Appendix (Obihiro City Public Notice No. 211)
1. Project Number: 1
2. Work Overview:
Project Name: Installation of Delineator Posts
Project Location: Fuji-cho Nishi 3-4 sen 23-go
Work Content: Installation of 11 delineator posts, removal of 12 posts, removal of structures (1 lot), temporary work (1 lot)
3. Estimated Price (including tax): ¥1,771,000
4. Procurement Method: Individual construction
5. Eligibility Requirements:
Work Category: Road appurtenance construction
Grade: A
Location: Head office located in Obihiro City.
Construction Experience: Experience as prime contractor for road appurtenance construction. (Work completed and delivered after April 1, 2011). (If using construction experience from a joint venture, the share ratio must be 20% or more).
Technician: Not applicable.
Designer of this project: Not applicable.
6. Intention to Participate in Bidding: Confirmation of Expression of Intent to Participate in Bidding required.
7. Bid Participation Qualifications: Specific Construction Project Joint Venture Agreement required.
Other Required Documents: Statement of construction experience for similar or analogous work required.
8. Documents other than bid form required: Construction cost breakdown required (only for the lowest bidder after bidding).
Refer to the public notice.
9. Method of Determining Successful Bidder: The bidder who submits the lowest bid within the scope of the estimated price will be the successful bidder.
10. Matters Concerning Contract Conclusion:
Contract Conclusion Deadline: Within 7 days from the date of receiving the notice of successful bid determination (if the 7th day is a Saturday, Sunday, or holiday, then the next business day). If the contract is not concluded by the deadline, the successful bid will be canceled.
Contract Security: Waived.
11. Advance Payment, Intermediate Advance Payment, and Partial Payment:
Advance Payment: For contracts of ¥2,500,000 or more, an advance payment of up to 4/10 of the payment limit will be made upon request. For contracts of ¥2,500,000 or more and a construction period of 90 days or more that meet the city's requirements, an additional advance payment of up to 2/10 of the contract amount can be made in addition to the advance payment. However, it cannot be combined with partial payment.
Intermediate Advance Payment: Not applicable.
Partial Payment: For contracts of ¥10,000,000 or more, partial inspection will be conducted for every ¥5,000,000 exceeding the completed work amount, and a partial payment of up to 9/10 of the amount can be made. However, partial payment is limited to 2 times.
12. Applicable Projects: This project is subject to the "Law Concerning the Recycling of Materials in Construction Work" (Construction Recycling Law).
13. Construction Supervisor: Road Maintenance Section
Notes:
(1) Refer to the main text of the public notice and the bid explanation document.
(2) Design documents can be downloaded from the website.
(3) This project is subject to the "Administrative Procedures for Loan Utilization Utilizing Assignment of Claims on Public Works Contract Payments and the Scheme for Strengthening Regional Construction Business Management and Assignment of Claims."
(4) This project is subject to "Work-from-Home 2 Days a Week" construction. If the contractor wishes to implement "Work-from-Home 2 Days a Week," they must consult with the client after the contract is concluded. If an agreement is reached, full "Work-from-Home 2 Days a Week" (Saturdays and Sundays) and monthly "Work-from-Home 2 Days a Week" will be implemented. Even if monthly "Work-from-Home 2 Days a Week" cannot be achieved, "Work-from-Home 2 Days a Week" must be implemented throughout the period.
Design Document
Project Name: Installation of Delineator Posts
Special Specifications
1. Scope of Application
This project shall be executed in accordance with the "Hokkaido Construction Department Civil Engineering Work Common Specifications (Latest Version)" (hereinafter referred to as "Common Specifications"). In cases where items are not described in the "Design Documents," "Common Specifications," or Special Specifications, relevant guidelines, instructions, and standards shall be followed, and consultation with the construction supervisor shall be conducted as needed. If there are any doubts or unclear points during construction, consultation shall be conducted similarly. In addition, compliance with the "Obihiro City Regulations on Technical Standards for Road Structures and Enforcement Regulations," "Obihiro City Road Mobility Improvement Standards Ordinance," and "Obihiro City Road Sign Dimensions Regulations" is required.
