Construction of 2 Nos. of Slab Culvert Over Maini River and 1 No. of Slab Culvert Over Kishe River, Ward No. 5
Description
This procurement notice, published on the nepal_bolpatra platform for Nepal, concerns the construction of vital river crossing infrastructure. Specifically, the tender calls for the construction of two slab culverts over the Maini River and one slab culvert over the Kishe River, located within Ward No.
5. This project is crucial for improving local connectivity and transportation networks. Prospective bidders are invited to submit proposals detailing their approach to constructing these essential civil engineering structures. Requirements typically include expertise in hydraulic engineering, concrete works, and foundation design suitable for river environments. Contractors will be responsible for providing all necessary construction materials, equipment, and qualified personnel. The scope of work will encompass site preparation, excavation, formwork, reinforcement, concrete pouring, and finishing, ensuring the durability and functionality of the culverts. Compliance with all relevant engineering standards, environmental impact assessments, and safety regulations will be mandatory. The contracting authority seeks a competent construction firm capable of delivering these infrastructure projects efficiently and to a high standard of quality, ensuring long-term serviceability and minimal disruption to river flow.
About This Opportunity
This is a works contract in the construction and civil works sector. Located in Nepal, Asia, this opportunity is open to firms and consortiums. Proposals must be submitted before June 3, 2026.
Published through nepal_bolpatra, a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.