About This Opportunity

Translated

This tender concerns the implementation of the investment objective "Overhead Power Line (LEA) 400kV Suceava-Bălți on the project section within Romania's territory." The scope of work includes comprehensive design services, such as adapting the technical project to the proposed technical solution, developing projects for the coexistence of the new energy infrastructure with existing public and private infrastructure it intersects, and preparing detailed execution drawings. Additionally, the project involves the construction of a cross-border 400 kV overhead power line connecting Suceava (Romania) and Bălți (Republic of Moldova). The total length of this line is approximately 142 km, with roughly 93 km situated within Romania. A key component of the project is the construction of a 400 kV line bay within the existing 400/220/110/20 kV Suceava electrical substation in Suceava County. The project also requires modifications to third-party installations at their interface points. This construction is coordinated with the corresponding section of the 400 kV overhead line in the Republic of Moldova, extending from the Bălți substation to the Romanian-Moldovan border on the Prut River. The overarching goal is to accelerate the integration of renewable energy sources in Romania, ensure optimal energy production evacuation, and facilitate cross-border electricity exchanges by enhancing the national electricity transmission capacity. The specific objectives include the construction of the aforementioned cross-border 400 kV line and the 400 kV line bay at the Suceava substation. These objectives are complemented by the construction of a 400/330 kV Bălți system substation near the existing Bălți substation. The contract duration for execution is 52 months.

This is a works contract in the energy and power, construction and civil works and architecture and engineering sectors, with a focus on Transmission Distribution, Buildings and Project Management. Located in Romania, Europe, this opportunity is open to firms and consortiums.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the energy and power sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.

Description

Auto-translated from ro

The realization of the investment objective “400kV Overhead Power Line Suceava-Bălți on the project section within Romania's territory” involves the following activities: • carrying out design services: adapting the technical project in correlation with the technical proposal, carrying out projects regarding the coexistence between the new energy objective and the public and private infrastructure it intersects, elaborating execution details; • construction of a cross-border overhead power line (LEA) 400 kV, between Suceava (Romania) and Bălți (Republic of Moldova), with a total length of approx. 142 km, of which approximately 93 km are on Romanian territory; • construction of a 400kV line bay in the 400/220/110/20 kV Suceava transformer substation, Suceava county (operational substation); • carrying out modifications in third-party installations at their interface. The construction is correlated with the project part concerning the 400kV LEA on the territory of the Republic of Moldova from the Bălți substation to the border between Romania and the Republic of Moldova on the Prut River. The general objective of the project is therefore to accelerate the integration of renewable energy sources in Romania, ensure the optimal evacuation of energy production, and facilitate cross-border energy exchanges by constructing 400 kV overhead power lines to increase the national electricity transmission capacity. The specific objectives of the project are: • construction of a cross-border overhead power line, LEA 400 kV, between Suceava (Romania) and Bălți (Republic of Moldova), with a total length of approx. 142 km, of which approximately 93 km are on Romanian territory; • construction of a 400kV line bay in the 400/220/110/20 kV Suceava transformer substation, Suceava county (operational substation); These objectives are combined with the construction of a 400/330kV Bălți system substation, near the existing Bălți substation. The contract realization duration is 52 months and consists of: - Design duration: 4 months from the date of issuance of the Administrative Order to Commence Design Activity - Estimated duration for making available to the Contractor the documents necessary for obtaining authorizations/approvals: 9 months - Duration for obtaining authorizations/approvals: 3 months - Works execution duration: 36 months from the Date of the execution order, which will be notified by the Beneficiary to the contractor at the time of transmitting the Administrative Order to Commence. For this project, there is a possibility of financing from non-reimbursable European funds (at this moment, an application has been submitted for access to funds from the Modernization Fund, but it has not yet been approved – under evaluation). The notion of Lot 1, Lot 2, and Lot 3 at the level of the technical specifications does not refer to “LOT” in the sense provided by procurement legislation, but refers to the phasing of the contract into 3 parts: LOT 1 - 400kV Bălţi LEA Bay in the 400kV Suceava substation; LOT 2 - Single-circuit 400kV LEA Suceava – Bălți section on Romanian territory; LOT 3 - Modifications in installations affected by the LEA construction. This procedure will conclude with a single contract that will cover all activities in this documentation.

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on March 14, 2025. Last refreshed 38 days ago. Original language: ro. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A.

COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A. has issued 168 procurement notices on BidsFactory, including 6 currently open and 140 awarded contracts. Activity concentrates in Transport & Logistics, Energy & Power, and Governance & Public Administration. All notices are published for Romania. Notices are distributed via SEAP Romania and TED - Tenders Electronic Daily (EU). Most recent publication: September 14, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A. in Romania. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

How much was the contract awarded for?

ELM ELECTROMONTAJ CLUJ; ELECTROMONTAJ was awarded the contract for €133,427,536. The figure reflects the value disclosed by the contracting authority in the award notice.

Where will the contract be performed?

The contract is for delivery in Romania. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Is this tender still open?

No — the contract has already been awarded to ELM ELECTROMONTAJ CLUJ; ELECTROMONTAJ. The award notice is archived on BidsFactory for transparency and market intelligence.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Works
Eligibility
Firms / Consortiums
Language
ro

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

COMPANIA NATIONALA DE TRANSPORT AL ENERGIEI ELECTRICE "TRANSELECTRICA" S.A.
🇷🇴Romania

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.