2. Civil Engineering Work Cost Estimation Standards, etc.
(1) This design document is based on the "Civil Engineering Work Cost Estimation Guidelines," "Civil Engineering Work Cost Estimation Standards," "Civil Engineering Work Type Classification Manual," and "Civil Engineering Work Quantity Calculation Manual" established by the Hokkaido Construction Department.
(2) The standards stipulated in the "Civil Engineering Work Cost Estimation Standards" are handled as follows:
① The distinction between mechanical and manual labor construction methods is determined from the design drawings, etc., but mechanical construction is used unless mechanical construction is difficult.
② Where standard construction methods or standard equipment are defined in each standard, they are used for cost estimation unless otherwise specified in the special specifications, etc.
③ The above ① and ② do not restrict the contractor's voluntary construction.
However, if it is difficult to comply due to site conditions, design changes will be made as necessary.
(3) Matters stipulated in the "Civil Engineering Work Type Classification Manual" will be subject to design changes as necessary if the content specified in the "Specifications/Description" column changes.
3. Approximate Quantities
(1) Quantities listed in the "List of Quantities to be Treated as Approximate" may be subject to design changes as necessary.
(2) In this project, the contractor shall be responsible for preparing design change documents (design change drawings and calculation of work quantities).
(3) For work involving approximate quantities, create construction drawings and quantity calculation sheets, consult thoroughly with the construction supervisor, and record the meeting progress in the construction consultation log.
(4) Standard drawings show standard construction drawings or completed work, and the contractor shall implement them after thorough verification according to the site conditions, etc.
(5) If a change is necessary, consult with the construction supervisor promptly.
(6) The quantities of temporary work listed in the "List of Quantities to be Treated as Approximate" are calculated based on standard construction methods. Items newly required due to site conditions may also be treated as approximate quantities.
(7) Approximate quantities of construction by-products:
① Demolition/Crushing/Transportation Costs:
1. Volume calculated by measuring the dimensions of structures, etc. Submit measurement photos and consult.
2. If measurement of structure dimensions is difficult and volume/weight calculation is impossible (e.g., irregular shape of structures), calculate by converting from the quantity in the "Summary of Industrial Waste Management Slips (Manifests)" using unit volume mass.
3. For work categories other than ② where structure dimensions are not measured, calculate by converting from the quantity in the "Summary of Industrial Waste Management Slips (Manifests)" using unit volume mass, but no changes will be made for excessive completed work.
4. Pavement Thickness Measurement Method: For each pavement layer, measure the pavement thickness at one location per 20m of construction length. If the construction length is less than 60m, measure at 3 locations and calculate the average value. When measuring pavement thickness, measure the pavement directly. If there is a difference from the design in the pavement area to be removed and a change is necessary, conduct an on-site inspection with the construction supervisor before construction, submit change documents, and consult.
② Disposal Costs:
1. Submit the "Summary of Industrial Waste Management Slips (Manifests)" and consult. The determination of approximate quantities will be based on the disposal quantity, but no changes will be made for excessive completed work.
Submit Industrial Waste Management Slips (Manifests) and measurement certificates if instructed by the construction supervisor.
4. Reference Drawings
Reference drawings show the construction methods, materials, etc., assumed by the client, and the items shown therein do not restrict the contractor's voluntary construction.
However, if it is difficult to comply due to site conditions, consult with the supervisor as necessary. Note that this does not constitute a change for an excessive plan in the design.
5. Estimation Information
The estimation standard date and estimation construction period, which are the basis for calculating the estimated price for this project, are as follows:
(1) Reiwa Year Month Day to Reiwa Year Month Day
(2) The estimation construction period includes preparation time ( days), cleanup time ( days), as well as rain delay rates, holidays, etc. (including Sundays, holidays, summer vacation, year-end and New Year holidays, and all Saturdays within the work period).
