Construction of Hévíz substation
About This Opportunity
TranslatedConstruction of Hévíz substation, including relay houses, concrete roads, landscaping, and foundations for 400 kV and 132 kV structures.
This is a works contract in the construction and civil works sector. Located in Hungary, Europe, this opportunity is open to firms and consortiums, with an estimated budget of HUF 1.8 billion.
Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Auto-translated from huHévíz Substation Quantities: - 2 pcs relay house (with installation and mechanics): gross 76 m2 - concrete paved road: 2800 m2 - fine landscaping: 28000 m2 - 400 kV monolithic reinforced concrete foundations with steel structure projections: 240 m3 - 132 kV and area lighting monolithic reinforced concrete foundations with steel structure projections: 978 m3 - 18 kV monolithic reinforced concrete foundations with steel structure projections: 27 m3 - construction of oil separator system, construction of rainwater drainage: 1 pc oil separator, 150 fm channel - monolithic and prefabricated cable channel: 470 fm - construction of 400 kV transformer foundation (incorporated concrete quantity): 170 m3 - substation fence 475 fm Fine landscaping of the area includes drainage, topsoil spreading in the affected area, and grassing, grass care until the first mowing (including mowing). Before starting the work, the Contractor must submit a professionally developed technological instruction (TU), sampling and certification plan (MMT), and a weekly indicative schedule for all work processes. Work cannot begin without the TU, MMT, and schedule approved by the Client. The Client cannot accept schedule slippage on the grounds that the Contractor could not start work due to the lack of approved TU+MMT. The daily working time must be determined in accordance with the substation service. The final completion of fine landscaping will be possible after the electrical technology team has withdrawn. During certain periods of the work processes, construction and technological installation specialists will be working on the site simultaneously. During these periods, work can be carried out with consideration for each other, hindering each other as little as possible. During foundation work, only the architectural tasks up to the installation of the steel structures to be concreted need to be performed; the production and erection of device support steel structures, lattice columns, and portals are not part of the task. The complete construction of the building is the task, including the execution of building services and electrical installation. Only the placement of necessary protective pipes for property and fire protection is included in the tender. There are high-voltage equipment operating in the substation area (outside the immediate work area). Special attention must be paid to the operating equipment during construction work; failure to comply with the relevant regulations may result in the Contractor being banned from the site. During construction, it is possible that utilities, cables, and grounding grids are located in the ground. The operational supervision may request manual excavation before starting earthworks. Construction water and electricity are provided during construction, but their routing to the work area within the substation and protection of the routing is the Contractor's responsibility. During construction, excavated soil that is not to be backfilled must be immediately removed; on-site deposition is not possible. Construction will be considered complete when the entire area affected by the work (including, but not limited to, the work area, topsoil depot, site facilities area, areas compacted by construction machinery, and areas compacted by electrical technology) has been finely landscaped and grassed. The winning bidder (AT) is responsible for fulfilling the conditions for starting actual work in the handed-over work area, which include in particular: the existence of all permits and documents necessary for the implementation of the construction, to be provided by them. The detailed conditions are included in the procurement documentation.
Data provenance
This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on April 23, 2026. Last refreshed 133 days ago. Original language: hu. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About MVM XPert Zártkörűen Működő Részvénytársaság
MVM XPert Zártkörűen Működő Részvénytársaság has issued 4 procurement notices on BidsFactory, including 0 currently open and 2 awarded contracts. Activity concentrates in Energy & Power and Construction & Civil Works. All notices are published for Hungary. Notices are distributed via Hungary EKR and TED - Tenders Electronic Daily (EU). Most recent publication: June 9, 2026.
Frequently asked questions about this tender
Is this tender still open?
No — the contract has already been awarded to Bolax Építőipari és Kereskedelmi Kft.. The award notice is archived on BidsFactory for transparency and market intelligence.
Who is the contracting authority?
This notice was issued by MVM XPert Zártkörűen Működő Részvénytársaság in Hungary. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
How much was the contract awarded for?
Bolax Építőipari és Kereskedelmi Kft. was awarded the contract for HUF 1,339,027,616. The figure reflects the value disclosed by the contracting authority in the award notice.
Where will the contract be performed?
The contract is for delivery in Hungary. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Key Details
Contracting Authority
Contact
Companies That Won Similar
Companies with awards in Construction & Civil Works in Hungary