Tenders/Preparation of a Road Safety Plan (RSP) for Public Electric Bus Operations in Greater Cairo.
ClosedšŸ‡ŖšŸ‡¬EgyptConsulting

Preparation of a Road Safety Plan (RSP) for Public Electric Bus Operations in Greater Cairo.

This tender is closed

The submission deadline for this tender has passed. It is no longer accepting bids.

About This Opportunity

Request for Expression of Interest | Project: Greater Cairo Air Pollution Management and Climate Change Project | Method: Consultant Qualification Selection | Ref: EG-EEAA-542759-CS-CQS

This is a consulting contract in the construction and civil works and transport and logistics sectors. Located in Egypt, Arab Republic of, Asia, this opportunity is open to firms and consortiums.

Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the construction and civil works sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage.

Description

Project: Greater Cairo Air Pollution Management and Climate Change Project

REQUEST FOR EXPRESSIONS OF INTEREST ā€œREOIā€

(CONSULTING SERVICES – FIRMS SELECTION)

Arab Republic of Egypt

GREATER CAIRO AIR POLLUTION MANAGEMENT AND CLIMATE CHANGE "GCCC" PROJECT

Project ID: P172548

Assignment Title: Preparation of a Road Safety Plan (RSP) for Public Electric Bus Operations in Greater Cairo

Reference No.: EG-EEAA-542759-CS-CQS

I. Background

As part of the ā€œSustainable Development Strategy (SDS): Egypt Vision 2030ā€ the country committed to halving its fine particulate matter (PM10) air pollution by 2030. Significant improvements have been made towards that goal in recent years. In fact, Cairo’s PM10 concentration fell by about 25 percent over the past decade. Despite these improvements, the city’s pollution levels are still several times the WHO recommended concentrations and higher than national guidelines taking as these high levels are taking their toll on the health and quality of life of the population, in particular poor people.

In response to this situation, the approved World Bank-financed Greater Cairo Air Pollution Management and Climate Change Project aims at reducing air emissions from critical sectors and increase resilience to air pollution in Greater Cairo. The Project aims more specifically at reducing air emissions which is a key step toward the reduction of pollution concentrations and improvement of air quality. The Project will focus on the two main sources of air pollution: open burning of solid waste and vehicle emissions and will geographically cover Greater Cairo (i.e., Cairo, Giza and Qalyoubia Governorates --GC); and will include four main components aiming at: (i) enhancing the air quality decision support system in Egypt; (ii) improving Solid Waste Management services; (iii) reducing air and climate pollutants from vehicle emissions; and (iv) furthering stakeholder engagement, awareness and communication.

Component 3 Vehicle Emission Reduction

Under this component, the Project will support activities aimed at reducing vehicle emissions from the public transport sector. 100 electric buses and the equipment required to operate and maintain these buses are procured. To integrate the electric buses, the project will retrofit existing bus depots with charging stations, upgraded power supply, and safety equipment. The activities will support the Cairo Transport Authority (CTA), which will operate the electric buses. The Project will upgrade facilities at CTA, including the retrofitting of existing bus depots with electric charging stations, power supply and related safety equipment; training CTA staff such as bus drivers and mechanics on operating and maintaining the new e-equipment. The Ministry of Environment, through the Egyptian Environmental Affairs Agency (EEAA), is the project’s borrower, while CTA is the beneficiary responsible for implementation. By investing in e-bus technology, modernizing infrastructure, and strengthening operational capacity, this component plays a key role in Egypt’s green transport transition, reducing emissions and setting a model for future urban mobility.

The Government of Egypt, through the Ministry of Environment and in collaboration with the Ministry of Transport (MoT) and Cairo Transport Authority (CTA), is implementing the "Greater Cairo Air Pollution Management and Climate Change Project". This project supports the transition toward a low-emission, safe, and sustainable public transport system by financing 100 electric buses for CTA and 20 for MoT.

