Servica Oy is tendering for tubed and tubeless hybrid pumps and glucose sensors for real-time monitoring for the needs of the North Savo Wellbeing Services County, South Savo Wellbeing Services County, and North Karelia Wellbeing Services County, to be used both with hybrid pumps and as standalone meters. The parties included in this tender request will hereinafter be referred to as "Client". Detailed information about the users of the products is described in the appendix "Draft Agreement" of the tender request.
More detailed consumption estimates can be found in the information for the sub-area, and the requirements can be found in the tender request and its appendices.
To be considered in the procurement:
- The equipment supplier shall ensure, through cooperation between suppliers, that a compatible sensor(s) is offered for the pump.
- Home care supply and home delivery (CPV additional codes Transport services for packages 60161000-4) are requested as an option. The tenderer may offer the option if they have tendered for sub-areas 1-3, and the supplier will provide their own price list, describing the operating model and system.
- More detailed information is on the tender appendix, which must be completed with the tender.
Other considerations:
All tenderers who meet the minimum requirements of the tender request will be selected as suppliers for the sub-areas. Tenders will be prioritized in the comparison based on the scoring obtained, which compares the annual cost of the equipment and consumables. Priority order means, for example, for the equipment part, that the most affordable product offered for the intended use for the relevant target group is examined first, and then the next in order, until a suitable product for the patient is found. The possibility of selection according to the priority order will always be checked for new patients or if there is a need to change the product for an existing patient. Products already used by a patient during the contract period will only be changed if the care needs require it. The selection or change of a product is always made by the treating healthcare staff. Therefore, the change of the contract period does not mean that products used by so-called existing customers will be changed without medical grounds, if the product also selected for the contract in the tender is suitable. The consumption volumes and selection of sensors will also depend on the device selection for the upcoming contract period (tubed and tubeless sensor hybrid pump), as the hybrid pump system uses a sensor. The supplier will indicate in their tender the sensors compatible with the device and, for sensors, the devices to which the sensor is compatible.
The criteria for selecting the product and supplier are therefore:
- Priority order
- For hybrid pump systems, also the life-cycle costs of the entire hybrid pump system (pump & consumables, sensor costs, other costs)
- The tenderer's ability and costs for providing home delivery (option, per client)
- The final decision on the pump to be given to the patient will always be made on medical grounds by the treating unit.
Estimated user numbers and new starts per year for the sub-areas are listed on the tender appendix to support the tenderer in making their offer.
Contracts will be made for an indefinite period.
The value of the procurement has been calculated based on a 4-year consumption estimate.
Contracts may be combined by sub-area if the tenderer offers for the sub-areas and is selected as a supplier.
The procurement contract will stipulate key terms so bindingly that the contract can be implemented during the contract period in accordance with the procurement contract (cf. framework agreement with multiple suppliers, where terms are fixed): the price will be fixed and bindingly determined in the procurement procedure, leaving only the exact quantity of products to be procured and matters related to their ordering and delivery open.
, PART 1. Tubeless hybrid pump This sub-area tenders for sensor-equipped tubeless insulin pumps with automatic insulin delivery (tubeless hybrid pumps). Pumps and consumables, excluding sensors.
Estimated user numbers per year + estimate of new starts:
North Savo Wellbeing Services County 30 units, 70 new starts per year
North Karelia Wellbeing Services County 30 units, 25 new starts per year
South Savo Wellbeing Services County 48 units, 30 new starts per year
During the contract period, products already used by a patient will only be changed if the care needs require it. The selection or change of a product is always made by the treating healthcare staff. Therefore, the change of the contract period does not mean that products used by so-called existing customers will be changed without medical grounds, if the product supplier has been selected for the contract.
The calculation of the estimated value of the sub-area of procurement has been based on a moderate scenario where 5% of existing users would switch to a new product.
Clients are not committed to a specific consumption estimate. The consumption estimates above are provided to support the tenderer in making their offer, but the final number of users for the device during the contract period may be more or less.
PART 2. Tubed hybrid pump This sub-area tenders for sensor-equipped tubed insulin pumps with automatic insulin delivery (tubed hybrid pumps). Pumps and consumables, excluding sensors.
Estimated user numbers per year + estimate of new starts:
North Savo Wellbeing Services County 957 units, 100 new starts per year
North Karelia Wellbeing Services County 375 units, 65 new starts per year
South Savo Wellbeing Services County 346 units, 30 new starts per year
During the contract period, products already used by a patient will only be changed if the care needs require it. The selection or change of a product is always made by the treating healthcare staff. Therefore, the change of the contract period does not mean that products used by so-called existing customers will be changed without medical grounds, if the product supplier has been selected for the contract.
The calculation of the estimated value of the sub-area of procurement has been based on a moderate scenario where 5% of existing users...