Tenders/Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)
Open🇩🇪GermanyServices

Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)

AquaDuctus Pipeline GmbH
Published: Aug 22, 2026
Updated: Aug 22, 2026
Source: oeffentlichevergabe_de

About This Opportunity

This is a services contract in the environment and climate, architecture and engineering and energy and power sectors, with a focus on environmental impact assessment and Oil Gas. Located in Germany, Europe, this opportunity is open to firms and consortiums.

Published through DÖE Bekanntmachungsservice (Germany), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for services in the environment and climate sector. Service contracts are typically evaluated on both technical quality and price, and may require bidders to demonstrate relevant experience and qualified personnel. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing. To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the planned production facilities in the German EEZ (SEN-1 Area). For the shore crossing, the selected contractor shall prepare a legally compliant EIA as part of the Energy Industry Act (EnWG) permit process, based on agreed scoping with the responsible approval authority (Landesamt für Bergbau, Energie und Geologie - LBEG), covering nature conservation, water protection, and impact compensation requirements, which also include environmental studies. The substantive requirements for the environmental documentation are derived from the Energiewirtschaftsgesetz (EnWG), Bundesnaturschutzgesetz (BNatSchG) and Wasserhaushaltsgesetz (WHG). The contracting authority will align the precise scope of the investigations with the LBEG. The selected contractor shall assist the contracting authority in preparing, planning and executing the permit application process. The services comprise: determination of the data basis; preparation of documents for and participation in the scoping conference with the approval authority and specialist authorities (optional); performance of environmental surveys; preparation of formal environmental documentation for approval. Further technical requirements are detailed in Attachment B.1 Scope of Work. The duration of the contract is not time limited. The estimated duration is 2.5 years, but the works due under the contract may take longer, e.g., if the works are not yet completed because the permit application process takes longer. Further details are provided in the contract documentation.

Data provenance

This notice is sourced from DÖE Bekanntmachungsservice (Germany) and was originally published on August 22, 2026. Last refreshed today. Original language: German. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About AquaDuctus Pipeline GmbH

AquaDuctus Pipeline GmbH has issued 6 procurement notices on BidsFactory, including 1 currently open and 1 awarded contracts. Activity concentrates in Architecture & Engineering Services, General Supplies & Services, and Environment & Climate. All notices are published for Germany. Notices are distributed via DÖE Bekanntmachungsservice (Germany), service.bund.de (Germany), and TED - Tenders Electronic Daily (EU). Most recent publication: August 22, 2026.

Frequently asked questions about this tender

How can I submit a bid?

Visit DÖE Bekanntmachungsservice (Germany) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by AquaDuctus Pipeline GmbH in Germany. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Services contract in the Environment & Climate sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Germany. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Services
Eligibility
Firms / Consortiums
Language
German

Source

oeffentlichevergabe_de
oeffentlichevergabe_de
Official Source

Contracting Authority

AquaDuctus Pipeline GmbH
🇩🇪Germany

Contact

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.