In compliance with World Bank Environmental and Social Standards (ESS1, ESS2, ESS4, and ESS10), the Project Coordination Unit (PCU) is seeking to recruit a qualified Consultant to develop a comprehensive Road Safety Plan (RSP). This plan will identify road safety risks, propose mitigation measures, and establish operational protocols to protect passengers, drivers, and other road users.

II. Assignment Description

The objective of this assignment is to assess current infrastructure, institutional, and operational conditions for e-bus operations and develop a comprehensive Road Safety Plan (RSP) meeting both World Bank standards and national laws.

The scope of work includes six main tasks:

  1. Inception and Review: Methodology and policy review.
  2. Baseline Assessment: Mapping high-risk corridors and evaluating current safety performance.
  3. Risk Identification and Evaluation: Comprehensive Road risk assessment for all users.
  4. Development of the RSP: Creating risk mitigation measures, operational safety systems, and monitoring frameworks.
  5. Consultation and Validation: Presenting the draft to stakeholders and organizing a validation workshop.
  6. Finalization and Capacity Building: Delivering the final roadmap and training package.

The total estimated duration of the assignment is 4 months.

III. Qualification Requirements and Shortlisting Criteria

The Ministry of Environment now invites eligible consulting firms (ā€œConsultantsā€) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.

The shortlisting criteria is:

#

Shortlisting Criteria

Percentage

1

Relevant Experience: Experience in road safety planning, including understanding of the local context and stakeholder engagement approach.

40%

2

Methodology and Workplan: Proposed approach to the tasks outlined in the TOR.

30%

3

Key Expert Qualifications: Demonstrated experience of the proposed team as follows: Lead Road Safety Consultant (14%), OHS Consultant (8%), and Social Development Consultant (8%).

30%

Minimum qualifying Mark : 70%

Required Team Composition:

  • Lead Road Safety Consultant: Advanced degree in transport engineering/road safety with minimum 10 years of experience.
  • OHS Consultant: Advanced degree in Engineering with minimum 8 years of experience in OHS management.
  • Social Consultant: Advanced degree in Social Sciences with minimum 8 years of experience in social risk management and stakeholder engagement.

IV. Selection Process

The Consulting Firm will be selected in accordance with the World Bank’s Procurement Regulations. The selection method will be Consultant’s Qualification-based Selection (CQS) using Lump-Sum Contract.

V. Submission

Expressions of interest must be delivered in a written form to the address below by e-mail by not later than Tuesday June 9th. 2026 at 14:00 (CLT).

Greater Cairo Air Pollution Management and Climate Change "GCCC" Project

Attn: Dr. Mohamed Hassan, Project Coordinator and;

and Ms. Heba Elkarkari, Project Procurement Consultant

Address: 15 S El Tawfik Building, El Fustat El Gedida,

Old Cairo, Cairo - Egypt

Tel: +20 1128333019

E-mail: heba.elkarkari@gccceg.com , mohamed.hassan@gccceg.com

The detailed Terms of Reference ā€œTORā€ including the scope of work and deliverables for the assignment is found below.

Terms of Reference (TOR)

Preparation of a Road Safety Plan (RSP) for Public Electric Bus Operations in Greater Cairo

1. Background

The Government of Egypt, the Ministry of Environment in collaboration with Ministry of Transport (MoT) and Cairo Transport Authority (CTA), is implementing a transition toward a low-emission, safe, and sustainable public transport system supported by the world Bank’s Greater Cairo Air Pollution Management and Climate Change (GCCC) Project. The Project is financing: 100 electric buses and Ameriyah Depot retrofitting works for CTA operations, and 20 electric buses for MOT operations.

In compliance with World Bank Environmental and Social standards ESS1 - Assessment and Management of Environmental and Social Risks and Impacts, ESS2 – Labor and Working Conditions, ESS4 – Community Health and Safety mainly and ESS10 – Stakeholder Engagement and Information, the GCCC project is preparing a Road Safety Plan (RSP) to support safe operation, maintenance, and community interaction of the electric bus fleet within the Greater Cairo Metropolitan Area.

