Tenders/Operations Manager- TRHDP

Operations Manager- TRHDP

Published: Oct 1, 2026
Updated: Oct 4, 2026
Source: world_bank

About This Opportunity

Request for Expression of Interest | Project: Tina River Hydropower Development Project | Method: Individual Consultant Selection | Ref: SB-MMERE-543881-CS-INDV

This is a consulting contract in the infrastructure, health and medical services and education and training sectors. Located in Solomon Islands, Pacific & Oceania, this opportunity is open to individual consultants.

Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the infrastructure sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

**Project:** Tina River Hydropower Development Project

TERMS OF REFERENCE

CONSULTING SERVICES – INDIVIDUAL SELECTION

TERMS OF REFERENCE FOR INDIVIDUAL CONSULTANT

PART I: 

Position

Operations Manager

Category of Consultancy

Local (Level 5)

Contract Type

Time-based Individual Consultant

Hiring Entity

TRHDP Project Office

Location

Honiara, Solomon Islands

Duration

2 years

Start date

As soon as possible upon agreement

 

 

Tina River Hydropower Development Project              

Project Details

Strategic Context

The Tina River Hydropower Project is the first large-scale infrastructure to be developed under a public-private partnership arrangement and the first utility-scale renewable energy project for the Solomon Islands expected to deliver benefits such as more affordable electricity and improved accessibility to cleaner, more reliable energy sources for community now and in the future.

 

The Tina River Hydropower Project consists of (i) 15-megawatt hydropower facility located on the Tina River southeast of Honiara, comprising: a dam, headrace tunnel and a powerhouse about 3km downstream of the dam; (ii) access road to facilitate the construction and operation of the hydropower facility; and (iii) transmission lines - two parallel (on separate poles) single circuit transmission lines connecting the powerhouse to the existing Lungga Power Station. Further project details are included in Annex A.

 

The Tina Hydro Project Office under the Ministry of Mines, Energy and Rural Electrification is responsible for the coordination of the project activities to ensure Tina Hydropower Limited as implementing entity responsible for the hydropower facility and access road and Solomon Power as Offtaker under the Power Purchase Agreement fulfil their obligations under the project agreements. The Project Office has a fundamental advisory role to Solomon Islands Government, ensuring that the interests of the government are protected in line with the project agreements. The Project Office is responsible for monitoring and supporting the implementation of the social and environmental safeguard arrangements, the Gender Action Plan and Community Development Plan, and maintaining the Dam Safety Advisory Panel (DSAP) and the Lender’s Technical Advisor (LTA) including the independent social and environmental monitoring agent. The Project Office also supports entities participating in the implementation arrangements agreed under the land acquisition process, the communities in utilizing their share of project benefits for community development, and the tribes which would be interested and committed to the establishment of a protected area in the upper catchment.

 

The Operations Manager of the Project Office is expected to enhance leadership within the Project Office to efficiently support project implementation in the best interests of the Solomon Islands Government.

Contract Details

Details

Objective

The Operations Manager shall be based in Honiara, Solomon Islands, providing support to the Project Manager (PM) in managing the Tina River Hydropower Project Office.

Duration 

The position is for a period of 2 years with expected opportunity to renew subject to satisfactory performance evaluation rating by the PM annually.

Reporting

The Operations Manager will report to the PM. The Operations Manager will shadow the PM to learn the various aspects of the Project including the following:

  • All the 4 components of the Project
  • The Stakeholders
  • Implementation
  • Flow of funds
  • Agreements including EPC contract
  • The Financial Model
  • Additional financing
  • Technical aspects of the dam, tunnel and powerhouse
  • Pending work at the site
  • Up to date Disbursements
  • Future disbursements
  • Pending design issues
  • Role of LTA and DSAP
  • Meetings
  • SharePoint structure
  • Procurement through STEP
  • Status of contracts of the Consultants
  • Performance Management
  • World Bank and other CFP Missions, aide memoir

The Operations Manager will hold briefing meetings with the PM monthly or as otherwise agreed in writing with the PM.

