Tenders/Liminka-Oulu double track, Geotechnical surveys, framework agreement
Awarded🇫🇮FinlandFramework

Liminka-Oulu double track, Geotechnical surveys, framework agreement

Auto-translated from fi
Original title: Liminka-Oulu kaksoisraide, Maaperätutkimukset, puitesopimus
Väylävirasto
Published: Nov 8, 2026
Updated: Nov 11, 2026
Source: Hilma Finland

About This Opportunity

This is a framework agreement contract in the architecture and engineering and transport and logistics sectors. Located in Finland, Europe, this opportunity is open to firms and consortiums, with an estimated budget of EUR 2.0 million.

Published through Hilma Finland, a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for framework agreement in the architecture and engineering sector. Framework agreements establish terms for recurring procurement over a defined period. Selected firms are called upon as needs arise, making this a longer-term engagement opportunity. This contract has already been awarded. The information is published for transparency and market intelligence purposes.

Description

Auto-translated from fi
Liminka-Oulu double track, Geotechnical surveys, framework agreement. In the Liminka–Oulu double track project, the capacity, smoothness, and operational reliability of the railway section will be improved by building a new track next to the existing one. The project's objectives include, among others: • Increase the capacity of the railway section and reduce susceptibility to disruptions. Liminka–Oulu is currently a single-track bottleneck for the entire Ylivieska–Oulu section. A double track will enable smoother traffic and reduce delays. • Improve the functionality of passenger and freight transport. The project supports both growing passenger traffic and heavy freight traffic. The goal is better coordination and shorter travel times. • Increase the technical level and enable speed increase. Target speed: 200 km/h for passenger trains. Two track realignments will be built to achieve the target speed. Axle load increase: 250 kN. • Improve the functionality of traffic sites. Changes will be made to the traffic sites in Liminka, Kempele, and Oulu. The Finnish Transport Agency has decided to enter into 4-year framework agreements for carrying out geotechnical and foundation surveys, as well as environmental sampling. The objective of the procurement is to enable the efficient production of high-quality survey data. The client will commission the following tasks under this framework agreement: Carrying out and analyzing geotechnical and foundation surveys and environmental sampling related to the Liminka-Oulu double track project for design assignments and during construction. The assignments are located between Liminka and Oulu. Notwithstanding the foregoing, assignments under the framework agreement may also be commissioned in other new projects that may start on the relevant railway section during the agreement period. The content of the tasks included in the service is defined in more detail in the assignment-specific orders and agreements. The estimated total value of the work to be commissioned within the framework arrangement is 2,000,000 euros during the validity period of the framework arrangement, excluding VAT. The framework arrangement will be concluded with at least three (if there are fewer than 3 accepted offers, the framework arrangement can also be concluded with one or two operators) and at most four suppliers. Position 4 will be included in the framework arrangement if the difference between the comparison price of the accepted offer in that position and the cheapest is less than 15%. Lot 1: Liminka-Oulu double track, Geotechnical surveys, framework agreement In the Liminka–Oulu double track project, the capacity, smoothness, and operational reliability of the railway section will be improved by building a new track next to the existing one. The project's objectives include, among others: • Increase the capacity of the railway section and reduce susceptibility to disruptions. Liminka–Oulu is currently a single-track bottleneck for the entire Ylivieska–Oulu section. A double track will enable smoother traffic and reduce delays. • Improve the functionality of passenger and freight transport. The project supports both growing passenger traffic and heavy freight traffic. The goal is better coordination and shorter travel times. • Increase the technical level and enable speed increase. Target speed: 200 km/h for passenger trains. Two track realignments will be built to achieve the target speed. Axle load increase: 250 kN. • Improve the functionality of traffic sites. Changes will be made to the traffic sites in Liminka, Kempele, and Oulu. The Finnish Transport Agency has decided to enter into 4-year framework agreements for carrying out geotechnical and foundation surveys, as well as environmental sampling. The objective of the procurement is to enable the efficient production of high-quality survey data. The client will commission the following tasks under this framework agreement: Carrying out and analyzing geotechnical and foundation surveys and environmental sampling related to the Liminka-Oulu double track project for design assignments and during construction. The assignments are located between Liminka and Oulu. Notwithstanding the foregoing, assignments under the framework agreement may also be commissioned in other new projects that may start on the relevant railway section during the agreement period. The content of the tasks included in the service is defined in more detail in the assignment-specific orders and agreements. The estimated total value of the work to be commissioned within the framework arrangement is 2,000,000 euros during the validity period of the framework arrangement, excluding VAT. The framework arrangement will be concluded with at least three (if there are fewer than 3 accepted offers, the framework arrangement can also be concluded with one or two operators) and at most four suppliers. Position 4 will be included in the framework arrangement if the difference between the comparison price of the accepted offer in that position and the cheapest is less than 15%. CPV: 71350000 Organisation: Finnish Transport Agency Procedure: open

Data provenance

This notice is sourced from Hilma Finland and was originally published on November 8, 2026. Last refreshed 7 days ago. Original language: fi. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Väylävirasto

Väylävirasto has issued 598 procurement notices on BidsFactory, including 58 currently open and 220 awarded contracts. Activity concentrates in Architecture & Engineering Services, Transport & Logistics, and Construction & Civil Works. All notices are published for Finland. Notices are distributed via Hilma Finland and TED - Tenders Electronic Daily (EU). Most recent publication: November 16, 2026.

Väylävirasto: buyer profile, tenders and awards

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by Väylävirasto in Finland. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Framework agreement contract in the Architecture & Engineering Services sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

What is the estimated budget?

The estimated contract value is Up to €2,000,000. Bidders should ensure their proposals are consistent with this range and account for any local taxes and contract execution costs.

Where will the contract be performed?

The contract is for delivery in Finland. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit Hilma Finland to access the full notice, required documents, and submission instructions provided by the contracting authority.

Is this tender still open?

No — the contract has already been awarded to Taratest Oy (0939835-0)//AFRY Finland Oy (FI06259056)//Suomen GPS-Mittaus Oy (0961185-2)//Mitta Oy (0779388-3). The award notice is archived on BidsFactory for transparency and market intelligence.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Submission Deadline
May 8, 2027
171 days remaining
Estimated Budget
Up to €2,000,000
Contract Type
Framework
Eligibility
Firms / Consortiums
Language
fi

Source

hilma_fi
Hilma Finland
Public Procurement

Contracting Authority

Väylävirasto
🇫🇮Finland