Preparation of an Energy Sector Investment Program for the Marshall Islands
About This Opportunity
Request for Expression of Interest | Project: Renewable Energy Generation and Access Increase Project | Method: Consultant Qualification Selection | Ref: MH-MEC-563965-CS-CQS
This is a consulting contract in the energy and power and finance and banking sectors. Located in Marshall Islands, Asia, this opportunity is open to firms and consortiums.
Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the energy and power sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Renewable Energy Generation and Access INcrease Project (REGAIN)
Grant No.: E331-MH
REGAIN Project
Reference No. MH-MEC-563965-CS-CQS
November 23, 2026
The Government of the Republic of the Marshall Islands (GRMI) has received financing from the International
Development Association (IDA) (the “Bank”) in the form of a grant (hereinafter called “the Grant”), in the
amount of US$60 million, toward the cost of the Renewable Energy Generation and Access Increase (REGAIN)
Project (P181250), approved and effective as of December 13, 2024, with a closing date of September 30, 2030.
The Marshalls Energy Company (MEC), as Employer and implementing agency, intends to apply a portion of
the proceeds of the Grant to eligible payments under a contract for consulting services to prepare and support an
implementation plan for renewable energy, energy efficiency and e-mobility under the Energy Act, 2025 and the
National Energy Authority Act, 2025, excluding petroleum-sector provisions, under Sub-Component 3.1
(Sector Development Assistance) of the REGAIN Project. The assignment shall be carried out in close
coordination with the newly established National Energy Authority (NEA) and shall cover all MEC-served
systems, including Majuro, Ebeye and the outer islands.
The consulting services (“the Services”) comprise proposing activities to be undertaken in the short, medium,
and long term and undertaking them to strengthen the capacity of key energy sector stakeholders by focusing on
regulation, target setting, monitoring tools, dissemination of progress, feedback, and course correction to
promote security, safety, reliability, and sustainability of energy supply (excluding petroleum) in RMI as per the
provisions of the EA 2025 and aligned with the National Energy Authority Act, 2025. Services include, among
others:
• Diagnostic review of the Electricity Sector (in particular RE, EE and E-Mobility) of the Marshall Islands;
• Strategic review of the applicable RMI’s electricity sector-related international and national commitments
and targets;
• Propose a strategy for addressing the identified gaps;
• Assessing the Institutional structure and the manpower requirements of the Energy sector;
• Monitoring, Database and Reporting Framework for RE;
• Electricity tariff review and recommendations, building on MEC’s existing tariff methodology and
extending it to Ebeye; and
• Addressing the recommendations by preparing, revising, or aligning the policies, regulations, codes,
guidelines, and other instruments required to give effect to the relevant provisions of the Energy Act, 2025
and the National Energy Authority Act, 2025, excluding petroleum-sector provisions.
The assignment is structured as a lump-sum contract with an estimated duration of 9 months, with an expected
start date in January 2027. The selected firm will nominate a multidisciplinary team, including the Key Experts
described in the attached TOR, and will report to MEC, coordinating closely with NEA, the World Bank, and
other relevant stakeholders.
The Terms of Reference (TOR) for the assignment are attached to this Request for Expressions of Interest.
MEC now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services.
Interested Consultants should provide information demonstrating that they have the required qualifications and
relevant experience to perform the Services.
The shortlisting criteria, as set out in Section 10 of the attached TOR, are:
1. Experience preparing energy-sector legal, policy and regulatory frameworks, or implementation plans
for energy legislation, including regulations, codes and licensing (35 points)
2. Experience in electricity tariff, cost-of-service and revenue-requirement studies for small island or multi-
system utilities, preferably with high renewable energy penetration (25 points)
3
3. Experience in the Pacific or other Small Island Developing States (25 points)
4. Technical and managerial capability of the firm, including core business, years in business, organization
and availability of relevant expertise (15 points)
The Consultant shall demonstrate availability of qualified experts in energy policy and regulation (renewable
energy, energy efficiency and e-mobility), legal and regulatory drafting, electricity tariffs and utility finance,
and stakeholder engagement. Key Experts will not be evaluated at the shortlisting stage.
