Tenders/Klinikum Esslingen - TGA-HLSK planning LPH3 to 9 of cost groups 410, 420, 430, 470 - 7420_0600
Awarded🇩🇪GermanyServices

Klinikum Esslingen - TGA-HLSK planning LPH3 to 9 of cost groups 410, 420, 430, 470 - 7420_0600

Auto-translated from German
Original title: Klinikum Esslingen - TGA-HLSK-Planung LPH3 bis 9 der Kostengruppen 410, 420, 430, 470 - 7420_0600
Eigenbetrieb Klinikum Esslingen, Geschäftsbereich 5 Bau
Published: Aug 4, 2026
Updated: Aug 7, 2026
Source: TED - Tenders Electronic Daily (EU)

About This Opportunity

This is a services contract in the architecture and engineering sector. Located in Germany, Europe, this opportunity is open to firms and consortiums.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for services in the architecture and engineering sector. Service contracts are typically evaluated on both technical quality and price, and may require bidders to demonstrate relevant experience and qualified personnel. This contract has already been awarded. The information is published for transparency and market intelligence purposes.

Description

Auto-translated from German
In 2020, Klinikum Esslingen, in close coordination with the Ministry of Social Affairs, Health and Integration of Baden-Württemberg, developed a Master Plan for Construction for the clinic. This Master Plan for Construction envisages a total of three construction phases with the creation of three new buildings. The future buildings consistently group similar functions into units, such as outpatient clinics and functional areas, and provide for a separation of inpatient and outpatient services. The clear new structure is intended to simplify organization for the clinic, and patients are to benefit from patient-oriented processes with significantly shorter distances. At Klinikum Esslingen, the demolition of the old Bed Building 2 has begun, marking the start of the first phase of a comprehensive modernization project. The construction of the first construction phase is scheduled to begin next year. The seven-story building will house eight state-of-the-art operating rooms, a central emergency room, an intensive care unit, and new nursing and specialized areas. Clinic operations will continue without interruption during the construction work. A modular building with 150 beds has been erected as a temporary solution. In parallel, a new technical control center and a ring conduit for the central control of energy and supply are being built. The new building will be constructed on a foundation pit up to 16 meters deep and will offer approximately 16,000 square meters of usable space in the future. The new buildings within the first construction phase are included in the State Hospital Construction Program. Funding commitments for this construction phase have been received from the funding body. Building permits from the City of Esslingen are available for the new construction of Buildings 2 and 12. Two further construction phases are already planned but not yet approved. With a total of three project phases over 15 years, this is the largest single construction measure in the history of the City of Esslingen. The clinic - a wholly-owned subsidiary of the city - employs around 2,000 staff and treats over 140,000 patients annually. The project decisions made during the design planning form the basis for the further service phases. The results of the preliminary and design planning are to be adopted by the specialist planner. The planning premises of LPH 2 and 3 remain valid and will be updated in the course of preparation and with LPH 5 onwards. The following project structure is to be used as a basis: The planning of the new construction of Buildings 2, 7, and 8 is thus divided into the planning for the 1st construction phase (Building 2) including interim solutions within the new construction, and the planning for the 2nd construction phase (Buildings 7 and 8) including final solutions for interim areas of the 1st construction phase. The new Buildings 2, 7, and 8 form a structurally and functionally connected building complex. This is connected to the surrounding above-ground and underground existing structures via various connections. The construction project to be processed is divided into the sub-projects Building 2 in the 1st construction phase and new construction of Buildings 7 and 8 in the 2nd construction phase, each including the demolition of existing buildings (exception BA2), excavation pit, and shoring. The new buildings are to be realized on the site while the hospital is in operation. The following key figures result for the new buildings: Planning 1st construction phase with interim solutions (Building 2): Design planning status: 6,452 m² usable floor area, 18,225 m² gross floor area Planning 1st construction phase with interim solutions (Building 12): Design planning status: 176 m² usable floor area, 1,333 m² gross floor area Planning 2nd construction phase (Buildings 7 and 8) with final modification and expansion of interim areas: Preliminary planning status: 12,775 m² usable floor area, 28,497 m² gross floor area The essential functional units include the central operating department, outpatient operating rooms, intensive care units, AEMP (sterile supply processing), interdisciplinary emergency department, as well as other functional areas (including functional diagnostics and nursing stations, technical and administrative areas) and associated nursing stations. Necessary interim measures within the construction phases are to be implemented in the planning.

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on August 4, 2026. Last refreshed 11 days ago. Original language: German. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Eigenbetrieb Klinikum Esslingen, Geschäftsbereich 5 Bau

Eigenbetrieb Klinikum Esslingen, Geschäftsbereich 5 Bau has issued 4 procurement notices on BidsFactory, including 0 currently open and 2 awarded contracts. Activity concentrates in Architecture & Engineering Services. All notices are published for Germany. Notices are distributed via TED - Tenders Electronic Daily (EU). Most recent publication: August 4, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by Eigenbetrieb Klinikum Esslingen, Geschäftsbereich 5 Bau in Germany. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Services contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Germany. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Is this tender still open?

No — the contract has already been awarded to Ingenieurbüro Sulzer GmbH & Co. KG. The award notice is archived on BidsFactory for transparency and market intelligence.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Services
Eligibility
Firms / Consortiums
Language
German

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

Eigenbetrieb Klinikum Esslingen, Geschäftsbereich 5 Bau
🇩🇪Germany

Contact

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.