Inquiries (Regarding Procured Item)
12-3 Tono-machi, Tomioka, Anan City
Inquiries (Regarding Bid Execution)
12-3 Tono-machi, Tomioka, Anan City
Anan City Phone Number: 0884-22-1595 Construction Department, Civil Engineering Division
- Times indicated in this bid information are in 24-hour format.
Submit by 11:30 AM on Thursday, November 5, Reiwa 8.
- Bidders who have not attended the site explanation meeting cannot participate in the bid. However, this does not apply if a site explanation meeting is not held.
- This designation notice may be canceled depending on the circumstances.
Dietary Resolution: Not Required
Contract Guarantee: Exempt
Breakdown Submission: Required
Design Amount (Excluding Tax): 1,210,000 yen
Bid Form Submission Period:
From October 30, Reiwa 8, to November 4, Reiwa 8
Design Document/Drawing Inspection Location:
Anan City Website
Design Document/Drawing Inspection Period:
From October 26, Reiwa 8, to November 4, Reiwa 8
Designated Contractor:
Site Explanation Meeting Date and Time:
From 3:00 PM on Wednesday, November 4, Reiwa 8, to November 9, Reiwa 9 (Monday)
Construction Name:
C Breakwater Beacon Light Renewal Work within Ogata Fishing Port
Construction Location:
Ogata-cho, Anan City
Construction Period:
From the day after contract conclusion to February 9, Reiwa 9
Bid Opening Location:
Anan City Hall, 3rd Floor, Room 307
Bid Security:
Applicable Minimum Limit Price System:
Bid Information:
Site Explanation Meeting Location:
Bid Opening Date and Time:
From 8:30 AM on Wednesday, October 26, Reiwa 8, to November 4, Reiwa 8
Remarks:
- This bid is an electronic bidding project utilizing the Tokushima Prefecture Electronic Bidding System.
- This bid will be executed and the contract concluded based on the "Bid Participant Precautions," "Anan City Contract Regulations," "Anan City Public Works Standard Contract Agreement," and "Anan City Electronic Bidding System Operation Standards," etc.
- If there are no bids, the bidding will end.
- The successful bid will be determined by adding 10% of the bid amount to the bid amount (if there are fractions of less than 1 yen, the fractional amount will be rounded down). Therefore, bidders must write in the bid form an amount equivalent to 100/110 of the estimated contract amount, regardless of whether they are taxable or exempt businesses for consumption tax and local consumption tax.
- This bid is limited to one execution. The successful bid will be determined from bids within the limit of the estimated price that are valid.
- Delegation of bidding to other construction-related companies is not permitted.
- If you wish to decline this designation, please submit a "Declination Notice."
- Please review the design documents, etc., listed in the designation notice and submit the bid form and breakdown.
Supplementary Explanation of Design Documents
Construction Department, Civil Engineering Division
1. Regarding Inquiries and Responses for Design Documents
(1) Inquiries regarding design documents will only be accepted in writing (FAX/email).
(2) After submission, please contact the Civil Engineering Division by phone to confirm submission.
(3) The deadline for submitting inquiry forms is 5:00 PM on Tuesday, October 27, Reiwa 8.
Construction Department, Civil Engineering Division
Address: 12-3 Tono-machi, Tomioka, Anan City
Contact: 0884-22-1595
FAX: 0884-22-5211
Email: doboku@anan.i-tokushima.jp
(4) A document containing the answers to the inquiries will be made available for viewing as follows (only if inquiries are received).
① Viewing Period: From Thursday, October 29, Reiwa 8, until the end of the viewing period.
② Viewing Location: Posted on the Anan City website.
2. Coverage of Statutory Accident Insurance for Workers (Outside of Statutory)
(1) The contractor shall enroll in statutory accident insurance for workers (outside of statutory) with an insurance period that covers the contract period of this work.
(2) At the time of the initial contract, submit proof of enrollment in statutory accident insurance for workers (outside of statutory) (e.g., copy of enrollment certificate).
(3) If the contract period is extended and the insurance coverage period for statutory accident insurance for workers (outside of statutory) is exceeded, the contractor shall promptly change the insurance period or enter into an additional insurance contract based on the modified contract period, and submit proof of enrollment in the modified or additionally contracted statutory accident insurance for workers (outside of statutory) (e.g., copy of enrollment certificate).
* Regarding statutory accident insurance for workers (outside of statutory): This refers to a contract in which an insurance company pays insurance money to the employer for the amount that the employer pays to the employee or their bereaved family in excess of the benefits provided by statutory accident insurance for workers, in cases where employees suffer bodily injuries (including permanent disability and death) due to work-related accidents.
3. Submission of "Construction Industry Retirement Allowance Mutual Aid System Premium Payment Receipt"
Upon concluding the construction contract, the contractor shall submit the "Construction Industry Retirement Allowance Mutual Aid System Premium Payment Receipt" to the employer. This shall also apply when purchasing additional construction industry retirement allowance mutual aid system stamps, etc.
Furthermore, if enrolled in the Construction Industry Retirement Allowance Mutual Aid System, a separately designated sign (sticker) must be displayed in a visible location.
4. Application of the Prefecture's "Manual for Installation of Site Representatives and Chief Engineers, etc."
The contractor shall handle matters related to site representatives and chief engineers, etc.