met. Other: - Contractors who have been entrusted with the design work for this work (Shasoku Engineering Co., Ltd., Chuden Technical Consultants Co., Ltd., Hirocon Co., Ltd.) or construction companies with a capital or personnel relationship with such contractors cannot participate. - This work requires, in principle, subcontracting (including secondary and subsequent subcontracting) to contractors with head offices within the city. - Those who do not meet the tender participation conditions cannot participate. Furthermore, those who cannot be selected in accordance with the provisions of Article 28, Item 2, Items 3(a) to (e), and Item 5(a) of the "Hiroshima City Construction Work Competitive Tender Handling Guidelines" cannot participate. - Those who cannot confirm the fulfillment of their obligation to join and pay social insurance (health insurance and employees' pension insurance) and labor insurance (employment insurance) cannot participate (however, this excludes those who are not subject to the obligation to join each insurance). For details, please check the Hiroshima City website (https://www.city.hiroshima.lg.jp/) under "Information for Businesses" -> "Tender/Contract Information" -> "Overview of Tender/Contract System" -> "Construction Work/Construction Consultant Services" -> "Construction Work" -> "System Diagram and Confirmation Documents for Social Insurance/Labor Insurance Enrollment, etc.". Matters related to comprehensive evaluation: As per attachment. Delivery of Tender Instructions, Tender Forms, etc. [Delivery of Tender Instructions] Download from the "Details" of this work by searching for this work in "1. General Public Information" -> "Direct Search Tender/Quotation Information" under "2. Procurement Information Disclosure System" -> "Hiroshima City Electronic Procurement System Portal Site" -> "Electronic Bidding" -> "Tender/Contract Information" -> "Information for Businesses" on the top page of the Hiroshima City website (https://www.city.hiroshima.lg.jp/). [Tender Form Acceptance Period] Using the electronic bidding system, from Reiwa 8, November 16th (Monday) to 17th (Tuesday), from 8:30 AM to 5:00 PM (however, until 4:00 PM on the final day). If it is impossible to send via the electronic bidding system due to unavoidable reasons, submit the tender form along with attached documents by 4:00 PM on the final day after submitting the prescribed notification. [Attached Document Acceptance Period] Same as the tender form acceptance period. (However, if the capacity of the attached documents exceeds the capacity specified in Article 11, Paragraph 2 of the "Hiroshima City Electronic Bidding Operation Standards" for those participating in tenders using the electronic bidding system, submit in person by 4:00 PM on the final day of the tender form acceptance period.) [Tender Form/Attached Document Submission Location] Contracting Division below. Viewing/Delivery of Design Drawings, etc. [Viewing Period] From the date of public notice to Reiwa 8, November 17th (Tuesday), from 8:30 AM to 5:00 PM (however, until 4:00 PM on the final day) (excluding Hiroshima City holidays (holidays as defined in Article 1, Paragraph 1 of the Ordinance on Holidays of Hiroshima City (Reiwa 3, Hiroshima City Ordinance No. 49); hereinafter the same)). [Viewing/Delivery of Design Drawings, etc.] Download from "Tender/Quotation Information" -> "Hiroshima City Procurement Information Disclosure System (for Contractors)" -> "Login Screen" -> "Hiroshima City Procurement Information Disclosure System (for Contractors)" by entering your contractor number (5 digits) and password, and then from "Tender/Quotation Information" on the Hiroshima City website (https://www.city.hiroshima.lg.jp/) under "Information for Businesses" -> "Tender/Contract Information" -> "Electronic Bidding" -> "Hiroshima City Electronic Procurement System Portal Site" -> "2. Procurement Information Disclosure System" -> "2. For Contractors". Note: Design drawings for this work are attached after being reduced from original size A3. * When viewing/delivering design drawings, etc., you will need to enter the download password indicated on the download confirmation form. * When downloading design drawings, etc., the "Download Confirmation Form" attached to the procurement information disclosure system must be submitted with the qualification confirmation application after tender opening. Furthermore, the issuance of the "Download Confirmation Form" is limited to the above viewing period, so please keep it safe. Viewing is also available at the construction work担当課 below. Questions etc. regarding Design Drawings, etc. [Question Submission Period] From the date of public notice to Reiwa 8, November 5th (Thursday) (excluding Hiroshima City holidays). [Viewing/Delivery Period of Response Documents via System] From Reiwa 8, November 10th (Tuesday) to Reiwa 8, November 17th (Tuesday), from 8:30 AM to 5:00 PM (however, until 4:00 PM on the final day) (excluding Hiroshima City holidays). [Viewing/Delivery of Questions/Answers Regarding Design Drawings, etc.] Download from "Tender/Quotation Information" -> "Hiroshima City Procurement Information Disclosure System (for Contractors)" -> "Login Screen" -> "Hiroshima City Procurement Information Disclosure System (for Contractors)" by entering your contractor number (5 digits) and password, and then from "Tender/Quotation Information" on the Hiroshima City website (https://www.city.hiroshima.lg.jp/) under "Information for Businesses" -> "Tender/Contract Information" -> "Electronic Bidding" -> "Hiroshima City Electronic Procurement System Portal Site" -> "2. Procurement Information Disclosure System" -> "2. For Contractors". Viewing is also available at the construction work担当課 below. Tender Opening Date, etc. [Tender Opening Date and Time] Reiwa 8, November 18th (Wednesday), 9:40 AM [Tender Opening Location] Hiroshima City Hall, Main Building, 15th Floor, Tender Room [Number of Tenders] If there are no tenders within the range of the estimated price, a re-tender will be conducted once via the electronic bidding system after sending a re-tender notice. Submission of Application for Confirmation of Tender Participation Qualifications, etc. [Submission of Application (including Comprehensive Evaluation Form and Self-Scoring Sheet)] To be submitted by the tenderer on the tender opening date after tender opening (as described