6. Specification of Construction Conditions
7. Creation of Construction Plan
(1) Upon contract conclusion, the contractor shall promptly examine the public design documents, conduct basic surveys of the site, file notifications with relevant organizations, and consult with the construction supervisor.
(2) For items requiring condition specification as described in the special specifications, confirm whether they fully match the site, etc., and describe them in detail in the construction plan, including drawings (manager's name, company name, address, distance, acceptance conditions, etc.). If any discrepancies are found between the design documents and the site, report immediately to the construction supervisor and consult as necessary.
(3) Describe the construction method, including specific work procedures, specific work methods, and matters to be noted for this project, in accordance with the Common Specifications. (Excavation method, compaction, leveling method, structure construction method, work removal method, temporary work method, etc.)
(4) Describe the completed work management standards, quality management standards, and photo management standards in accordance with the Common Specifications, as well as internal management standards. Also, indicate the planned locations where these will be implemented (e.g., measurement points).
(5) For quality management standards, except for small-scale projects, ensure all relevant items are met. Describe test methods, quality management standard items, and implementation items after consulting with the construction supervisor.
(6) Describe stage confirmations and inspections specified in the special specifications and common specifications. Also, describe other stage confirmation items after consulting with the construction supervisor.
(7) Describe the status of public land such as roads and rivers, and include construction precautions to prevent road facilities, etc., from exceeding the road boundaries and encroaching on private land.
(8) Obtain road use permission from the relevant police station in accordance with Article 77, Paragraph 1 of the Road Traffic Act and attach it to the construction plan.
8. Traffic Regulation and Safety Measures
This project shall be carried out in accordance with the following Road Traffic Act provisions. The following periods and sections represent the maximum extent and efforts should be made to minimize them during construction.
(1) Sidewalk temporary closure, one-lane alternating traffic, reduction of roadway width, reduction of sidewalk width, work zone closure.
(2) Number of personnel assigned: ( ) people. Relief personnel: ( ) people. In construction sites requiring the assignment of security guards certified by the Public Security Commission in urban areas (densely populated areas and quasi-densely populated areas) and on routes designated by the Public Security Commission, at least one traffic control security guard certified under the Security Services Act (Class 1 or 2) must be assigned. Include this in the construction plan. (Security guard roster must comply with the requirements of Article 45 of the Security Services Act and Article 66, Paragraph 1 of the Enforcement Regulations.) If changes occur in the traffic control security guard assignment plan due to consultations with local residents, police, or coordination with related projects, consult with the construction supervisor. Describe the traffic handling plan, including the assignment of traffic control security guards, in the traffic management section of the construction plan as follows:
1. Create a traffic handling plan after confirming the local traffic conditions, etc.
2. If changes to the traffic handling plan are requested during permission applications to the traffic administrator, consult with the construction supervisor.
3. Ensure the current roadway width is secured after each day's work, and implement safety measures to avoid obstructing general traffic.
9. Handling of Property Boundary Markers (Stakes)
(1) Property boundary markers (stakes) refer to all boundary markers (stakes), including road boundaries (Ministry of Land, Infrastructure, Transport and Tourism, Hokkaido, Obihiro City), as well as private land boundaries.
(2) Before commencing work, the contractor shall conduct an on-site survey, confirm property boundary markers (stakes) based on the boundary stake meeting confirmation document from the survey, and report. If new stakes are found during construction, the contractor shall conduct a meeting with the landowner, etc., and create a boundary stake meeting confirmation document themselves.
(3) Upon completion of the work, the contractor shall conduct a meeting with the landowner, etc., and fill in the contents in the boundary stake meeting confirmation document.
(4) If property boundary markers (stakes) are relocated, damaged, or lost due to construction work, the contractor shall be responsible for restoring them. Such work must be performed by a qualified person, and the consent of the construction supervisor must be obtained.
10. Stage Confirmation Items
Stage confirmation will be carried out at the following times or for the following work categories.