Renovation Work for Substation Equipment in the Annex Building B of Gunma Vocational Ability Development Promotion Center (PDF 245 KB)
[JEED 8.0]1 BID NOTICE
We hereby announce that the following work will be put out to general competitive bidding.
September 11, 2026
Koji Fujii, Branch Manager and Contracting Officer, Gunma Branch, Japan Organization for Employment of the Elderly, Persons with Disabilities and Job Seekers (JEED)
1. Work to be put out to general competitive bidding
(1) Work Name: Renovation Work for Substation Equipment in the Annex Building B of Gunma Vocational Ability Development Promotion Center
(2) Work Location: 918 Yamana-cho, Takasaki City, Gunma Prefecture
(3) Work Details: As attached
(4) Work Period: From the day after the contract is concluded until June 30, 2027 (including rectification work and complete handover period)
2. Qualifications for participation in competition
All of the following conditions must be met.
(1) Not falling under Article 70 of the Budget, Audit and Accounting Order (hereinafter referred to as "Order").
Minors, persons under guardianship or assistance who have obtained the consent necessary for concluding the contract shall fall under cases of special reasons in the same article.
(2) Not falling under Article 71 of the Order.
(3) As of September 30, 2026 (the deadline for submitting the application for participation in the competition), the applicant must have been certified in grade "A", "B", or "C" for "Electrical Construction" in the general competitive bidding qualifications of the Ministry of Health, Labour and Welfare (excluding joint ventures), and must have its head office, branch office, or business office within Gunma Prefecture in accordance with the Construction Industry Act.
(4) Must be able to assign a site supervisor and a supervising engineer or chief engineer as defined by the Construction Industry Act for the said work.
Site supervisors, supervising engineers, and chief engineers must be directly and permanently employed.
(5) As of September 30, 2026 (the deadline for submitting the application for participation in the competition), the applicant must not be subject to a suspension of bidding by the Ministry of Health, Labour and Welfare or a suspension of qualification for participation in competition by this organization.
(6) Not a person for whom an application for commencement of rehabilitation proceedings has been filed based on the Corporate Rehabilitation Law.
(7) Not a person for whom an application for commencement of civil rehabilitation proceedings has been filed based on the Civil Rehabilitation Law.
(8) Not a contractor for design work, etc. related to the said work, or a person related to such contractor in terms of capital or personnel.
"Persons related in terms of capital or personnel" refers to the following cases:
A. In the case of two companies falling under any of the following:
① Companies that are subsidiaries, etc. (meaning subsidiaries, etc. as defined in Article 2, Item 3-2 of the Companies Act (Act No. 86 of 2005).
② Companies that share the same parent company, etc.
B. In the case of two companies falling under any of the following:
However, case ① shall be excluded if one of the companies (meaning companies as defined in Article 2, Paragraph 3, Item 2 of the Order for Enforcement of the Companies Act (Ministry of Justice Ordinance No. 12 of 2006).
① A person who is an officer of one company and concurrently an officer of the other company.
② A person who is an officer of one company and concurrently a trustee appointed under Article 64, Paragraph 2 of the Civil Rehabilitation Act or Article 67, Paragraph 1 of the Corporate Reorganization Act.
③ A person who is a trustee of one company and concurrently a trustee of the other company.
C. Other cases where it is recognized that the fairness of bidding is hindered.
Cases where a union and its members participate in the same bid, or other cases where a capital or personnel relationship equivalent to A or B above is recognized.
(9) Not falling under "anti-social forces" as defined in Article 2 of the "Rules on Response to Anti-Social Forces" established by this organization (meaning violent groups, members of violent groups, quasi-members of violent groups, companies related to violent groups, racketeers, etc., social movement etc. impostors, specialized intelligence violent groups, etc., and other groups or individuals who seek economic profit by using violence, power, and fraudulent means).
(10) Not a construction company whose management is substantially controlled by members of violent groups, or a similar entity, that has been requested by the police authorities to be excluded from public works ordered by the Ministry of Health, Labour and Welfare, and such state continues.
(11) As of September 30, 2026 (the deadline for submitting the application for participation in the competition), the applicant must not have received any disposition from the supervisory authorities within the past three months due to violations of the Labor Standards Act (Act No. 49 of 1947) and the Industrial Safety and Health Act (Act No. 57 of 1972) or other labor-related laws, must not be currently serving a sentence for a violation of the same laws (or be within the suspension period if suspended), or must not have been arrested, detained, referred to prosecutors, or indicted on suspicion of violating the same laws.