The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16, and 3.17 of the World
Bank’s “Procurement Regulations for IPF Borrowers” September 2025 (“Procurement Regulations”), setting
forth the World Bank’s policy on conflict of interest. In addition, please refer to the following specific
information on conflict of interest related to this assignment:
Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether
the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all
partners shall be jointly and severally liable for the entire contract, if selected.
A Consultant will be selected in accordance with the Selection based on Consultant’s Qualifications (CQS)
method set out in the World Bank Regulations for IPF-Borrowers, September 2025
Further information can be obtained at the address below during office hours, 0900 to 1700 hours, Monday to
Friday.
Expressions of Interest EOI must be delivered in electronic form to the address below by November 23, 2026,
5:00 pm Majuro time.
MEC:
Attn: Steve Wakefield
PO Box 1439, Majuro MH 96960
Republic of the Marshall Islands
Tel: 692-625-3827/3829
E-mail: swakefield@mecrmi.com
Copy: Jack Chong-Gum, jack.chonggum@mecrmi.net
EOI Submission Requirements:
Expressions of Interest should include the following information:
1. Firm profile
2. Organizational Capacity
3. Relevant assignments (maximum 10 projects), preferably including energy-sector regulatory, energy
legislation implementation or tariff assignments in small island states.
4. Information addressing each of the shortlisting criteria
5. Company registration documents
Page Limit: Maximum 15 pages excluding registration documents. Submissions beyond the maximum page
limit of 15 pages will not be considered.
Yours sincerely,
4
Jack Chong-Gum
CEO , Marshalls Energy Company
jack.chonggum@mecrmi.net
5
Republic of the Marshall Islands
Marshalls Energy Company (MEC)
Terms of Reference (TOR)
Implementation Plan for Renewable Energy, Energy Efficiency and E-Mobility under the
Energy Act, 2025 and National Energy Authority Act, 2025, excluding Petroleum Provisions –
REGAIN Project
Project ID: P181250
Assignment Type: International Firm (Lump sum Contract)
Duration: 9 Months
Location: Remote with Periodic Missions to Majuro
1. Background
The Republic of the Marshall Islands (RMI) is one of the world's smallest and most isolated nations. The
country consists of 29 atolls and 5 low coral islands situated on about 181 square kilometers (km 2 ) of land mass
in the Pacific Ocean. Majuro (the nation's capital) and Ebeye, the country's two largest urban centers, account
for about 96 percent of the total population, while the remaining inhabitants live on the outer atolls. The
Government of the Republic of the Marshall Islands (GRMI) depends mostly on diesel generation to meet the
country's growing electricity needs. The country aims to enhance its energy security through renewable energy
generation, improve the reliability of electricity supply, enhance energy efficiency, expand e-mobility, and
improve access to electricity. Increased energy resilience will reduce dependence on hydrocarbon fuels, insulate
the country from the risks of price rises and supply uncertainties, and equip it with natural disaster-resilient
electricity infrastructure.
MEC, the state-owned energy utility, generates and provides electricity to Majuro Atoll, serving 55 percent of
RMI's population. MEC also manages three mini-grids in Jaluit, Wotje, Rongrong (Majuro Atoll), and Kili
Island, the latter having been recently transferred to MEC from the Kili Bikini Ejit (KBE) Local Government.
Following the integration of the Kwajalein Atoll Joint Utilities Resources (KAJUR) into MEC, MEC is also
responsible for power generation and distribution in Ebeye, together with the water and sewerage services
previously provided by KAJUR. MEC is responsible for executing plans to enhance energy security but lacks
the capability to conceive and implement them. It lacks the funds required to implement these plans. The
Government of the Republic of the Marshall Islands (GRMI) has partnered with the World Bank through the
Renewable Energy Generation and Access Increase Project (REGAIN) – an IDA grant of US$60 million
approved and effective as of December 13, 2024, with a closing date of September 30, 2030. The REGAIN
project aims to increase renewable energy generation and improve access to electricity while reducing reliance
on diesel-based generation through funding and technical support.