 

The Operations Manager, under the guidance of the PM and Deputy Project Manager, will provide project implementation progress updates to the Project Steering Committee (PSC) at the quarterly PSC meetings or as required by the Chairperson of the PSC.

The Operations Manager will liaise and work very closely with the CBSP 2 Project Manager, the Deputy Project Manager and the Environmental and Social Safeguards Manager such that he/she develops a very good understanding of the finances, procurement, administrative, communications & media, grievance redress mechanism, gender action plan, biodiversity management plan, safeguards, health and safety, Tina Core Land Company (TCLC), Cooperatives, Land, Influx,  all 4 components of the Community Benefits Sharing Project 2 (CBSP2)

The Operations Manager will shadow the Project Manager; however, it is expected that he/she to learn about the project he/she will actively be involved in the deliverables listed on page 6. The Operations Manager will conduct and chair meetings, preparing the agenda and minutes of the meetings.

 

The Operations Manager will act in the role of the Project Manager during periods of absence of the PM from Honiara. During this period the Operations Manager will be solely responsible for the running of the Project Office. The delegations include: authority to endorse and sign purchase vouchers, review and approve timesheets for the ESSM, the Financial & Commercial Advisor (FCA), review and approve invoices from LTA, DSAP members, Ashurst, the FCA, the ESSM; review and approve agenda for the Project Steering Committee meetings, CFP missions, review and approve imprest requests, review/endorse memos from DSAP, correspond with THL on pending matters, conduct and chair progress meetings, chair meetings with ADB, WB, MMERE, MOFT and respond to emails.

 

The Project Office organization chart is included in Annex B.

 

 

DETAILED POSITION DESCRIPTION

           

The Operations Manager will support the PM, the Environmental and Social Safeguards Manager, the Deputy Project Manager and the CBSP 2 Project Manager for ensuring the effective and efficient management of the Project Office by:

 

  1. Implementing the project activities under the Project Office’s responsibility, including monitoring and supporting the implementation of the social and environmental safeguard arrangements, the Gender Action Plan and Community Development Plan.

 

  1. Supporting the entities participating in the implementation arrangements agreed under the land acquisition process (Tina Core Land Company and the five core landowning tribes’ co-operatives), the communities in utilizing their share of project benefits for community development through the CBSP project, and the tribes which would be interested and committed to the establishment of a protected area in the upper catchment.

 

  1. Monitoring the project activities of Tina Hydropower Limited as implementing entity responsible for the hydropower facility and access road and Solomon Power as Offtaker under the Power Purchase Agreement to ensure they fulfil their obligations under the project agreements.

 

  1. Monitoring Solomon Islands Government commitments to ensure it is meeting and maintaining its obligations as required by the project agreements.

 

The Operations Manager’s detailed project description is set out as follows.

 

General Responsibilities & Objectives

 

  • Overall in-depth understanding of the relevant documents/agreements including:
    • Project Documents including Power Purchase Agreement (PPA), Implementation Agreement (IA). Government Guarantee Agreement (GGA), the Land Lease Agreement and the Side Letter Agreement.

 

    • Financing agreements and project agreements of all Concessional Financing Partners (CFPs), the Facilities Agreement, and various security agreements and documents.

 

    • Safeguards documents including Environmental Social Impact Assessment (ESIA), Land Acquisition and Livelihood Restoration Plan (LALRP), Gender Action Plan (GAP), Community Development Plan (CDP); and implementation of the Construction Environment and Social Management Plans (CESMP).

 

    • Project Operations Manuals (POMs) and any other relevant documents.

 

  • Implement the project management system including suitable office administration for the Project Office, including appropriate document and records storage systems (SharePoint), communication, procurement, risk, meeting and administration management, ensure project management procedures and systems are accessible to all staff and consultants as relevant, and in consultation with the Deputy Project Manager, ESSM , train staff and consultants as relevant on the use of project management procedures and systems.

 

  • Assist the PM in the implementation of effective internal and external communication protocols as part of the overall project management procedures and systems.

