Tenders/New construction of Stadtwerke Memmingen operating facility - Technical equipment, ALG 1/2/3/7/8, Lph. 1-9
Awarded🇩🇪GermanyServices

New construction of Stadtwerke Memmingen operating facility - Technical equipment, ALG 1/2/3/7/8, Lph. 1-9

Auto-translated from German
Original title: Neubau Betriebsstätte Stadtwerke Memmingen - Technische Ausrüstung, ALG 1/2/3/7/8, Lph. 1-9
Stadtwerke Memmingen
Published: Dec 11, 2025
Updated: Aug 9, 2026
Source: TED - Tenders Electronic Daily (EU)

This tender has been awarded

Awarded to kplan AG — €156,465

Browse open Construction & Civil Works tenders in Germany

About This Opportunity

Translated

The Municipal Utilities of Memmingen are urgently seeking to reconstruct their facility due to outdated infrastructure and damage from flooding in June 2024. The current buildings consist of several functionally separated units, including administration, storage and workshop areas, a purchasing warehouse, and an operational apartment. These structures no longer meet modern standards for energy efficiency, accessibility, and workplace quality. A feasibility study has led to a conceptual proposal for redesigning the site. The objective is to construct a sustainable, energy-efficient, and future-proof operational building with outdoor facilities, adhering to the requirements of the Quality Seal for Sustainable Buildings Plus (QNG+). Effective flood protection must be ensured while considering economic viability. The existing buildings are planned for gradual demolition, followed by the construction of a new workshop hall with an integrated storage area, and subsequently a new administration building directly connected to the hall. The buildings will be constructed without basements to minimize groundwater risks. The new workshop hall will include storage areas, workshops, a tool dispensing area, a hazardous materials storage, and a disposal station. The administration will feature modern office spaces, customer service areas, meeting rooms, as well as social and changing rooms for technicians. A central aspect of the planning is to consider future expansion possibilities, particularly a potential (partial) extension of the administration building and a possible expansion of the workshop hall.

This is a services contract in the construction and civil works, architecture and engineering and energy and power sectors. Located in Germany, Europe, this opportunity is open to firms and consortiums.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for services in the construction and civil works sector. Service contracts are typically evaluated on both technical quality and price, and may require bidders to demonstrate relevant experience and qualified personnel. This contract has already been awarded. The information is published for transparency and market intelligence purposes.

Description

Auto-translated from German

Stadtwerke Memmingen faces the urgent need to rebuild its operating facility. The existing infrastructure is outdated in many respects and was partially damaged by the flood in June 2024. The current building stock comprises several functionally separate units: administration, storage and workshop areas, purchasing warehouse, and an operational apartment. These buildings no longer meet the requirements for modern operating facilities in terms of energy efficiency, accessibility, and workplace quality. Based on a feasibility study, a conceptual proposal for the redesign of the plant site has been developed. The goal is the construction of a sustainable, energy-efficient, and future-proof operating building with external facilities. Planning in accordance with the requirements of the Quality Seal Sustainable Building Plus (QNG+) is expressly desired. As part of the planning, effective flood protection must be ensured, taking economic efficiency into account. It is planned to gradually dismantle the existing buildings. Subsequently, a new factory hall with integrated storage is to be built, followed by the new construction of an administration building directly connected to the hall. The buildings are to be constructed without basements to minimize risks from groundwater. The new factory hall is to include storage areas, workshops, an equipment dispatch, a hazardous materials storage, and a disposal station. The administration is to offer modern office spaces, customer service areas, meeting rooms, as well as social rooms and changing rooms for fitters. A central component of the planning is the consideration of future expansion possibilities – especially a later (partial) extension of the administration building and a possible expansion of the factory hall. These options are to be considered from the outset in the planning. Given the high urgency of the project, the focus is on the shortest possible construction time and high cost efficiency. In this context, the use of modular construction methods and serial prefabrication is also to be examined, provided they can contribute to achieving the goals. The construction project is to be realized in timber or timber-hybrid construction to meet both ecological and design requirements. It is crucial that the chosen construction method allows for an economical and rapid implementation of the project. The total costs of the project (cost groups 200–700, as of April 2025) are estimated at approximately €9.3 million gross. The client reserves the right to award the measure, in whole or in part, to a general contractor for technical and economic reasons, in order to meet the time urgency of the construction. Planned project milestones: Start of services: December 2025, Start of construction: Early 2027, Completion: End of 2028. It is intended to commission the following services with this tender: Services for Technical Equipment, Plant Groups 1, 2, 3, 7 and 8, according to §§ 53 ff. HOAI. The services will be commissioned in stages. First, in the 1st commissioning stage, service phases 1-2 for ALG 1/2/3/7/8 according to § 55 HOAI will be commissioned. Service phases 3-9 will be called off in stages. There is no legal entitlement to full commissioning. Description of options: - Commissioning stage 2: Lph. 3-4 for ALG 1 and Lph. 3 for ALG 2/3/7/8, - Commissioning stage 3: Lph. 5-7 for ALG 1/2/3/7/8, - Commissioning stage 4: Lph. 8-9 for ALG 1/2/3/7/8, - Special services see fee proposal form. The planning services will be commissioned in stages, provided that expected subsidies are approved for the respective stage, provided that financing is secured, and provided that there are no serious reasons against further commissioning. These include reasons that would entitle the client to terminate the contract prematurely if it had already been awarded...

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on December 11, 2025. Last refreshed 14 days ago. Original language: German. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Stadtwerke Memmingen

Stadtwerke Memmingen has issued 4 procurement notices on BidsFactory, including 0 currently open and 3 awarded contracts. Activity concentrates in Architecture & Engineering Services, Energy & Power, and Construction & Civil Works. All notices are published for Germany. Notices are distributed via TED - Tenders Electronic Daily (EU) and DÖE Bekanntmachungsservice (Germany). Most recent publication: July 19, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Services contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

How much was the contract awarded for?

kplan AG was awarded the contract for €156,465. The figure reflects the value disclosed by the contracting authority in the award notice.

Where will the contract be performed?

The contract is for delivery in Germany. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Is this tender still open?

No — the contract has already been awarded to kplan AG. The award notice is archived on BidsFactory for transparency and market intelligence.

Who is the contracting authority?

This notice was issued by Stadtwerke Memmingen in Germany. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Services
Eligibility
Firms / Consortiums
Language
German

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

Stadtwerke Memmingen
🇩🇪Germany

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.