RMI’s Electricity Roadmap targets net-zero greenhouse gas emissions and 100% renewable electricity by 2050.
As a small and geographically dispersed island nation, RMI remains highly dependent on imported diesel for
electricity generation, exposing the country to high energy costs and vulnerability to global fuel price shocks
and supply disruptions. To manage this risk, RMI needs to diversify its electricity supply portfolio by
6
integrating more RE, manage demand growth by promoting efficient electricity use, pursue new business
opportunities such as EVs, and monitor and report implementation status to the GRMI for appropriate course
correction. Ensuring a reliable, clean, and cost-effective electricity supply is therefore critical to achieving
national climate commitments, strengthening energy security, and supporting sustainable socio-economic
development. The country lacks the legal, policy, and regulatory framework, institutional capability, and the
trained manpower required to achieve these objectives. The GRMI has taken some steps in this direction, such
as the notification of the Energy Act 2025, which provides a legal, policy, regulatory, and organizational
framework to promote security, safety, reliability, and sustainability of energy supply for the benefit of RMI’s
economy and citizens and to promote the efficient use of energy and of energy from indigenous sources.
Under Sub-Component 3.1 of the REGAIN project (Sector Development Assistance), MEC plans to seek
consultancy support from a firm to propose a roadmap and undertake proposed activities for the Implementation
of the Energy Act (IEA) 2025. In the roadmap, IEA shall propose activities to be undertaken in the short,
medium, and long term and undertake them to strengthen the capacity of key energy sector stakeholders by
focusing on regulation, target setting, monitoring tools, dissemination of progress, feedback, and course
correction to promote security, safety, reliability, and sustainability of energy supply in RMI.
IEA shall be prepared in close coordination with the newly established National Energy Authority (NEA) and
MEC.
IEA shall take into account all Acts, policies, regulations, studies and current practices relevant to electricity (all
RE included), Energy Efficiency, E-mobility and their funding, including but not limited to:
Energy Act 2025
National Energy Authority Act, 2025
Recommendations contained in Integrated Resource and Resilience Plan 2024-2034
Electricity Roadmap of 2018, which provides a relevant and guiding framework for the sector’s
development
MEC’s current tariff methodology and tariff model, prepared by MEC’s Supplemental Management and
Operations (SMO) consultant under ADB-funded technical assistance, which covers MEC’s operations
prior to the integration of KAJUR and on which the tariff review under Task 6 shall build
National Targets and the progress achieved against them to date
Relevant energy sector programs and studies of other development partners active in the RMI, in
particular the Asian Development Bank (ADB), such as the Energy Transition Project, should be taken
into account to ensure coordination and avoid duplication.
The assignment will support GRMI, MEC, and NEA in translating the Energy Act, 2025, and the National
Energy Authority Act, 2025, into an actionable implementation plan for renewable energy, energy efficiency,
and e-mobility. The assignment will identify required policy, regulatory, institutional, monitoring, and capacity-
building actions, while excluding provisions related to the petroleum sector. This support aligns with REGAIN’s
institutional strengthening objectives and RMI’s need to reduce reliance on diesel, improve energy security, and
support the integration of renewable energy.
7
2. Objectives
The objective of the assignment is to prepare a practical, time-bound implementation plan for renewable energy,
energy efficiency, and e-mobility under the Energy Act, 2025, and the National Energy Authority Act, 2025,
excluding petroleum-sector provisions, and to support the preparation of priority policy, regulatory, institutional,
monitoring, and capacity-building instruments required for implementation.
Institutional strengthening for the implementation of RE, EE, and e-mobility provisions.
Policy and regulatory framework, guidelines for the development of higher RE integration, EE
promotion, and e-mobility uptake.
Monitoring and reporting framework for RE, EE, and e-mobility targets, progress, and
implementation gaps.
Database/reporting arrangements for RE, EE, and e-mobility information.