(12) Must be enrolled in social insurance, etc.
(Not a construction contractor who has failed to fulfill the obligation to file notifications as defined below.) Furthermore, if a subcontract is to be concluded for the acceptance of the work, the same shall apply to the subcontractor (including subcontractors of the second tier or lower).
- Obligation to file notifications under Article 48 of the Health Insurance Act (Act No. 70 of 1922).
- Obligation to file notifications under Article 27 of the Employees' Pension Insurance Act (Act No. 115 of 1954).
- Obligation to file notifications under Article 7 of the Employment Insurance Act (Act No. 116 of 1974).
(13) As of September 30, 2026 (the deadline for submitting the application for participation in the competition), the applicant must not be in litigation with this organization or its affiliated companies (companies that have a close relationship, such as exercising or being influenced through personnel, financial, technical, or transactional relationships) (excluding cases where this organization deems it not to hinder participation in the competition).
3. Delivery Method for Bidding Instructions, Drawings, etc.
If an applicant for participation in the competition requests delivery, we will notify them of the password for downloading the bidding instructions, etc. posted on our organization's website, and they can download the bidding instructions, etc. by entering the notified password.
(1) Application Method (To):
Email (gunma-keiri@jeed.go.jp)
(2) Subject: Request for delivery of bidding instructions regarding "Renovation Work for Substation Equipment in the Annex Building B of Gunma Vocational Ability Development Promotion Center"
(3) Email Body Content: Company Name, Contact Person Name, and Phone Number
[JEED 8.0]3
(4) Delivery Period: From the date of this announcement until 16:00 on September 30, 2026 (deadline for submitting the application for participation in the competition) (excluding December 29 - January 3 and Saturdays, Sundays, and public holidays)
4. Method of Application for Participation in Competition, etc.
(1) Method of Submission of Application for Participation in Competition:
After receiving the bidding instructions, drawings, etc., submit them by registered mail (ordinary or express), courier service, in person, or by email by the submission deadline below.
(a) Submission Deadline: 16:00 on September 30, 2026 (must arrive by this time)
(b) Submission Destination: Contact point in Section 10 below
(2) Examination of Qualifications for Participation in Competition:
After the deadline for applications for participation in competition, this organization will examine the qualifications of the applicants.
Applicants who do not meet the qualifications will be notified by October 2, 2026 (no notification will be sent to those who meet the qualifications).
Furthermore, even if an applicant is deemed to meet the qualifications, if it is subsequently confirmed that they do not meet the qualification requirements in Section 2 above, their qualifications will be revoked.
(3) Site Inspection:
Applicants who are deemed to meet the qualifications will be permitted to conduct a site inspection as described in Section 1(2) above.
5. Bidding Method, etc. (Mail Bidding)
(1) Method of Submission of Bid:
Submit by registered mail (ordinary or express), courier service, or in person by the submission deadline below.
(a) Submission Deadline: 16:00 on October 20, 2026 (must arrive by this time)
(b) Submission Destination: Contact point in Section 10 below
(2) Bid Opening Date and Time and Location:
Date and Time: October 23, 2026, 14:00
Location: Conference Room, Gunma Branch, Japan Organization for Employment of the Elderly, Persons with Disabilities and Job Seekers (JEED), 918 Yamana-cho, Takasaki City, Gunma Prefecture, 370-1213
TEL: 027-347-3333
(3) Determination of Successful Bidder:
The successful bidder shall be the one who submits the lowest valid bid within the limit of the estimated price prepared in accordance with Article 56 of the Accounting Regulations of this organization.
Furthermore, the successful bid price shall be the bid amount plus an amount equivalent to 10% of the bid amount.
(4) Other:
Details of the bidding method, etc., are provided in the bidding instructions.
6. Preparation of Contract:
The construction contract shall be prepared using the draft contract provided by the contracting officer.
7. Bid Security and Contract Security:
(1) Bid security is waived.
(2) The successful bidder must provide one of the following guarantees in lieu of paying the contract security by the date of submission of the contract.
The amount of the guarantee or insurance shall be not less than 1/10 of the contract price.
