Tenders/European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA
Open🇩🇪GermanySupplies

European XFEL: Superconducting undulator modules for an afterburner for SASE2 - FESTA

European X-Ray Free-Electron Laser Facility GmbH
Published: Nov 9, 2026
Updated: Nov 9, 2026
Source: TED - Tenders Electronic Daily (EU)

About This Opportunity

This is a supplies contract in the Research sector, with a focus on Scientific Research and R&D equipment. Located in Germany, Europe, this opportunity is open to firms and consortiums.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for the supply of goods in the Research sector. Supply contracts typically require bidders to demonstrate product compliance with technical specifications, delivery capacity, and relevant certifications. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Scope of Work After Award: The tender covers the following components and requirements: Superconducting Undulator Modules: Composition: Small series of five with an option of sixth SCU module, each approximately 5 meters long. Installation: The SCU modules will be positioned after the existing 35 permanent magnet undulator modules of the SASE2 line at European XFEL Technical design report: A Technical Design Report (TDR) for one representative SCU module must be provided after award to EuXFEL for review and approval Tests: An intermediate test of all the SCU magnets in a liquid-helium (LHe) vertical cryostat at DESY (SUNDAE1), carried out under the responsibility of EuXFEL, is foreseen to train and characterize the magnetic field. The acceptance tests of each SCU module include: factory acceptance test (FAT) and three site acceptance tests: the first SAT which includes magnetic characterization, SAT2 in the tunnel without beam and SAT3 in tunnel with beam. Timeline: The fifth SCU module must be delivered latest by June 2032, and the sixth optional SCU module, if the option is exercised, latest by June 2033. Technical Specifications include: Magnetic Configuration: Each SCU module consists of two 2 m long SCU magnets, each with: Vacuum stay-clear: 5 mm Period: 18 mm Peak magnetic field: ≥ 1.82 T The root mean square of the relative variation of the undulator parameter defined over half period must be smaller than 0.004 The range of the relative variation of the undulator parameter defined over half period must be smaller than 0.012 Shimming coils must be applied in case the undulator parameters mentioned above are not reached in the measurement in SUNDAE1: root mean square of the relative variation of the undulator parameter defined over half period larger than 0.004 and /or the range of the relative variation of the undulator parameter defined over half period larger than 0.012. Components: - A cryostat for thermal isolation consisting of a vessel and several thermal shields. - An electron beam vacuum chamber (EBC) with the following functions: separating the isolation vacuum, where the superconducting magnets are located, from the ultra high vacuum where the electron beam moves, shielding the superconducting magnets from beam heat load. - Two SCU magnets, each consisting of a top and bottom coil held together by a support structure, equipped with correction coils. - Horizontal and vertical Helmholtz coils at the exit of the upstream SCU magnet and at the entrance of the downstream SCU magnet. - A phase shifter to manage phase mismatch between the two SCU magnets. A support structure holding together the Helmholtz coils and the phase shifter. This support structure and the ones of the SCU magnets must keep the superconducting magnets at the final gap and have to be designed and manufactured to fit in the magnetic gap precisely machined rails to guide a sledge with Hall probes. The sledge with Hall probes will be provided by EuXFEL. This is needed to perform the test in SUNDAE1 mentioned above. The contract will provide for a firm obligation to supply five (5) SCU modules. In addition, the contract will include an option entitling EuXFEL, at its sole discretion, to order one (1) additional (sixth) SCU module with the same technical specifications and on the same contractual terms. The option shall lapse if EuXFEL does not exercise it by the end of July 2029. EuXFEL is under no obligation to exercise the option. Further details will be set out in the procurement documents, including the complete technical specification, which will be provided to the selected candidates following completion of the selection stage and submission of the confidentiality agreement.

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on November 9, 2026. Last refreshed today. Original language: German. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About European X-Ray Free-Electron Laser Facility GmbH

European X-Ray Free-Electron Laser Facility GmbH has issued 32 procurement notices on BidsFactory, including 1 currently open and 6 awarded contracts. Activity concentrates in General Supplies & Services, Architecture & Engineering Services, and Construction & Civil Works. All notices are published for Germany. Notices are distributed via service.bund.de (Germany) and TED - Tenders Electronic Daily (EU). Most recent publication: November 9, 2026.

Frequently asked questions about this tender

Where will the contract be performed?

The contract is for delivery in Germany. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Who is the contracting authority?

This notice was issued by European X-Ray Free-Electron Laser Facility GmbH in Germany. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Supplies contract in the Research & Innovation sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Contract Type
Supplies
Eligibility
Firms / Consortiums
Language
German

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

European X-Ray Free-Electron Laser Facility GmbH
🇩🇪Germany