Capacity development strategy for institutions, utilities, and local manpower.
3. Project Description
This assignment is financed by the World Bank under the institutional strengthening and implementation
support activities of REGAIN. It will support the policy, regulatory, institutional, monitoring, and capacity-
building measures required to implement the RE, EE, and E-mobility provisions of the Energy Act, 2025, and
the National Energy Authority Act, 2025.
4. Implementation Arrangements
MEC will be the Employer and the contracting authority for this assignment, responsible for approving
deliverables and payments. The Consultant may proceed to the next deliverable under MEC's general guidance.
NEA, as the statutory authority responsible for regulating the energy sector, shall be responsible for the
technical and regulatory approval of policy- and regulation-driven deliverables. MEC, as Employer, retains
ultimate authority for administrative and financial approval and for the release of REGAIN project funds, which
shall follow NEA's technical sign-off on the relevant deliverable. The responsible ministry and Cabinet shall be
consulted where recommendations require policy approval, regulatory adoption, statutory action, budget
allocation, or cross-government implementation. MEC shall be responsible for formal approval of all
deliverables and payments. The Consultant shall work under the direction of MEC and coordinate closely with:
MEC management and technical staff
REGAIN Project Management Services Consultant, as applicable
Project Implementation Unit (PMU) within MEC
NEA, the national regulatory body, serving as the regulatory interface between MEC and the
Consultant
Responsible Ministry and Cabinet on policy formulation
World Bank on matters requiring no-objection, reporting, or implementation support
ADB and other development partners active in RMI's energy sector, as relevant
Petroleum-sector implementation matters are excluded from this assignment.
8
5. Scope of Services
The scope of services is limited to the electricity sector, in particular renewable energy, energy efficiency, and e-
mobility, including relevant non-petroleum legal, policy, regulatory, institutional, monitoring, enforcement,
data, and capacity-building provisions necessary for their implementation. Petroleum sector related provisions
of the Energy Act, 2025, are excluded from the assignment. While MEC is the Contracting Employer for the
entire assignment, NEA serves as the primary technical Client for Tasks 1, 2, 3, and 7, given their statutory and
regulatory content. MEC's approval of these deliverables is administrative and financial and follows NEA's
technical acceptance.
Task 1: Diagnostic review of the Electricity Sector (in particular RE, EE and E-Mobility) of the Marshall
Islands
The Consultant shall review and map the existing institutional arrangement, policy, and regulatory framework
against the provisions and the directions contained in the Energy Act (EA) 2025 and the National Energy
Authority (NEA) Act 2025 (harmonious reading) for the development of Renewable Energy (RE), Energy
Efficiency (EE), and E-Mobility (E-MB). The Consultant will propose a strategy to address misaligned or
missing institutional arrangements, policies, and regulatory framework.
(i) Review of existing applicable policies, strategies, plans, and studies in the context of the requirements
of EA 2025 and NEA Act 2025,
(ii) Identify whether the gap is institutional, policy, or regulatory, whether it will be addressed within the
existing framework (alignment/modification), or whether a new framework is to be created, and
(iii) Recommend a broad policy, regulatory, and Institutional framework to address these gaps.
Task 2: Strategic review of the applicable RMI’s electricity sector related international and national
commitments and targets
The Consultant will undertake a focused review of the GRMI's international commitments, national targets,
initiatives for the development of RE, EE, and E-MB, and the progress achieved. The diagnostic and strategic
review will include the following:
(i) Discussion with the stakeholders and ascertaining reasons for the shortfall in the envisaged progress,
(ii) The Consultant shall review relevant national targets, international commitments, ongoing initiatives,
and selected comparable Pacific/SIDS practices for RE, EE, and e-mobility implementation. The
purpose of the review shall be to identify practical options for policy, regulatory, institutional,
monitoring, and capacity-building measures suitable for RMI,
(iii) Identification of implementation gaps, in particular critical legal, policy, regulatory, and institutional
gaps, which impacted the achievements of these initiatives and targets,
(iv) Assess whether these legal, policy, and regulatory gaps stem from implementation shortfall or a missing
framework, and
(v) Recommend a broad policy, regulatory, and institutional framework to address these gaps.