This RSP will identify road safety risks, propose mitigation measures, and establish operational protocols to protect passengers, drivers, pedestrians, and other road users.

The GCCC Project Coordination Unit (GCCC - PCU) is seeking to recruit a qualified Consultant to undertake the activities specified under these Terms of Reference.

2. Objective of the Assignment

To ensure the sustainability of the investments in the electric bus fleet and achieve the objective of the Greater Cairo Air Pollution Management and Climate Change Project to reduce air and carbon emissions, facilitating the safe e-bus operations by the beneficiaries of the GCCC investments, CTA and MOT.

The assignment includes assessing the safety aspect of current infrastructure, institutional, regulatory, and operational conditions in operating e-buses, and developing a comprehensive Road Safety Plan (RSP) for public e-bus operations meeting World Bank ESS1, ESS2, ESS4 and ESS10 and national road safety laws, policies, and strategies.

The RSP will serve as a practical management tool for operators, regulators, and development partners to ensure systematic risk prevention and continuous improvement in road safety performance. An RSP outline is annexed to this TOR.

A national consultant is required for this assignment due to the need for extensive knowledge of the national road safety context, institutional setup, local transport systems and key stakeholders.

3. Scope of Work

The consultant shall undertake the following tasks:

Task 1: Inception and Review

• Conduct a review of:

o Existing transport safety policies and regulations in Egypt;

o Procedures, accident statistics, and safety records of the operators of the e-buses the GCCC project is financing (CTA and MOT, ā€œOperatorsā€);

o Existing plans/strategies/projects/initiatives to improve road and bus operational safety of the Operators;

o Relevant World Bank standards, including ESS4 guidance notes.

• Prepare an Inception Report with a methodology, work plan, data collection strategy, and stakeholder engagement approach.

Task 2: Baseline Assessment

• Assess the Operators’ current road safety performance of electric and conventional bus operations, including:

o Infrastructure supporting the operation of e-buses financed by the GCCC project;

o Operational environment of the GCCC-financed e-buses (pedestrians, surrounding vehicular traffic, weather patterns, etc.)

• Map high-risk corridors, black spots, and pedestrian conflict areas.

• Review the electric vehicle technology (e.g., braking, battery systems), driver safety behavior, infrastructure, and traffic management conditions.

• Identify institutional responsibilities and capacity gaps within operators and government agencies.

The Consultant is expected to conduct field visits to the corridors, depots, and operational facilities related to the e-bus operation by the Operators.

Task 3: Risk Identification, Analysis and Evaluation

• Conduct a comprehensive road risk assessment, including risks to:

o Passengers and pedestrians;

o Other road users (e.g. motorcyclists, private vehicles, cyclists);

o Bus drivers and staff;

o Communities near depots, charging stations, and routes;

o Risks identification shall include assessment of chargers and batteries risks.

• Conduct a gap analysis of the bus operational regulations and practices and the identified risks;

• Develop a risk register and risk ranking matrix (likelihood vs. severity).

Task 4: Development of the Road Safety Plan (RSP)

Prepare a structured RSP as summarized below, designed in a way to maximize synergies across the Operators while catered to each operator’s unique risk profile.

• Policy framework and institutional arrangements.

• Risk mitigation and control measures (engineering, enforcement, and emergency response).

• Operational safety management system for electric bus fleets (e.g. in-vehicle monitoring system – IVMS – Batteries and chargers’ operation).

• Driver training (include defensive driving accreditation) and fitness management programs.

• Drivers and operators' health and safety, including substance testing.

• Drivers and operators working conditions, including having a grievance mechanism for workers.

• Community safety and stakeholder engagement strategy, including grievance mechanism.

• Operationalize the gender and accessibility features that were included in the design of the e-buses.

• Ensure full enforcement of the national framework (The Ministerial Decree of the Minister of Transport No 237/2021) related to the code of conduct of operators and passengers, including women safety and anti-harassment measures.