 

  • Assist the PM in leading the coordination and collaboration of the key project stakeholders to ensure timely project implementation to resolve any major implementation hindrances efficiently and effectively.

 

  • Assist the PM to maintain an overview of the TCLC, and associated tribal cooperatives, and benefit share arrangements with a view to ensure that they are functioning according to the Land Lease Agreement and the Implementation Agreement.

 

Project Office Staff and Consultants

 

  • Assist the PM to oversee and manage the Project Office staff plan to ensure the Project Office is appropriately resourced to fulfil its mandate and implementation of the key project activities under its responsibility effectively and efficiently in accordance with the project agreements.

 

  • Work very closely with the Deputy Project Manager, Environmental and Social Safeguards manager to deliver in accordance with their terms of reference.

 

  • Review of Project Office staff and consultant performance in accordance with their contract terms and deliverables. Performance review will be coordinated in consultation with the Deputy Project Manager and Environmental and Social Safeguards Manager. Performance review will be on a six-monthly basis or as otherwise agreed in writing with the PM. 

 

  • Ensure capacity development of all national staff including identification of opportunities to participate in training and workshops for professional development and skills development.

 

  • Assist the PM in the management of the Dam Safety and Advisory Panel member’s contracts to ensure that Concessional Financers’ requirements are adhered to during project implementation. Assist the PM in convening Dam Safety and Advisory Panel meetings, visits and progress meetings in accordance with the project agreements.

 

  • Assist the PM in the management of the Lender’s Technical Advisor (LTA) contract to ensure that Concessional Financers’ requirements are adhered to during project implementation. In accordance with the terms of contract, assist the PM to manage the LTA’s  input, review and advice, quaterly and six-monthly site visits, and facilitate discussions with relevant project stakeholders and CFPs.

 

  • Assist the PM in the management and support the interface between LTA and Tina Hydropower Limited to complete submission of the utilization requests and supporting documents to ensure timely provision of the Technical Advisor’s Certificate in accordance with the Facilities Agreement.

 

Project Reporting

 

  • Assist the PM to ensure the reporting obligations of the Project Office are fulfilled, on time and of the required standard, including establishing an appropriate communications protocol, reporting format and processes for timely delivery. The project reports include overall quarterly progress reports, mid-term review, completion report, and other reports as required by the project agreements. The Project Office is responsible for collecting all relevant reporting inputs to complete the overall quarterly progress report, including those from Tina Hydropower Limited and Solomon Power. 

 

  • Assist the PM to update and implement the Project Operations Manual for the Project Office and coordinate the update and implementation of the Project Operations Manual for Tina Hydropower Limited, as necessary by obtaining consents of the relevant stakeholders and no objection from the relevant CFPs.

 

  • Assist the PM to lead the Project Office and coordinate key project stakeholders’ participation in CFPs periodic implementation support missions.

 

Resource Management

 

  • Assist the PM to ensure transparent, accurate and organized financial management of Project Office.

 

  • Assist the PM in his role to oversee the Project Office budget and be accountable for the funds provided to the Project Office by the CFPs, Solomon Islands Government, and other development partners as relevant.

 

  • Assist the PM to lead preparation of the Annual Work Plan and Budget for the Project Office by closely aligning with the scheduled activities of Tina Hydropower Limited for the Hydropower facility and access road and Solomon Power for the transmission line. Liaise with the Deputy Project Manager, the Environmental and Social Safeguards Manager and the Financial and Commercial advisor and assist the PM to prepare the Annual Work Plan and Budget with all relevant inputs from Project Office staff and consultants. The Annual Work Plan and Budget is due to the relevant parties not later than 30th September of each calendar year.

 

  • Assist the PM in the coordination activities with the Financial and Commercial Advisor to ensure timely preparation of Tina Hydropower Limited Annual Work Plan and Budget for the Hydropower facility and access road.

 

  • Assist the PM to lead the Project Office’s input to Ministry of Mines, Energy and Rural Electrification for its national annual development budget bid for the counterpart financing required to cover the Project Office’s operational costs. The input is to be managed in close coordination with the Deputy Project Manager. The budget bid to reach MMERE by 31st July each year. 