Task 3: Propose a strategy for addressing the identified gaps
The Consultant will propose a strategy with a time-bound implementation roadmap for addressing the gaps
identified in Tasks 1 and 2. The proposed strategy will include the following:
(i) Identification of Implementation gaps, i.e., the framework/provision exists but has not been
implemented, or there is a shortfall in its implementation,
(ii) Identification of gaps in the existing framework, i.e., the legal, policy, regulatory, or Institutional
framework provides for the enabling provision, but it has not been enacted or notified; indicate whether
it is a policy, regulatory, or institutional issue,
9
(iii) Identify misalignment (even a section or provision of it) of the policy, regulatory framework, or the
institutional framework with the EA 2025 and NEA 2025,
(iv) Identification of gaps that cannot be dealt with by the existing framework,
(v) Recommendation of a strategy to deal with these identified gaps. The proposed strategy will indicate the
required interventions (legal, policy, regulatory and institutional), their implementation order, the
stakeholders responsible for addressing them and the timelines within which these will be addressed
(short term- within 3 months, medium term- within 6 months and long term-within 12 months) duly
aligned with the statutory timelines provided in the Acts and related policies,
(vi) Indicate how the recommended interventions will address the identified gaps.
(vii) Indicate the way forward for the gaps which cannot be addressed under the existing legal framework,
and
(viii) Develop a comprehensive implementation roadmap considering the recommendations made in Task 2
and in this Task, and compile the recommendations.
The roadmap should indicate:
Short-term actions,
Medium-term actions,
Long-term actions,
Responsible institution,
Required decision or instrument,
Dependency,
Level of priority, and
Whether the consultant will draft the instrument under this assignment.
Task 4: Assessing the Institutional structure and the manpower requirements of the sector
The Consultant will examine whether the current institutional structure, including its roles and responsibilities,
aligns with those prescribed in the Energy Act and is conducive to the development of RE, EE, and E-MB in
RMI. The Consultant will examine the following:
(i) Clarity in their role and responsibilities (without any overlap) for the development of RE, EE, and E-
MB,
(ii) The institutional capacity to lead the development of RE, EE, and E-MB in RMI, such as project
planning, design, implementation, operation, and maintenance, and
(iii) Recommendations for addressing institutional alignment of roles and responsibilities, capacity gaps, and
the coordination mechanism between them for the development of RE, EE, and E-MB, taking into
account the integration of KAJUR’s operations into MEC.
The Consultant will also assess the skills and the manpower required for the development of RE, EE, and E-MB
in RMI. The Consultant shall assess:
(i) Manpower and the skills available with all important stakeholders,
(ii) Assess the manpower and the skill requirements considering the national targets and the evolving
(proposed Roadmap) legal, policy, regulatory and institutional framework for the development of RE,
EE and E-MB for the next 5 years,
(iii) Indicate the gaps between availability and requirements, and
(iv) Prepare a strategy to meet this gap, indicating the number, the skill requirements, and how the required
skills will be met (contents of the training, how and where the training will be provided, suggestions for
international collaboration, certification).
10
Task 5: Monitoring, Database and Reporting Framework for RE
The Consultant will assess the status of the RE database to determine its suitability for publishing a report that
records, documents, and shares critical information on RE, EE, and E-MB. The Consultant will:
(i) Evaluate the existing database and identify the missing indicators/information gap/data field necessary
for various stakeholders to discharge their roles and responsibilities for the development of RE, EE, and
E-MB in the country (covering Majuro, Ebeye and the outer island systems),
(ii) Recommend formats, information to be gathered, sources of this information, reporting institutions,
reporting frequency, and validation process,
(iii) Recommend the structure of the report to be published, and
(iv) Prepare the first RE encompassing the above recommendations, which NEA can subsequently update
and improve upon.
