Default lot
About This Opportunity
Romania contract award (energy & power): Default lot. By Biblioteca Nationala a Romaniei. Awarded to TINMAR ENERGY (RON 3.0M, May 2026).
This is a supplies contract in the energy and power sector. Located in Romania, Europe, this opportunity is open to firms and consortiums, with an estimated budget of EUR 7.
Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for the supply of goods in the energy and power sector. Supply contracts typically require bidders to demonstrate product compliance with technical specifications, delivery capacity, and relevant certifications. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Auto-translated from roEstimated quantities Framework agreement for a minimum period of 1 (one) month and a maximum of 12 (twelve) months: - consumption locations of the National Library of Romania in Bucharest, B-dul Unirii, No. 22, Sector 3, the total quantity of electricity consumed can range between: minimum 475.00 MWh (1 month) and maximum 4,700.00 MWh (12 months), according to Annex 1 of this Specification; - consumption locations of the National Library of Romania in Bucharest, Batthyaneum Library Branch in Alba Iulia, str. Gabriel Bethlen, no.1, Alba county, the total quantity of electricity consumed can range between: minimum 1.00 MWh (1 month) and maximum 10.80 MWh (12 months), according to Annex 1 of this Specification; - consumption location of the National Library of Romania in Bucharest, str. Biserica Amzei, no. 4-7, sector 1, the total quantity of electricity consumed can range between: minimum 0.10 MWh (1 month) and maximum 1.20 MWh (12 months), according to Annex 1 of this Specification; - consumption location of the National Library of Romania in Craiova, str. Mihail Kogălniceanu, no. 21, Dolj county, the total quantity of electricity consumed can range between: minimum 2.00 MWh (1 month) and maximum 17.10 MWh (12 months), according to Annex 1 of this Specification; Estimated quantities for Subsequent Contracts for a minimum period of 1 (one) month and a maximum of 6 (six) months - consumption locations of the National Library of Romania in Bucharest, B-dul Unirii, No. 22, Sector 3, the total quantity of electricity consumed can range between: minimum 475.00 MWh (1 month) and maximum 2,250.00 MWh (6 months), according to Annex 1 of this Specification; - consumption locations of the National Library of Romania in Bucharest, Batthyaneum Library Branch in Alba Iulia, str. Gabriel Bethlen, no.1, Alba county, the total quantity of electricity consumed can range between: minimum 1.00 MWh (1 month) and maximum 5.40 MWh (6 months), according to Annex 1 of this Specification; - consumption location of the National Library of Romania in Bucharest, str. Biserica Amzei, no. 4-7, sector 1, the total quantity of electricity consumed can range between: minimum 0.10 MWh (1 month) and maximum 0.60 MWh (6 months), according to Annex 1 of this Specification; - consumption location of the National Library of Romania in Craiova, str. Mihail Kogălniceanu, no. 21, Dolj county, the total quantity of electricity consumed can range between: minimum 2.00 MWh (1 month) and maximum 9.20 MWh (6 months), according to Annex 1 of this Specification.
Data provenance
This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on May 13, 2026. Last refreshed 34 days ago. Original language: ro. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About Biblioteca Nationala a Romaniei
Biblioteca Nationala a Romaniei has issued 19 procurement notices on BidsFactory, including 1 currently open and 18 awarded contracts. Activity concentrates in Architecture & Engineering Services, Governance & Public Administration, and Energy & Power. All notices are published for Romania. Notices are distributed via TED - Tenders Electronic Daily (EU) and SEAP Romania. Most recent publication: June 17, 2026.
Frequently asked questions about this tender
How can I submit a bid?
Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Is this tender still open?
No — the contract has already been awarded to TINMAR ENERGY. The award notice is archived on BidsFactory for transparency and market intelligence.
Who is the contracting authority?
This notice was issued by Biblioteca Nationala a Romaniei in Romania. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Supplies contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
How much was the contract awarded for?
TINMAR ENERGY was awarded the contract for €2,984,498. The figure reflects the value disclosed by the contracting authority in the award notice.
Where will the contract be performed?
The contract is for delivery in Romania. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.