However, if the successful bidder has undergone an investigation (so-called low-bid price investigation) to determine whether the contract can be performed in accordance with the bid amount, the amount of the guarantee or insurance shall be not less than 3/10 of the contract price.
① Guarantee from a bank, financial institution recognized as reliable by the organization, or a prepayment guarantee company.
② Guarantee by a performance bond insurance contract.
③ Conclusion of a performance guarantee insurance contract and deposit of the insurance policy.
8. Objection Filing:
Objections to the determination of non-qualification for participation in the competition by this organization must be submitted in writing to the contact point below, to arrive within 3 days from the date of notification of the examination results (excluding the notification date, December 29 - January 3, and Saturdays, Sundays, and public holidays).
Also, before and after sending the document, be sure to contact us by phone within the reception hours below.
Furthermore, objections filed thereafter will not be accepted, and we cannot be held responsible even if there is negligence in our procedures.
9. Other:
Regarding contracts entered into by independent administrative agencies, as stated in the "Basic Policy for Review of Affairs and Operations of Independent Administrative Agencies" (Decision of the Ministerial Meeting on December 7, 2010), when contracting with a corporation that has a certain relationship with the independent administrative agency, efforts such as disclosing information on re-employment status with that corporation and transaction status with that corporation are being promoted.
Based on this, we will publish information related to the relationship with our organization on our organization's website. Therefore, we ask for your understanding and cooperation in providing the necessary information to us and agreeing to the publication of the information, and in submitting a bid or application, or concluding a contract.
Furthermore, submission of a bid or application for a project, or conclusion of a contract, will be deemed as consent.
10. Contact Information:
General Affairs Section, Gunma Branch, Japan Organization for Employment of the Elderly, Persons with Disabilities and Job Seekers (JEED), 918 Yamana-cho, Takasaki City, Gunma Prefecture, 370-1213
TEL: 027-347-3333
FAX: 027-347-3711
Email: gunma-keiri@jeed.go.jp
Reception Hours: 9:00 to 16:30
Above
[JEED 8.0]5
(Attachment to Bid Notice)
Work Details
1. Work Name: Renovation Work for Substation Equipment in the Annex Building B of Gunma Vocational Ability Development Promotion Center
2. Outline of Work Plan: This work involves replacing two aging transformers and associated consumables installed in the substation equipment of the Annex Building B of the Gunma Vocational Ability Development Promotion Center.
3. Existing Transformers:
(1) Three-phase transformer: 1 unit
Manufacturer: Mitsubishi Electric
Purpose: Power
Year of Manufacture: 1989
Model: RA-T
(2) Single-phase transformer: 1 unit
Manufacturer: Mitsubishi Electric
Purpose: Lighting
Year of Manufacture: 1989
Model: SF-T4
4. Planned Transformers:
New transformers must comply with the Top Runner Standard (Third Judgment Standard) for fiscal year 2026.
5. Work Location: Annex Building B, Electrical Room, Gunma Vocational Ability Development Promotion Center (918 Yamana-cho, Takasaki City, Gunma Prefecture), 45.83 m²
6. Work Period: Until the end of June 2027
7. Conditions during Work Period at Facility:
(1) Ensure sufficient safety for center users and staff.
(2) Take measures to ensure safety during the transport of transformers and construction equipment.
(3) Construction is expected to take place on Saturdays, Sundays, and public holidays, as vocational training is conducted on weekdays.
Specific construction dates will be determined through consultation.
(4) Power outages during the construction period: Plan power outage work in consultation with the center and related parties, and coordinate countermeasures in advance.
Monitor for a certain period after power restoration to check for abnormalities.
Power restoration work after opening the cubicle must be carried out with the presence of an electrical chief engineer.
[JEED 8.0]6
(5) Prepare construction records and test reports and submit them as completion documents.
(6) Other matters not described herein shall be determined in consultation with the center.
8. Asbestos Survey:
No sprayed asbestos was used in the surveys conducted in 2005 and 2008. However, if an asbestos survey is conducted before the start of construction in consultation with the contractor for design and supervision of this work, the results of that survey will be used.
9. PCB Survey:
No trace amounts of PCBs were detected in the trace PCB test conducted in 2012. However, if a test is conducted before the start of construction in consultation with the contractor for design and supervision of this work, the results of that test will be used.