Task 6: Electricity tariff review and recommendations
The tariff review shall build on, and not duplicate, MEC’s current tariff methodology and tariff model prepared
by the SMO consultant. It shall focus on how that methodology has performed in practice, on areas it did not
examine in depth, and on extending it to all systems now operated by MEC, including Ebeye following the
integration of KAJUR’s operations into MEC, which was not covered by the earlier work. The review shall also
provide MEC and NEA with a clear, evidence-based rationale and supporting calculations for the recommended
tariff options, so that they are well prepared to respond to tariff proposals from policymakers, investors and
other stakeholders.
The Consultant shall review the existing electricity tariff arrangements and prepare recommendations and an
implementation pathway that are consistent with the Energy Act, 2025, and the National Energy Authority Act,
2025. The Consultant shall, in particular:
(i) Assess the adequacy of the current tariff level, structure, adjustment mechanisms, billing arrangements
and related subsidy or compensation mechanisms;
(ii) Assess the revenue requirement and efficient cost of electricity service, based on verified utility
financial, operational and investment data;
(iii) Determine the extent to which prevailing tariffs and practices align with the principles contemplated
under the relevant sections of the Energy Act;
(iv) Assess tariff implications of planned renewable energy, EE, E-mobility, battery storage, network,
resilience and access investments;
(v) Recommend refinements to the existing tariff methodology, tariff structure, adjustment mechanism and
regulatory review process that NEA can use in tariff determinations;
(vi) Review the application of MEC’s current tariff methodology and identify any issues, anomalies or
unintended outcomes that have emerged in practice and that may require adjustment;
(vii) Extend the revenue-requirement and cost-of-supply analysis to Ebeye following the integration of
KAJUR’s operations into MEC, including harmonization of KAJUR’s financial, operational and
customer data with MEC’s, clear separation of electricity costs from water and sewerage costs, and
options and a transition pathway for bringing Ebeye’s electricity tariff into MEC’s tariff framework;
(viii) Assess the merits and implications of the planned introduction of a single tariff for all customer classes;
(ix) Assess whether a uniform national tariff should be maintained across all MEC-served systems (Majuro,
Ebeye and the outer islands), or whether location-specific tariffs or tariff adjustment factors are
warranted, including the resulting cross-subsidies between locations;
11
(x) Using the known sizes and costs of the hybrid and mini-grid systems to be installed in the outer islands,
estimate the indicative cost of supply and potential tariff for each location, and assess the implications of
any proposal to reduce tariffs in locations with high renewable energy penetration;
(xi) Assess the practicality, timing and customer impact of reducing or removing existing government
subsidies, and the alternatives available;
(xii) Assess the feasibility of time-of-use tariffs that reflect the different costs of daytime (predominantly
solar) and nighttime (predominantly diesel) supply;
(xiii) Recommend tariffs and charging arrangements for electric vehicle charging;
(xiv) Assess feed-in tariff, net-metering and power purchase arrangements for privately owned renewable
energy systems seeking to export to MEC’s grid, including pricing based on avoided cost, the grid
integration, storage and backup costs borne by MEC, and the volume of such generation the grid can
accommodate;
(xv) Assess the implications of electricity supplied by third parties outside MEC’s networks, such as
renewable energy systems at government or private facilities that supply neighboring communities,
including the pricing basis and regulatory requirements for such supply, and how differences between
their prices and cost-reflective MEC tariffs can be explained and managed;
(xvi) Assess distributional and affordability implications for customer classes, including vulnerable
customers, and identify transparent options for any subsidy or compensation that may be required; and
(xvii) Provide practical inputs for preparation and future implementation of the National Electricity Tariff and
Billing Code.
Task 7: Addressing the recommendations
Based on the approved recommendations and implementation roadmap under Task 3, and working under the
technical supervision of NEA, the Consultant shall identify, prepare, revise or align the policies, regulations,
codes, guidelines and other instruments required to give effect to the relevant provisions of the Energy Act,
2025 and the National Energy Authority Act, 2025, excluding petroleum-sector provisions.