• Monitoring and evaluation framework with measurable Key Performance Indicators (KPIs).

• Emergency preparedness and response procedures.

• Accident reporting and Root Cause Analysis

• Implementation plan with budget and timeline

• Further recommendations for the consideration of the beneficiaries.

• The Consultant shall develop practical implementation tools including SOPs, templates, and operational guidelines to support immediate adoption of the RSP

Task 5: Consultation and Validation

• Present the draft RSP to GCCC PCU and key stakeholders including the Operators, traffic police, local authorities, and bus operators, and the World Bank.

• Organize a validation workshop to collect feedback and incorporate recommendations. The consultant will be responsible for the workshop logistics (venue, invitations and materials).

Task 6: Finalization and Capacity Building

• Revise the RSP incorporating comments from stakeholders and development partners.

• Prepare an implementation roadmap including capacity building activities for the Operators, designed in a way to maximize synergies and cross-learning among the Operators.

4. Deliverables Schedule and Duration

Deliverable

Description

Timeline from Start

Inception Report

Methodology, work plan and schedule, data collection plan, stakeholder engagement approach, Baseline Assessment, etc.,

2 Weeks from contract signature

Draft Road Safety Plan

Complete plan in alignment with WB Environmental and Social Standards

12 weeks from contract signature

Final Road Safety Plan & Implementation roadmap

Final report and training package

16 Weeks from contract signature

- The deliverables should be packaged in a manner friendly for review by the Operators respectively (e.g., separate packages for CTA, MOT, and the GCCC Project, depending on the contents).

- Total estimated duration: 4 months

5. Team Composition and Qualifications

Lead Road Safety Consultant

• Advanced degree in transport engineering, road safety, or related field.

• Minimum 10 years of experience in road safety management and planning.

• Proven experience preparing RSPs compliant with international standards.

• Strong understanding of electric bus technologies and urban transport systems.

• Expertise crash analysis, traffic design, and road audits.

• Experience with fleet management and driver safety systems.

• Familiarity with ESS1, ESS2, ESS4 and ESS10, and community health and safety standards.

• Familiarity in using spatial risk mapping and performance monitoring.

OHS Consultant

• Advanced university degree in Engineering or a related field.

• Minimum 8 years of professional experience in occupational health and safety management, preferably in transportation, or infrastructure.

• Proven experience in conducting OHS risk assessments, hazard identification, and development of mitigation measures for transport operations, depots, and maintenance facilities.

• Good experience in World Bank Environmental and Social Standards.

• Familiarity with national labor laws, occupational safety regulations, and international practices.

• Experience delivering OHS training and capacity-building programs.

• Excellent spoken and written English language skills is required.

Social Consultant

• Advanced university degree in Social Sciences, Sociology, or a related field.

• Minimum 8 years of professional experience in social risk management, stakeholder engagement, or social assessment for infrastructure or transport projects.

• Experience in National law and World Bank Environmental and Social Standards.

• Experience in assessing community safety risks, including pedestrian safety, vulnerable road users, gender-based risks, accessibility for persons with disabilities, and public transport users.

• Excellent spoken and written English language skills is required.

6. Reporting and Coordination

The GCCC PCU will facilitate access to relevant data and stakeholders. The consultant will report to the GCCC Project Coordination Unit (PCU) and coordinate closely with:

• Cairo Transport Authority (CTA)

• Ministry of Transport (MoT)

All reports shall be delivered in English and Arabic.

7. Deliverable Format and Submission

• Reports in editable electronic format (Word, Excel, GIS shapefiles, PDF).

• Maps and graphics must be georeferenced and compatible with Cairo’s GIS database.

• Draft and final reports to be reviewed and approved by GCCC PCU.

8. Duration and Level of Effort

This assignment will be implemented under a Lump-Sum Contract. The Consultant shall be responsible for delivering all outputs described in these ToRs for the agreed contract price. The proposed staffing and time-input presented in the Consultant’s proposal shall be considered indicative for planning purposes; however, payments will be linked exclusively to the acceptance of deliverables as defined in this ToR.

