Architect / Civil Engineer
This tender has expired
The submission deadline for this tender has passed. It is no longer accepting bids.
About This Opportunity
This is a consulting contract in the humanitarian aid sector. Located in Yemen, Middle East & North Africa, this opportunity is open to firms and consortiums. Proposals must be submitted before July 6, 2026.
Published through ReliefWeb Consultancies, part of the United Nations system, which follows UN procurement standards. UN-funded opportunities are typically open to vendors registered in the UN Global Marketplace for consulting in the humanitarian aid sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Yemen
Architect / Civil Engineer
Organization
CTG (Committed To Good)
Posted
29 Jun 2026
Closing date
6 Jul 2026
Overview of position
Our client is undertaking a project that aims to restore access to critical urban service in selected cities within the Republic of Yemen under Yemen Integrated Urban Services Emergency Project – Phase two (YIUSEP-II) . One of these services is Energy services.
Our client will be responsible for the design and implementation works of PV solar systems and diesel gensets that will increase the targeted facilities’ reliability and service capacity. All of that to be done ensuring highest standards in design, and respect of ‘state of the art’ requirements for aesthetics, safety and sustainability.
To hire professional Consultant Engineer able to provide a variety of engineering services required by the Our client under instructions and directions of the Project Manager, Renewable Energy Specialist and City Engineer. The engineering services desired include, but are not limited to:
Role objectives
The scope is to prepare technical designs, Bill of Quantities (BOQ), and tender documents of solar system and/or genset system solutions to target facilities in accordance with UNOPS guidelines and standards. This will include but not limited to:
• Carry out field visits to target facilities - which may include traveling to various governates- to:
a. Inspect and verify the actual needs;
b. Consult with the facility’s management and administration about the expected needs.
c. Cooperate with electrical engineer to identify the required space for system required components such as Solar PV panels, distribution and control boards, batteries, Diesel generators and fuel tanks.
d. Cooperate with the electrical engineer to Identify possible cable routs and any possible obstacles.
e. Instruments. The engineer shall be familiar with measurement instruments and apparatus required for such assignment including Surveying Equipment such as TOTAL STATIONS.
• Prepare appropriate civil and steek structural designs for target facilities based on proposed energy system – either solar or gensets - and according to site suitability. This will include the following:
a. A full description of the target facility including its location (with GIS coordinates), existing capacity, functionality, provide photograph for the available areas for the required civil and steel structure either rooftop or on ground.
b. AutoCAD drawings for the available areas presenting the south direction and azimuth, illustrating the proposed location and details for the panels, steel structure(s), Battey or Generator rooms.
c. The design shall consider HSSE and aesthetic concerns.
• Provide technical and administrative support throughout all stages of designing processes and respond for any inquiries and modification requests from design review team through UNOPS energy specialist until getting final approval and design certificate.
• Working in coordination with UNOPS Renewable Energy Coordinator, City Engineers and Social Safeguard Officer.
• The consultant will prepare and deliver the required documents in a professional way within specified working period which will include but not limited to:
- Technical assessment report.
- High quality digital photographs.
- AutoCAD detailed design using approved layout templates.
- Sizing Calculation sheets.
- Bill of Quantities (BOQ), including detailed specifications and cost estimation.
• All team’s members shall working side by side and perform all tasks assigned cooperatively.
• Protecting the confidentiality of work.
• Any additional duties required as needed within the scope of the project.
Project Supervising:
The minimum criteria in regard to the duties responsibilities and expectations of the supervising during the implementation phase of the hybrid solar system project in accordance with UNOPS guidelines and standards. This will include but not limited to:
• Responsible for all QC activity on site, performing QC Assessments of work by Technicians.
• Conduct on- site observations to assure conformance with the contract documents regarding work, materials and equipment.
• Arrange and attend field observations where issues of conformity with approved design and specifications arise.
• Make sure that the contractor is adhering the minimum safety and quality policies and procedures.
• Review shop drawings and advise of any significant changes required.
• Issue field instructions for correction of any work that does not conform to the approved contract documents, and if needed, Request change orders when required for review, discussion and approval.
• Review the project file maintained on the site by the Supplier/contractor to ensure that the necessary tests have been performed and the results were satisfactory, issue remedial instructions if the test results were found unsatisfactory.
• Review the project file maintained at the site by the Supplier/contractor to ensure that all the necessary documents, such as, but not limited to, warranties, guarantees, test results, shop drawings, field instructions, reports and change orders, etc. Are filed and kept at a place.
• Review the implementation progress against the most current implementation progress schedule with the Supplier/contractor, evaluate its suggestions and submit recommendations.
• Review the payment requisitions presented by the Supplier/contractor and certify consistency with the implementation progress.
• Conduct an inspection of the development, or a portion of it, on request from the Supplier/contractor for issuance of a substantial completion certificate and develop a punch-list of incomplete items.
• Conduct an inspection of the development for the completion of the punch-list items.
• Inspect the material storage for their conformance with the contract requirements and general suitability, issue written recommendations, if necessary.
• All team’s members shall working side by side and perform all tasks assigned cooperatively.
• Protecting the confidentiality of work.
• Any additional duties required as needed within the scope of the project.
Project reporting
To Project Manager
Key competencies
4. Qualifications and Experience
a. Education
● University degree in Civil engineering.
b. Work Experience
● More than 6 years working experience in project assessment, design supervising and management experience in civil and steel structural design and implementation is essential.
● Experience in the usage of computers and software packages (Structural design software, Autodesk AutoCAD, Microsoft office).
● Very Good Knowledge in written and oral of English and Arabic languages is required.
c. Key Competencies
● Excellent oral and written communication skills.
● Strong interpersonal skills and ability to work as part of a team
Team management
This role has no team management responsibility.
Further information
Qualified female candidates are encouraged to apply for this role.
How to apply
Tayo
Job details
Country
Yemen
Source
CTG (Committed To Good)
Type
Consultancy
Career category
Program/Project Management
Years of experience
5-9 years
Theme
Water Sanitation Hygiene
Share
Share this on Facebook
Share this on X
Post this on LinkedIn
Share job link
How to apply:
Tayo
Data provenance
This notice is sourced from ReliefWeb Consultancies and was originally published on June 29, 2026. Last refreshed 1 day ago. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About CTG (Committed To Good)
CTG (Committed To Good) has issued 52 procurement notices on BidsFactory, including 26 currently open and 0 awarded contracts. Activity concentrates in Humanitarian & Emergency Response, Environment & Climate, and Education & Training. Tenders span 10 countries including Mozambique, South Sudan, and Ukraine. Notices are distributed via ReliefWeb Consultancies. Most recent publication: July 2, 2026.
Frequently asked questions about this tender
How can I submit a bid?
Visit ReliefWeb Consultancies to access the full notice, required documents, and submission instructions provided by the contracting authority.
When does this tender close?
The submission deadline is July 6, 2026. Proposals must be received by the contracting authority before that date.
Who is the contracting authority?
This notice was issued by CTG (Committed To Good) in Yemen. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Consulting contract in the Humanitarian & Emergency Response sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Yemen. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Key Details
Contracting Authority
Companies That Won Similar
Companies with awards in Humanitarian & Emergency Response in Yemen