Tenders/Chief Engineer for the new PIU under the CHCS
Closed🇹🇯TajikistanConsulting

Chief Engineer for the new PIU under the CHCS

This tender is closed

The submission deadline for this tender has passed. It is no longer accepting bids.

Browse open Architecture & Engineering Services tenders in Tajikistan

About This Opportunity

Request for Expression of Interest | Project: Tajikistan Water Supply and Sanitation Investment Project | Method: Individual Consultant Selection | Ref: WSIP-AF-CHCS-010

This is a consulting contract in the architecture and engineering, health and medical services and urban development and housing sectors. Located in Tajikistan, Central Asia, this opportunity is open to individual consultants.

Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the architecture and engineering sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage.

Description

Project: Tajikistan Water Supply and Sanitation Investment Project

SPECIAL NOTICE FOR SELECTION OF CHIEF ENGINEER FOR WSIP-1-AF.

Organization: Committee for Housing and Communal Services (CHCS) “Project Implementation Group” in the Republic of Tajikistan.

Project: Water Supply and Sanitation Investment Project (Phase-1) Additional Financing (AF)

Position: Chief Engineer

Country: Republic of Tajikistan.

Grant No: E 0950- TJ

Released: May 15th, 2026.

  1. Introduction

The Water Supply and Sanitation Investment Project (WSIP-1), approved by the World Bank’s Board of Executive Directors on June 23, 2022, is implemented by the Ministry of Energy and Water Resources of the Republic of Tajikistan and the State Unitary Enterprise “Khojagii Manziliyu Kommunali” (SUE KMK). The Financing Agreement between the Republic of Tajikistan and the International Development Association (IDA), along with the Project Agreement with the Project Implementation Group (PIU) and SUE KMK, was signed on October 3, 2022.

WSIP-1 represents the first phase of the Water Supply and Sanitation Sector Investment Program and aims to improve access to safe and reliable water supply services in selected rural and peri-urban areas of the southwestern Khatlon region, taking into account climate-related risks. The project targets underserved areas characterized by high rural population density, low service coverage, reliance on unimproved water sources, and limited prior investment.

The project will finance the rehabilitation and construction of water supply infrastructure, including expansion within areas served by the Vakhsh transmission pipeline and selected villages in Vose District, while strengthening the performance and sustainability of SUE KMK service structures.

Additional financing from an EU Grant will support scaling up of activities and expansion of services to prioritized settlements in Vakhsh, Vose, Balhi, and Dusti districts. In total, the project is expected to improve water supply services in 126 villages, benefiting around 280,000 people, while also supporting institutional development of the Committee of Housing and Communal Services (CHCS).

The project will be implemented by the new created Project Implementation Group (PIU) under the Committee for Housing and Communal Services (CHCS) in the Republic of Tajikistan).

Committee established a new Project implementation unit in the field of drinking water supply and wastewater management, responsible for Component 1 activities under the AF. Capacity of the CHCS Group will be complemented with external technical assistance for effective project implementation.

Component 1 – Institutional Strengthening and Capacity Building
This component supports institutional strengthening and capacity building of water sector institutions at national, regional, and local levels to ensure sustainable service delivery in the project areas. It includes activities aimed at enhancing the capacity of the Committee of Housing and Communal Services (CHCS), such as the construction of a training center and a utility office in Vakhsh, as well as provision of technical assistance to develop internal regulations, operational procedures, and tools to support SUE KMK and water utilities.

The PIU under CHCS will have overall responsibility for consolidation of financial reports, including IFRs, project progress reporting and monitoring, compliance with environmental, social, fiduciary requirements in line with the Project Operation Manual (POM).

  1. Objective

The objective of this assignment is to select a National Chief Engineer who will work under the guidance and supervision of the Director of PIU CHCS.

  1. Duration of the Contract

The initial contract duration is 6 months with possible extension depending on performance indicators. During this period the Chief Engineer must report directly to the Director of PIU CHCS.

  1. Required qualifications​

The Chief engineer should preferably have experience in implementing similar projects financed by the World Bank, Asian Development Bank, Islamic Development Bank, EU, etc. He/She should have a good understanding of rural communal infrastructure issues, as well as strong knowledge and over 7 years of practical experience in the following areas:
(a) Design and construction of civil engineering of public building as well as other infrastructure facilities;
(b) Management and supervision of construction contract implementation.