The assignment is expected to require approximately 16 weeks (4 months), The estimated level of effort for this assignment is approximately 60 person-days, which is provided only as guidance for proposal preparation. The Consultant may propose a different level of effort if justified in the methodology.

9. Payment Schedule

Payments will be made upon acceptance of deliverables, as follows:

Deliverable

Payment (%)

D1: Inception Report

20%

D2: Draft Road Safety Plan

30%

D3: Final Road Safety Plan & Implementation roadmap

50%

Payments will be made upon review and written acceptance of deliverables by the GCCC PCU/ committee. The consultant should consider the review time in the proposed timeline (5 working days for D1, 10 working days for D2 & D3 respectively).

10. Confidentiality and Data Ownership

All data, materials, and reports produced under this consultancy will be the property of GCCC PCU and shall not be shared or published without written consent.

The Consultant shall not have any conflict of interest with other assignments related to the procurement, supply, or operation of the electric bus fleet financed under the GCCC Project.

ANNEX 1: Proposed Outline of the Road Safety Plan

1. Introduction and Objectives

• Purpose of the RSP:

Establish measures to prevent and mitigate road traffic risks associated with the operation of public electric buses in Greater Cairo.

• Scope:

Covers all bus operations, routes, depots, terminals, and associated infrastructure.

• Alignment:

The plan is aligned with:

o World Bank ESS4 – Community Health and Safety

o World Bank ESS2 – Occupational Health and Safety

o Egyptian transport safety regulations and Cairo Transport Authority (CTA) requirements.

2. Regulatory and Institutional Framework

• National legislation:

o Egyptian Traffic Law No. 66/1973 and amendments

o Ministry of Transport safety regulations

o Environmental Law No. 4/1994 (air/noise impacts)

o Labor law No. 14/2025

• International standards:

o World Bank ESS1, ESS2, ESS4 and ESS10

o WHO Global Road Safety Guidelines

• Institutional responsibilities:

o Public bus operators (fleet management, compliance)

o Greater Cairo Transport Regulatory Authority (GCTRA)

o Ministry of Transport and local traffic police

3. Roles and Responsibilities

• Operator-level:

o Safety Manager (RSP implementation lead)

o Fleet Operations Supervisors

o Drivers and Maintenance staff

• Government-level:

o Oversight and compliance monitoring (GCTRA, MoT)

• Stakeholders:

o Passengers, pedestrians, local communities, schools near routes

4. Risk Identification and Assessment

• Baseline analysis:

o Mapping of accident-prone areas (ā€œblack spotsā€) along the corridors of e-bus operations

o Assessment of pedestrian and cyclist interaction points

o Assessment of drivers’ safety and operational competence in Electric Bus Operations

• Risk sources:

o Driver behavior (fatigue, speeding, distraction, uncertified, medical unfitness)

o Electric bus technology (battery hazards, braking systems failures, electrical or software malfunctions)

o Maintenance Practices (inadequate preventive maintenance, insufficient technical capacity, lack of spare parts or diagnostic tools)

o Road infrastructure conditions

o Fleet management and operations (lack of real-time monitoring system, communication)

o Weather and urban congestion

o Data and monitoring systems (absence of reliable accident data for electric bus operations, lack of digital monitoring tools for driver performance and vehicle condition

o Institutional and Regulatory Framework (weak enforcement, regulatory gaps on e-bus operations and battery disposal, fragmented coordination)

• Risk ranking:

Matrix identifying likelihood and severity (High/Medium/Low).