 

  • Assist the PM to ensure that the Project Office funds are audited on an annual basis in accordance with the project agreements.

Specific Deliverables of contract and Key Dates

These deliverables are the responsibility of the Operations Manager with support from Deputy PM and the PM.

Key Deliverables

Timing

Quarterly Project Reports and quarterly Interim Financial Reports (IFRs) by the dates stipulated in the POM.

Quarterly

Annual Work Plan and Budget (AWPB) for the Project Office by the dates stipulated in the POM

Annually

Consolidated AWPB with inputs from THL and Solomon Power, by the dates stipulated in the POM.

Annually

Solomon Islands budget request as per requirement of the Ministry of Mines, Energy and Rural Electrification.

Annually

Financial Statements (FS) for FY2026, FY 2027 and FY 2028 and Completed Audit reports plus opinions from the Office of the Auditor General, well before the deadline in accordance with POM.

Annually

Project Implementation Completion Report by not later than 6 months after the Project Closing Date (PCD), with input from Tina Hydropower Limited and Solomon Power.

6 months post PCD

DSAP meeting minutes.

As required

Steering Committee meeting minutes (quarterly and/or ad-hoc basis). Updated POMs on a six-monthly basis or as may be agreed with the World Bank

Quarterly

 

In addition to the above deliverables the Operations Manager should deliver progress reports on a monthly basis to the PM in the following format and make presentations to the PM, Deputy Project Manager (DPM) and Environmental and Social Safeguards Manager (ESSM) on topics and the learnings:

 

Topics

 

Learnings

Outcome of discussions with the PM, DPM, ESSM

Agreements

PPA, OLA, EPC contract, Settlement Agreement, Side Letter, Implementation Agreement, Government Guarantee Agreement, Financing Agreements between SIG and CFPs

Salient features of all these agreements and their relationship

 

Original Financing

Interest rates during implementation and operation phase, term, grace period, *interest during construction (capitalized and cash), Return of equity during construction

 

 

Additional Financing

 

Break down

 

Risks matrix

Water, Landslide, Seismology, Karst

Risks sharing

 

Capacity vs energy payment

 

Risks to SIG/SIEA

 

Levelized cost of energy

Formula

Explanation of how it is calculated.

FOMR, CICR, WACC

 

Financial Model

Logic, inputs, P&L account, Balance Sheet, Operations and Maintenance, Outages, Plant Factor, Dividends, Term of loans, Weighted Average Cost

 

 

Utilization Requests

Technical Advisor’s Certificate in accordance with OLA (facility Agreement between SIG and THL)

Milestone payments for EPC

Payments to THL for Non-EPC

Escalation payments

Basis for payments; including Annual Work Plan and Budget

 

Royalty payment, Community Benefit sharing fund, lease payments

Learnings from definitions in the Implementation Agreement

Basis of calculations in accordance with the Implementation Agreement and the Lease Agreement plus escalations

 

Biodiversity Action Plan

Upper Tina Catchment and Core Land Area Management Plan

 

 

Socio Impact Management Plan

Baseline survey and midterm survey results

 

 

ESMPs

31 ESMPs- which are assigned to HEC and 6 ESMPS assigned to the PO

Salient features and their inter-relations

 

Gender Action Plan

Key features

Progress

 

Grievance redressal mechanism

Process, Features

Progress

 

Land acquisition

Process, payments, TCLC, Cooperatives, Board Meetings, AGMs

Progress

 

Selection Criteria

This section details the basis upon which selection of the successful candidate will be made.

 

Mandatory Criteria – These criteria must be met in order to be considered for this role. The candidate will possess high levels of personal and working integrity including sense of urgency and attention to detail.

 

Mandatory Criteria

Description

Education/Qualification

A Masters’ qualification in any of the following fields is required: engineering or project management. Project management certification such as PMP would be a plus.

