Design, Supply, Installation, and Maintenance of Solar Photovoltaic Systems for the Electrification of 164 Integrated Health Centers (CSI) in the Regions of Agadez, Diffa, Dosso, Maradi, Tahoua, Tillabéry, and Zinder
About This Opportunity
TranslatedThis contract award is for the Niger Accelerating Electricity Access Project (Haské), funded by IDA loans. The project involves the design, supply, installation, and maintenance of solar photovoltaic systems to electrify 164 Integrated Health Centers (CSI) across the regions of Agadez, Diffa, Dosso, Maradi, Tahoua, Tillabéry, and Zinder. The procurement method was a Request for Bids (RFB). The contract duration is 10 months. The awarded bidder is GROUPEMENT KYA ENERGY / OUBA ENERGY, located in Agoè-Nyivé, Togo. This initiative is critical for enhancing healthcare services by providing reliable and sustainable electricity to health facilities, thereby improving their operational capabilities and the quality of care delivered to the population in these remote areas.
This is a works contract in the health and medical services, energy and power and finance and banking sectors, with a focus on Renewable Energy. Located in Niger, Africa, this opportunity is open to firms and consortiums.
Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for civil works in the health and medical services sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Original language: FrenchContract Award
Project:P174034-Niger Accelerating Electricity Access Project (Haské)
Loan/Credit/TF Info:IDA-70130; IDA-D9460
Bid/Contract Reference No:NE-ANERSOL-503673-CW-RFB
Procurement Method:RFB-Request for Bids
Scope of Contract:Conception, Fourniture, Installation et Maintenance de Systèmes Solaires Photovoltaïques pour l'électrification de 164 Centres de Santé Intégré (CSI) dans les régions d'Agadez, Diffa, Dosso, Maradi...
Notice Version No:0
(YYYY/MM/DD)
2025/11/21
10 Month(s)
08 BP 81101 AGOE-NYIVE, LOGOPE Tél. : +228 70 45 34 81 /91 50 21 49, info@kya-energy.com
Country: Niger
XOF
Evaluated Bid Price
XOF 360000000
XOF 360000000
Data provenance
This notice is sourced from WB - World Bank and was originally published on March 25, 2026. Last refreshed 1 day ago. Reference: OP00434590. Original language: French. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About Niger Accelerating Electricity Access Project (Haské)
Niger Accelerating Electricity Access Project (Haské) has issued 30 procurement notices on BidsFactory, including 0 currently open and 30 awarded contracts. Activity concentrates in Energy & Power, Finance & Banking, and Health & Medical. All notices are published for Niger. Notices are distributed via WB - World Bank. Most recent publication: May 14, 2026.
Frequently asked questions about this tender
What type of contract is this?
This is a Works contract in the Health & Medical sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
How much was the contract awarded for?
GROUPEMENT KYA ENERGY / OUBA ENERGY was awarded the contract for $360,000,000. The figure reflects the value disclosed by the contracting authority in the award notice.
Where will the contract be performed?
The contract is for delivery in Niger. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00434590 when communicating with the contracting authority.
Is this tender still open?
No — the contract has already been awarded to GROUPEMENT KYA ENERGY / OUBA ENERGY. The award notice is archived on BidsFactory for transparency and market intelligence.
Who is the contracting authority?
This notice was issued by Niger Accelerating Electricity Access Project (Haské) in Niger. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.