The Consultant shall, in particular:
(i) Prepare or align the electricity-sector regulatory instruments identified as necessary under the Acts,
including, as applicable, electricity licensing, electricity-sector regulation, Grid Code, service standards,
universal service and subsidy-related mechanisms,
(ii) Prepare or align the instruments required for renewable energy, including, as applicable, grid integration,
renewable IPPs, community renewable-energy projects, rooftop installations and renewable microgrids,
(iii) Prepare or align the instruments required for energy efficiency, including applicable standards, labeling
requirements, air-conditioning and cooling energy-efficiency requirements, and other EE measures
required to implement the applicable provisions of the Acts,
(iv) Prepare or align the instruments required for e-mobility, including applicable requirements relating to
charging infrastructure, technical standards, charging services, electricity supply and tariff arrangements,
and other matters required to implement the applicable provisions of the Acts, and
(v) Propose the institutional framework and clearly define the roles and responsibilities of the relevant
institutions for implementation.
6. Qualifications, Tasks, and Level of Effort of Specified Key Experts
The Consultant shall propose a team adequate for the assignment. In its proposal, the Consultant shall specify:
12
Each proposed key personnel position,
The name of the proposed expert, where available,
Role and responsibilities,
Minimum and actual qualifications and detailed relevant experience,
Whether the input is international or national/local,
Whether the input is home office or field-based,
Estimated level of effort in person-days or person-months, and
Anticipated timing of deployment and deployment location(s).
At a minimum, the Consultant is expected to consider the inclusion of expertise and an indicative level of effort
and split of on-site and remote deployment, as follows:
Expert
Position Key Tasks / Responsibilities Minimum Qualifications /
Experience
Int’l / Nat’l
Team Leader /
Senior Energy
Sector
Specialist
Overall project management and
project coordination; lead
stakeholder engagement and
consultations. Provide strategic
oversight across all workstreams;
ensure alignment with the Energy
Strategy, IRRP, EA 2025, and NEA
2025; oversee the preparation of all
draft and final deliverables;
coordinate quality assurance and
reporting to the client.
Advanced degree in energy, engineering,
economics, public policy, or a related
field.
15 years of relevant experience in the
electricity sector’s planning, sector
reform, and regulation.
Demonstrated experience leading
comparable national-level energy sector
assignments.
Strong stakeholder coordination and
report-writing experience.
International
Renewable
Energy Policy,
Regulatory
and
Institutional
Specialist
Assess policy, regulatory, and
institutional barriers affecting the
implementation of provisions of EA
2025 and NEA 2025 for the
development of Renewable Energy in
RMI.
Support the preparation of the
enabling actions and policy,
regulatory, and Institutional reform
roadmap. Assess institutional
coordination and implementation
arrangements.
Support the development of the
monitoring and implementation
framework and the database.
Contribute to stakeholder
engagement activities.
Advanced degree in law, Engineering,
public policy, economics, energy policy,
or a related field.
At least 15 years of experience in
renewable energy policy, regulation,
institutional reform, and roadmaps.
Experience supporting implementation-
focused renewable energy programs and
roadmaps is preferred.
International
Energy
Efficiency
Policy,
Regulatory
and
Institutional
Specialist
Assess the policy, regulatory, and
institutional barriers affecting the
implementation of EA 2025 and
NEA 2025 to promote Energy
Efficiency in RMI.
Support the preparation of the
roadmap for enabling actions and
policy reform. Assess institutional
coordination and implementation
arrangements.
Advanced degree in law, Engineering,
public policy, economics, energy policy,
or a related field.
At least 15 years of experience in energy
efficiency policy, regulation, and
institutional reform. Experience
supporting implementation-focused
energy efficiency programs and roadmaps
is preferred.
International
13
Support the development of the
monitoring and implementation
framework.
Contribute to stakeholder
engagement activities.
Electric
Mobility
Policy,
Regulatory
and
Institutional
Specialist
Assess policy, regulatory, and
institutional barriers affecting the
implementation of EA 2025 and
NEA 2025 for the development of
electric mobility in RMI.