Work Experience

A minimum of five (5) year professional engineering experience and or project management experience in an electricity utility gained on capital project and /or planning for generation, transmission or distribution infrastructure

Leadership Experience

Proven leadership experience in multistakeholder environments, at managerial level. Previous work experience in managing or working at a managerial level in a power facility/electricity utility.

Project Management and or Planning Experience

Experience in establishing well-functioning management units and to manage community expectations and other project risks using various communications platforms and strategies. Proven communication skills as spokesperson for project or company.

Communication Skills

Good communication skills in English and in Pidgin.

Driver’s license/clean police record

Possess a valid driver’s license for SI and a clean police record.

 

Desirable Criteria – These criteria are requirements or qualities that are not mandatory but would be considered beneficial if they are met and will be scored as outlined.

 

Other Criteria

Evaluation Points Allocated (x/100)

Experience relevant to the Project

60 Points

 

 

  1. Prior experience working on infrastructure projects funded by financiers including working with design consultants, contractors, different levels of government.

15

  1. Experience working with communities, landowners consultants for valuation, for land acquisitions, easements for infrastructure projects.

15

 

  1. Ability to proactively manage interfaces, financial/technical and contractual to identify implications and risk to projects early. Prior experience in procurement, financial management, or working with donor-funded/fiduciary systems

15

 

  1. Demonstrate an understanding of the various components of the Tina River Hydropower Development Project including CBSP2, the stages, the financing parties, impact on supply of electricity in Guadalcanal, the benefits to the various stakeholders including the communities in the project area.

15

Experience relevant to the Terms of Reference

40 Points

 

1. Demonstrated capacity to build good working relationships with stakeholders- SIG, Concessional Financing Parties (CFPs), Contractors, Consultants, Communities, Provincial Government.

10

2. Experience in establishing well-functioning project management units and required PMPs, and to manage community expectations and other project risks using various communications platforms and strategies. Proven communication skills as spokesperson for project or company.

15

3.Demonstrate sense of urgency, efficient and effective time management, attention to detail and commitment to meet deadlines.

10

4.Extremely proficient in Microsoft Windows applications, namely Excel, Word and Power Point and data management systems.

5

 

Resources Provided

Provide an outline of items/resources the Project Office will provide to enable delivery of the contract outcomes.

Resources

Equipment (IT/Comms etc) 

The project will provide access to IT equipment, stationery, internet, communications, and related utilities.  The Operations Manager will be fully responsible for the cost of local transportation (to/from the office).

Office Space 

The project will provide the office space, including office furniture.

Documents

MMERE will provide to the Operations Manager all the existing reports and materials related to the Project Funding and administration needs.

 

Selection Process

 

The position will be advertised following the open competitive method prescribed by the World Bank Procurement Regulations for IPF Borrowers 2023 noting that at least 3 qualified CVs would be compared and documented. Applicants will be assessed on (their) Resume as submitted and any supporting documentation.

Applicants who do not pass Mandatory criteria requirement will not be evaluated further.

Applicants passing mandatory criteria requirements will be assigned points on presented Desirable Criteria. 

The Project Management Unit and stakeholders will then interview highest ranked individuals. Interviews will assess the strengths and weaknesses of candidates.

Data provenance

This notice is sourced from WB - World Bank and was originally published on October 1, 2026. Last refreshed 3 days ago. Reference: OP00472594. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Tina River Hydropower Development Project

Tina River Hydropower Development Project has issued 3 procurement notices on BidsFactory, including 1 currently open and 0 awarded contracts. Activity concentrates in Education & Training, Health & Medical, and Construction & Civil Works. All notices are published for Solomon Islands. Notices are distributed via WB - World Bank. Most recent publication: October 1, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by Tina River Hydropower Development Project in Solomon Islands. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Consulting contract in the Infrastructure sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Solomon Islands. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00472594 when communicating with the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Consulting
Eligibility
Individual Consultants
Language
English
Reference
OP00472594

Source

w
world_bank
Official Source

Contracting Authority

Tina River Hydropower Development Project
🇸🇧Solomon Islands
Project: P161319

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.