Minimum requirements

  • A higher education degree in civil engineering and technical education (water supply, sanitary engineering, engineering, construction or related fields).
  • At least 5 years of technical experience, including experience in design or project control, experience in the water supply system would be an advantage;
  • Knowledge of international design standards and IFI requirements including national building codes.
  • Good knowledge of Tajik and Russian languages, knowledge of English is an advantage;
  • Computer literacy, knowledge of Word, Excel, Microsoft Project, ArhiCard AutoCard and etc.
  • Good knowledge of local requirements and procedures for supervision of construction works, as well as the principles of keeping relevant documentation on them;

Interested candidates should submit the following documents:

  • Curriculum Vitae (CV) detailing education, experience, and qualifications
  • Copies of academic diplomas and professional certificates (engineering degree, licenses, etc.)

Follow the link to view the detailed Terms of Reference (ToR):

https://docs.google.com/document/d/1SBs9-38ltWvKZY_6jf-DMRUB02NE1E1i/edit?usp=sharing&ouid=118208247520916194226&rtpof=true&sd=true

Deadline for submitting documents: 02 June 2026, until 16:00pm.

Submission of documents:

  • In paper form: 56 N. Karabaeva Street, 2nd floor, Dushanbe.
  • By e-mail: chcspiu@gmail.com , addressed to WSIP-1 AF Project Director, Mr. Islomzoda Mummadjon.

Based on the review of submitted CVs, shortlisted candidates will be notified within 10 working days after the application deadline. Only shortlisted candidates will be invited for an interview (if applicable) and assessed accordingly.

Data provenance

This notice is sourced from WB - World Bank and was originally published on May 21, 2026. Last refreshed 4 days ago. Reference: OP00446382. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Tajikistan Water Supply and Sanitation Investment Project

Tajikistan Water Supply and Sanitation Investment Project has issued 32 procurement notices on BidsFactory, including 0 currently open and 20 awarded contracts. Activity concentrates in Water & Sanitation, Construction & Civil Works, and Information & Communication Technology. All notices are published for Tajikistan. Notices are distributed via WB - World Bank. Most recent publication: October 14, 2026.

Frequently asked questions about this tender

How can I submit a bid?

Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00446382 when communicating with the contracting authority.

Is this tender still accepting bids?

No — the submission deadline has passed. The notice is archived for reference. To find open opportunities, use the filters above to browse current tenders.

Who is the contracting authority?

This notice was issued by Tajikistan Water Supply and Sanitation Investment Project in Tajikistan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Consulting contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Tajikistan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Contract Type
Consulting
Eligibility
Individual Consultants
Language
English
Reference
OP00446382

Source

w
WB - World Bank
Multilateral

Contracting Authority

Open expert positions in Tajikistan

Aninver Development Partners is building its team for these assignments. Send your CV in two minutes.

See all consultancy jobs →

Similar Open Tenders in Tajikistan

Open🇹🇯Tajikistan

[tg] Current repair of roofs of buildings of the Gissar Observatory of the Institute of Astrophysics and repair of the corridor and office in the Presidium of the National Academy of Sciences of Tajikistan

🏗️ Construction & Civil Works📐 Architecture & Engineering Services
Deadline:Premium
Open🇹🇯Tajikistan

[tg] Construction of a 35kV power transmission line in the direction of PS “Gidrouzel”

⚡ Energy & Power🏗️ Construction & Civil Works
Deadline:Premium
Open🇹🇯Tajikistan

[tg] Repair and asphalting of the road on General Khobilov and Zebi Tokhirova streets in the B. Gafurov district (5th stage: installation of asphalt concrete pavement with a layer thickness of 5 cm and an area of 3570 m2)

🚚 Transport & Logistics📐 Architecture & Engineering Services
Deadline:Premium
Open🇹🇯Tajikistan

Construction of a new building for the state institution "Children's Hospital" in the city of Penjikent, Tereshkova Street (Continuation of construction work: first-floor stairs, brick walls, columns, beams, and second-level reinforced concrete floor slab).

🏗️ Construction & Civil Works🏥 Health & Medical
Deadline:Premium
Open🇹🇯Tajikistan

Reconstruction of the heating supply line, landscaping works, and continuation of building construction at the State Institution "Center for Heart Diseases and Cardiovascular Surgery of the Sughd Region".

🏗️ Construction & Civil Works🏥 Health & Medical
Deadline:Premium
Open🇹🇯Tajikistan

Current Repair of the State Institution "Bokhtar City Medical College

🏗️ Construction & Civil Works🏥 Health & Medical
Deadline:Premium