Construction of two multi-family residential buildings with site development and technical infrastructure at Chopina Street in Tomaszów Mazowiecki.
This tender has been awarded
Awarded to "EKO - INVEST" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ — €43,609,945
About This Opportunity
TranslatedConstruction of two multi-family residential buildings, including site development and technical infrastructure, at ul. Chopina in Tomaszów Mazowiecki.
This is a works contract in the construction and civil works sector. Located in Poland, Europe, this opportunity is open to firms and consortiums.
Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Auto-translated from Polish2. The subject of the order are construction works consisting in particular of: 1) site preparation for the construction of two multi-family residential buildings; 2) construction of two multi-family residential buildings with technical infrastructure, where a) building no. 1 (B1) is a basement building, five-story with a flat roof, with a so-called high ground floor; The staircase is equipped with a passenger elevator adapted for the transport of disabled people; in the basement, a garage hall, technical rooms and a bicycle room have been designed; the building structure is skeletal: reinforced concrete frames and beams, filigree type reinforced concrete ceilings, direct foundation on a foundation slab; traditional facade materials are planned; building facade insulation with polystyrene - light wet method. A fine-grained plaster with a sand structure, in muted colors, has been used; part of the walls are covered with flexible clinker tiles; Balcony railings in an aluminum system are planned, mounted to the front of the balcony slab, filled with safety, tempered glass; Building volume (gross): approx. 21,800 m3; ; Usable area of the garage hall approx. 830 m²; b) building no. 1 (B1) is a basement building, five-story with a flat roof, with a so-called high ground floor; The staircase is equipped with a passenger elevator adapted for the transport of disabled people; in the basement, a garage hall, technical rooms and a bicycle room have been designed; the building structure is skeletal: reinforced concrete frames and beams, filigree type reinforced concrete ceilings, direct foundation on a foundation slab; traditional facade materials are planned; building facade insulation with polystyrene - light wet method. A fine-grained plaster with a sand structure, in muted colors, has been used; part of the walls are covered with flexible clinker tiles; Balcony railings in an aluminum system are planned, mounted to the front of the balcony slab, filled with safety, tempered glass; Building volume (gross): approx. 21,800 m3; ; Usable area of the garage hall approx. 830 m²; 4) allocation of a total of 150 one-, two-, and three-room apartments (75 apartments in each building); 5) execution of all necessary utility connections ensuring the proper functioning of the facilities and obtaining an occupancy permit. This applies in particular to connections: water, sewage, electricity, gas and telecommunications – to the extent necessary to achieve the investment goal, regardless of the degree of their inclusion in the design documentation or bill of quantities. 6) execution of internal water, sanitary sewage and rainwater sewage installations; 7) execution of natural gas installations, 8) installation of electrical and telecommunications systems ensuring use in accordance with their intended purpose, 9) construction of internal roads and parking spaces, as well as sidewalks and other elements of site development. 10) tree felling; 11) execution of green plantings; 12) finishing and equipping of apartments and common areas. 3. The value of the annual indicator of demand for non-renewable primary energy EP in the buildings created within the project may not exceed the value of 52 kWh (m2.year), which the Beneficiary of funds has committed to achieve, and which has obliged the Investor to ensure that the project does not cause serious harm to the environmental objectives defined in art. 9 of Regulation 2020/852, in accordance with art. 17 of this regulation (the values intended to be achieved are included in Annex no. 1 to the SWZ – Projected energy performance of the building). 4. The Contractor is obliged to carry out the works in accordance with the DNSH principle ("Do No Significant Harm"), i.e. not to harm the environmental objectives of the European Union defined in art. 17 of Regulation (EU) 2020/852, in particular by: - limiting greenhouse gas emissions, - rational management of resources...
Data provenance
This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on April 16, 2026. Last refreshed 37 days ago. Original language: Polish. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About SIM KZN ŁÓDZKIE CENTRUM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
SIM KZN ŁÓDZKIE CENTRUM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ has issued 3 procurement notices on BidsFactory, including 0 currently open and 2 awarded contracts. Activity concentrates in Construction & Civil Works and Urban Development & Housing. All notices are published for Poland. Notices are distributed via TED - Tenders Electronic Daily (EU). Most recent publication: April 16, 2026.
Frequently asked questions about this tender
Where will the contract be performed?
The contract is for delivery in Poland. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Is this tender still open?
No — the contract has already been awarded to "EKO - INVEST" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ. The award notice is archived on BidsFactory for transparency and market intelligence.
Who is the contracting authority?
This notice was issued by SIM KZN ŁÓDZKIE CENTRUM SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ in Poland. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
How much was the contract awarded for?
"EKO - INVEST" SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ was awarded the contract for €43,609,945. The figure reflects the value disclosed by the contracting authority in the award notice.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Contracting Authority
Contact
Companies That Won Similar
Companies with awards in Construction & Civil Works in Poland