5. Mitigation and Control Measures

• Fleet management:

o Preventive maintenance schedule (battery systems, brakes, tires)

o GPS-based speed monitoring and route tracking (IVMS)

• Driver behavior and training:

o Mandatory defensive driving and eco-driving courses (Accredited)

o Periodic and pre-employment competency and health checks (including vision, fatigue, cardiovascular, neurological, and musculoskeletal conditions, as well as drug and substance use)

o Incentive and disciplinary system for safety compliance and enforcement

• Operational safety systems:

o Installation of telematics and collision avoidance systems

o Emergency response equipment onboard

o Effective communication protocol

• Public and community safety:

o Safe bus stop design (lighting, accessibility, separation from traffic)

o Public awareness campaigns for pedestrians and passengers

o Hotline for receiving complaints on drivers' poor performance

6. Emergency Preparedness and Response

• Emergency Response Plan (ERP):

o Procedures for accidents, fires, battery malfunctions, and passenger injuries

o Coordination with local emergency services (police, ambulance, fire)

o Training and simulation drills for staff

o Post clear safety instructions inside the buses for passengers

• Incident reporting and learning:

o Standard forms and digital platforms for reporting accidents/near misses

o Root cause analysis and feedback loops

7. Monitoring and Evaluation

• Key performance indicators (KPIs):

o Accident rate per 100,000 km

o Number of traffic violations per driver

o Number of emergency incidents per month

• Monitoring tools:

o Telematics and dashboard analytics

o Periodic audits and road safety inspections

• Review frequency:

o Monthly internal review

o Annual third-party audit aligned with World Bank requirements

8. Stakeholder Engagement and Communication

• Engagement strategy:

o Consult local communities along routes on safety issues, specially targeted vulnerable groups such as children, women and disabled people

o Establish hotline and feedback channels for passengers

• Disclosure:

o Publicly accessible summary of safety performance (e.g., annual report)

• Coordination:

o Collaboration with Cairo traffic police, municipalities, and NGOs

9. Training and Capacity Building

• Target groups: Drivers, maintenance teams, dispatchers, managers

• Training content:

o Road safety awareness, emergency handling, EV-specific safety

o First aid and passenger safety

o Gender and disability sensitivity in transport safety

• Evaluation:

o Certification system and refresher courses

10. Budget and Resources

• Safety investments:

o Telematics and monitoring systems

o Medical checkups and drug testing

o Training and awareness materials and certifications

o Safety audits and community campaigns

• Funding sources:

o Operator’s operational budget

o Public-private partnerships or donor-funded initiatives

11. Reporting and Continuous Improvement

• Internal reporting: Monthly and quarterly reports to management

• External reporting: Annual summary to World Bank and regulatory authorities

• Continuous improvement:

o Lessons learned integrated into RSP updates

o Benchmarking against international best practices

12. Annexes

• Annex A: Road Safety Plan Outline

o Baseline Safety Assessment Report

o Road Safety Risk Register, Analysis and Evaluation

o Final Road Safety Implementation Toolkit

o Stakeholder Consultation Report

• Annex B: Road Risk Assessment Matrix

• Annex C: Driver Safety Code of Conduct

• Annex D: Emergency Response Flowchart

• Annex E: Training Curriculum

• Annex F: Monitoring Checklist

Data provenance

This notice is sourced from WB - World Bank and was originally published on May 19, 2026. Last refreshed 154 days ago. Reference: OP00445789. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Greater Cairo Air Pollution Management and Climate Change Project

Greater Cairo Air Pollution Management and Climate Change Project has issued 18 procurement notices on BidsFactory, including 0 currently open and 10 awarded contracts. Activity concentrates in Environment & Climate, Construction & Civil Works, and Architecture & Engineering Services. Notices are distributed via WB - World Bank. Most recent publication: October 21, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by Greater Cairo Air Pollution Management and Climate Change Project in Egypt, Arab Republic of. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Consulting contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Egypt, Arab Republic of. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00445789 when communicating with the contracting authority.

Is this tender still accepting bids?

No — the submission deadline has passed. The notice is archived for reference. To find open opportunities, use the filters above to browse current tenders.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Contract Type
Consulting
Eligibility
Firms / Consortiums
Language
English
Reference
OP00445789

Source

w
WB - World Bank
Multilateral

Contracting Authority