in Items 8 and 9 of the tender instructions). [Submission Location] Construction work担当課 below. Notification of Tender Participation Qualification Confirmation Results and Tender Results After confirmation of tender participation qualifications, the successful tenderer decision notice will be sent via the electronic bidding system. Cancellation of Tender Tenders will be canceled if the fairness of the tender is compromised due to the actions of tender participants or errors in the tender procedures by the contractor. Invalid Tender Tenders submitted by persons who do not meet the tender participation conditions indicated in this tender announcement, tenders with false statements in applications, tenders that violate tender conditions, and tenders by persons whose submitted tender participation qualification confirmation applications cannot be confirmed due to incomplete documents (including errors) shall be deemed invalid. Other: - Tenders for this work are general competitive tenders of the post-tender qualification confirmation type, where the presence or absence of tender participation qualifications is confirmed after tender opening. - This work is subject to mandatory separation and recycling of materials, etc., and recycling of specified construction waste, etc., based on the Act on the Promotion of Proper Treatment of Specified Construction Materials (Act No. 104 of 2000). - This work is a trial project for the VE method, which accepts proposals on construction methods after the contract is concluded. [Proposal Scope] Limited to cases where changes are necessary to modify the design, construction method, adopt alternative products, standardize parts, etc., in order to achieve the functions and performance of the work object specified in the design documents without lowering them (including increases in post-completion expenses such as maintenance costs). - When determining the successful tenderer, the tender price shall be the amount obtained by adding 10% of the amount entered by the successful tenderer in the electronic bidding system or written on the tender form to that amount (if there is a fraction of less than 1 yen, that fraction shall be rounded down). Therefore, tenderers, regardless of whether they are taxable or exempt from consumption tax and local consumption tax, shall enter or write the amount equivalent to 100/110 of their estimated contract desired amount. - This work is a trial project for the "Procedure for Filing Calculation Disputes" (as per the attached sheet of the tender instructions regarding the trial procedure for filing calculation disputes). If a calculation dispute is filed, it will take some time to compile the verification results, so please be aware of this. Details of calculation dispute filings, answers, and verification results can be confirmed on the "Hiroshima City Electronic Procurement System Portal Site" under "Procurement Information Disclosure System (General Public)" -> "Announcements of Suspension/Correction, Modifications to Tender Related Documents, etc." -> "Construction Work (Mayor's Bureau)" -> "Details of Calculation Dispute Filings, Answers, and Verification Results". Viewing is also available at the construction work担当課 below. - This work is a trial project for securing two days off per week on a "contractor-designated type" basis. If 4 weeks and 8 days off are not achieved, a negotiation for a reduction in the contract price will be held in accordance with the provisions of Article 24 of the "Hiroshima City Construction Work Contract" based on the situation. For details, please check the Hiroshima City website (https://www.city.hiroshima.lg.jp/) under "Information for Businesses" -> "Urban Development" -> "Information and Technical Management of Public Works" -> "To Construction Contractors" -> "Trial of Hiroshima City Two-Day Weekend Work". - Other conditions, etc., are as per the tender instructions and "To Those Participating in Competitive Tenders for Construction Work". Tender security deposit: Exempt Contract security deposit: Required (10% or more of the contract amount) Contracting Division: 1-6-34 Kokutaiji-cho, Naka-ku, Hiroshima City Hiroshima City Finance Bureau, Contract Department, Construction Contract Division (Main Building, 15th Floor) Phone: 082-504-2280 Email: keiyaku-koji@city.hiroshima.lg.jp Fax: 082-504-2612 Construction Work Division: 1-6-34 Kokutaiji-cho, Naka-ku, Hiroshima City Hiroshima City Road Traffic Bureau, Road Department, Street Division (Main Building, 7th Floor) Phone: 082-504-2373 Email: gairoka@city.hiroshima.lg.jp Fax: 082-504-2427 Attachment Attachment: Matters related to comprehensive evaluation - Simplified Type (1) Matters other than price evaluation Evaluation will be based on the following criteria for evaluation categories ① to ⑥, with additional points awarded. ① Corporate technical capabilities Consideration/Ingenuity for methods to reduce the impact on general vehicle and pedestrian traffic during night construction on National Route 2 (excluding the deployment of traffic control guards). Consideration/Ingenuity for noise and vibration measures for nearby residences, etc. during construction. Evaluation Item Evaluation Criteria Points Simple Construction Plan Evaluated from the following perspectives: - Is it feasible to implement? - Is it ingenious? - Can effectiveness be expected? - Is it specific? 8.0-0.0 * If the content described in the submitted technical documents cannot be adhered to due to the contractor's responsibility, 8 points will be deducted from the construction performance evaluation score for each construction challenge.

Data provenance

This notice is sourced from 官公需 (kkj.go.jp) and was originally published on October 23, 2026. Last refreshed 5 days ago. Original language: Japanese. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About 広島県広島市

広島県広島市 has issued 721 procurement notices on BidsFactory, including 91 currently open and 11 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and Water & Sanitation. All notices are published for Japan. Notices are distributed via 官公需 (kkj.go.jp). Most recent publication: October 30, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by 広島県広島市 in Japan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Japan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit 官公需 (kkj.go.jp) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans