[Construction Related Work] Sand Contract Sand Repair G Number Prefectural Single Sabo Repair Sabo Dam Reconstruction, etc. Survey and Design Work Consignment
Form No. 1 [Post-Review Type / Regional Type (Human Resource Development Type) Comprehensive Evaluation and Bidding Method]
Nobuhiro Ukai, Director of Mino Branch Office, Gifu Prefectural Civil Engineering Office
1. Work Subject to General Competitive Bidding
(1) Sand Contract Sand Repair G Number
Construction Name: Prefectural Single Sabo Repair Sabo Dam Reconstruction, etc. Survey and Design Work Consignment (Electronic Bidding Target Project)
(2) Location: Within Matsutani Dorokawa, Itadori, Seki City
(3) Survey Work: Control point survey N=4 points, Field survey A=0.007km², Route survey L=0.17km
Design Work: Facility design N=1 set, Temporary structure design N=1 set
(4) Period: Until March 20, Reiwa 9
(5) Estimated Price: 9,325,800 yen (including consumption tax and local consumption tax)
(6) Yes
(7)
(8)
2. Bid Participation Qualifications
Matters related to bid participation qualifications:
(a) Capital relationship
(i) When there is a parent-subsidiary relationship (refer to Article 2, Item 4 of the Companies Act for parent company. Same hereinafter.)
(ii) When there is a relationship between subsidiaries with the same parent company.
(b) Personnel relationship
(i) When an officer of one company concurrently serves as an officer of the other company.
(c) Other
When it is deemed that the appropriateness of bidding is hindered.
Other: When there is a capital or personnel relationship deemed equivalent to the above (i) and (ii).
Specifications Number: Consignment Name: Consignment Location: Consignment Outline: Period: Estimated Price:
If any of the following apply.
However, this does not apply if one of the subsidiaries (refer to Article 2, Item 3 of the Companies Act (Law No. 86 of 2005). Same hereinafter.) or one of the subsidiaries has undergone rehabilitation proceedings under the Civil Rehabilitation Law or has had rehabilitation proceedings commenced under the Corporate Rehabilitation Law.
Has not been subject to bid participation suspension measures based on the "Measures for Suspension of Bid Participation Qualifications, etc. in Contracts for Construction Work by Gifu Prefecture" (Notice No. 12, Kenken, April 1, 2001) (hereinafter referred to as "Participation Qualification Suspension Measures") during the period from the application deadline to the date of determination of the successful bidder for this work.
Has not been subject to bid participation suspension measures based on the "Measures for Exclusion of Violent Groups from Contracts by Gifu Prefecture" by the bid opening date, or does not fall under the measures criteria listed in the appendix of the same notice.
Among the work ordered by Gifu Prefecture, if there is a record of construction-related work completed and delivered within the two fiscal years immediately preceding March 31, Reiwa 8 (from April 1, Reiwa 6), the average work performance evaluation score is 65 points or higher.
There is no relationship between bidders that falls under any of the following criteria.
However, if such a relationship exists, communication between parties for the purpose of determining a decliner shall not be considered a fraudulent act such as bid rigging.
Is not a person falling under the provisions of Article 167, Paragraph 4 of the Local Autonomy Act Enforcement Regulations (Cabinet Order No. 16 of 1947) (hereinafter referred to as "Enforcement Regulations").
Is registered in the "List of Bidders for Construction Work in Gifu Prefecture" for construction-related work (Survey and Construction Consulting, etc. (River, Sabo, and Coast/Ocean Departments)).
This work is a trial project for the regional type (human resource development type) comprehensive evaluation and bidding method for construction-related work, which accepts technical document proposals and determines the successful bidder by comprehensively evaluating factors other than price along with price.
This work is a general competitive bidding by a single entity.
The qualifications required for bidders are as follows.
Unless otherwise specified, bid participation qualifications are as of the submission deadline for the bid participation application for this work (hereinafter referred to as "Application Deadline").
If any of the following apply.
However, this does not apply if one of the companies is a rehabilitation company or a company undergoing reconstruction proceedings.
Bid Announcement
General Competitive Bidding Announcement for Prefectural Single Sabo Repair Sabo Dam Reconstruction, etc. Survey and Design Work Consignment
This work will be conducted using the electronic bidding system.
However, if it is difficult to use the electronic bidding system, written submission may be permitted with prior approval from the authorized officer.
October 19, Reiwa 8
Prefectural Single Sabo Repair Sabo Dam Reconstruction, etc. Survey and Design Work Consignment
Regarding the Prefectural Single Sabo Repair Sabo Dam Reconstruction, etc. Survey and Design Work Consignment, a post-review type general competitive bidding will be held, and we hereby announce in accordance with the provisions of Article 127 of the Gifu Prefecture Accounting Regulations (Reiwa 32, Gifu Prefecture Ordinance No. 19) (hereinafter referred to as "Regulations").
This bid will be executed via the electronic bidding system. However, if you have changed your company name, address, or representative and have not updated your IC card, please participate using the paper bidding method.
If you continue to use your IC card, your bid may be invalidated or you may be subject to suspension of bid participation qualifications.
Please contact us if you have any questions.
If a company has filed for commencement of rehabilitation proceedings under Article 17 of the Corporate Rehabilitation Law (Law No. 154 of 2002) (hereinafter referred to as "Corporate Rehabilitation Law"), it must have received a decision to approve the rehabilitation plan in accordance with Article 199 or 200 of the same law.