Tenders/Tender Package No. 05: Construction and Equipment Installation (including environmental sanitation fees, environmental protection fees, mining land tax, utilized land exploitation fees, power disconnection and reconnection fees, and energization acceptance and handover fees)
Open🇻🇳VietnamWorks3 days remaining

Tender Package No. 05: Construction and Equipment Installation (including environmental sanitation fees, environmental protection fees, mining land tax, utilized land exploitation fees, power disconnection and reconnection fees, and energization acceptance and handover fees)

Auto-translated from vi
Original title: Gói thầu số 05: Thi công xây dựng và lắp đặt thiết bị (bao gồm phí vệ sinh môi trường, phí bảo vệ môi trường, thuế đất khai thác, phí khai thác đất tận dụng, phí ngừng và cấp điện trở lại và phí nghiệm thu đóng điện, bàn giao công trình)
Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn
Published: Jun 10, 2026
Updated: Jun 16, 2026
Source: vietnam_egp

About This Opportunity

This is a works contract in the construction and civil works, energy and power and mining and extractives sectors, with a focus on Buildings. Located in Vietnam, Asia, this opportunity is open to firms and consortiums, with an estimated budget of VND 77.6 billion. Proposals must be submitted before June 28, 2026.

Published through Vietnam e-GP, a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Original language: vi

Gói thầu số 05: Thi công xây dựng và lắp đặt thiết bị (bao gồm phí vệ sinh môi trường, phí bảo vệ môi trường, thuế đất khai thác, phí khai thác đất tận dụng, phí ngừng và cấp điện trở lại và phí nghiệm thu đóng điện, bàn giao công trình)

Số thông báo: IB2600280980

Bên mời thầu: Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn

Địa điểm: Tỉnh Quảng Ninh

Lĩnh vực: XL

Số kế hoạch: PL2600165502

Loại kế hoạch: DTPT

Loại: es-notify-contractor

Giá trị: 77,649,146,000 VND

Thời điểm đóng thầu: 28/06/2026 09:00

Data provenance

This notice is sourced from Vietnam e-GP and was originally published on June 10, 2026. Last refreshed 9 days ago. Reference: 8686743c-4d17-4e46-bb6d-59fe5ad71e4b. Original language: vi. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn

Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn has issued 37 procurement notices on BidsFactory, including 10 currently open and 19 awarded contracts. Activity concentrates in Construction & Civil Works, Architecture & Engineering Services, and General Supplies & Services. All notices are published for Vietnam. Notices are distributed via Vietnam e-GP. Most recent publication: June 18, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

What is the estimated budget?

The estimated contract value is ₫77,649,146,000 - ₫77,649,146,000. Bidders should ensure their proposals are consistent with this range and account for any local taxes and contract execution costs.

Where will the contract be performed?

The contract is for delivery in Vietnam. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit Vietnam e-GP to access the full notice, required documents, and submission instructions. Quote reference 8686743c-4d17-4e46-bb6d-59fe5ad71e4b when communicating with the contracting authority.

When does this tender close?

The submission deadline is June 28, 2026. You have 3 days left to prepare and submit your proposal to the contracting authority.

Who is the contracting authority?

This notice was issued by Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn in Vietnam. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Submission Deadline
Jun 28, 2026
3 days remaining
Estimated Budget
₫77,649,146,000 - ₫77,649,146,000
Contract Type
Works
Eligibility
Firms / Consortiums
Language
vi
Reference
8686743c-4d17-4e46-bb6d-59fe5ad71e4b

Source

vietnam_egp
vietnam_egp
Official Source

Contracting Authority

Ban quản lý dự án đầu tư xây dựng đặc khu Vân Đồn
🇻🇳Vietnam

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.

Similar Open Tenders in Vietnam

Open🇻🇳Vietnam

Package 01: Supply of equipment, insurance purchase, and construction of the project "Renovation of electrical equipment and completion of overhead low-voltage outgoing lines at public substations in Chánh Hưng, Bình Đông, Phú Định wards - Renovation of electrical equipment and completion of underground low-voltage outgoing lines at public substations in Chánh Hưng, Bình Đông, Phú Định wards

Energy & Power📦 General Supplies & Services
Jun 29, 2026₫9,367,303,897 - ₫9,367,303,897
Open🇻🇳Vietnam

Repair of fences on both sides of the water channel to Phu My Power Center

📐 Architecture & Engineering Services🏗️ Construction & Civil Works
Jun 29, 2026₫876,300,399 - ₫876,300,399
Open🇻🇳Vietnam

Construction of fence for Technical Logistics Center area, guesthouse, temporary institute, and planting grass on the sidewalk of the temporary institute

🏗️ Construction & Civil Works📐 Architecture & Engineering Services
Jun 26, 2026
Open🇻🇳Vietnam

Construction of facilities for operational purposes

🏗️ Construction & Civil Works📐 Architecture & Engineering Services
Jun 28, 2026₫16,004,882,473 - ₫16,004,882,473
Open🇻🇳Vietnam

Repair of 22kV power line 480E8.1 from pole 23 to pole 25 and RMU cabinet 07 line 475E8.13 - Hai Duong Power Line Management Team

Energy & Power
Jun 30, 2026₫2,273,044,056 - ₫2,273,044,056
Open🇻🇳Vietnam

Tender Package No. 02: Consulting Services for Developing Bidding Documents and Evaluating Bids for Construction Works

🏗️ Construction & Civil Works
Jun 19, 2026₫4,898,740,438 - ₫4,898,740,438