Support the preparation of a roadmap
to enable actions and policy reform.
Assess institutional coordination and
implementation arrangements.
Support the development of the
monitoring and implementation
framework.
Contribute to stakeholder
engagement activities.
Advanced degree in law, Engineering,
public policy, economics, energy policy,
or a related field.
At least 15 years of experience in electric
mobility policy, regulation, institutional
reform, or utility governance. Experience
supporting implementation-focused
electric mobility programs and roadmaps
is preferred.
International
Regulatory
Economist and
Utility
Financial
Specialist
Tariff methodology, revenue
requirements, financial
normalization, asset base,
depreciation, financing, Cost of
Supply, financial modeling, and
utility sustainability. Lead Task 6,
including tariff design for multi-
location island systems, time-of-use,
electric vehicle charging, and feed-
in/net-metering tariffs, and
integration of Ebeye into MEC’s
tariff framework.
Degree in economics, finance,
engineering, public policy, or related
field; at least 15 years of relevant
electricity-sector experience, including
tariff/cost-of-service, utility finance, and
regulatory finance. Experience in tariff
design for small island or multi-system
utilities with high renewable energy
penetration is preferred.
International
Local Energy
Sector /
Stakeholder
Engagement
Specialist
Support local stakeholder
coordination, data collection,
institutional engagement, workshop
organization, and review of local
sector context.
Facilitation of coordination with
government agencies, utilities, and
local stakeholders. Support in project
logistics and consultation activities.
Relevant degree in energy, engineering,
economics, public administration, or a
related field.
Minimum 5 years of local sector
experience.
Strong knowledge of the Marshall
Islands’ energy sector institutions,
policies, and stakeholder environment.
Fluency in English and Marshallese is
desirable.
National
7. Fees and Reimbursable Expenses
As this engagement will be structured as a lump-sum contract, the selected Consultant shall submit a financial
proposal (in addition to a technical proposal) that includes:
A total lump-sum price for the performance of the services, payable against the deliverables set
out in Section VIII, supported by a breakdown of professional fees by each proposed expert and
personnel category, indicating the applicable unit rates and estimated level of effort (person-months
or person-days), provided for information purposes; and
14
Reimbursable expenses, included within the lump-sum price, covering any anticipated travel,
accommodation, per diem, logistics, communications, and other project-related costs necessary for
the performance of the services.
The lump-sum price shall be inclusive of all costs necessary for the performance of the services. The Consultant
shall clearly state the assumptions underlying the proposed costs and provide sufficient detail to allow MEC to
assess the reasonableness of the proposed budget.
8. Deliverables
The project has six (6) main deliverables.
The Consultant shall prepare and submit the following deliverables in accordance with the Scope of Services.
The Task references identify the principal Tasks contributing to each deliverable and shall not limit the
Consultant's obligation to take into account relevant findings and recommendations arising from other Tasks.
1. Deliverable 1: Inception Report (Linked to: Tasks 1 to 7)
The Consultant shall submit an Inception Report confirming its understanding of the assignment, methodology,
work plan, stakeholder engagement arrangements, data and information requirements, and detailed schedule for
carrying out the seven Tasks and submitting the required deliverables.
An Inception Workshop shall be conducted with MEC, NEA, and other relevant stakeholders, and agreed
outcomes shall be reflected in the final Inception Report.
The Deliverable shall be submitted within two weeks of Notice to Proceed (NTP).
2. Deliverable 2: Diagnostic Assessment and Implementation Roadmap (Linked to: Tasks 1, 2 and 3)
The Consultant shall prepare a consolidated Diagnostic Assessment and Implementation Roadmap for the
relevant provisions of the Energy Act, 2025, and the National Energy Authority Act, 2025, relating to
renewable energy, energy efficiency, and e-mobility.
The deliverable shall consolidate the diagnostic and strategic reviews, identify and categorize the principal
implementation, policy, regulatory, and institutional gaps and misalignments, and establish a prioritized, time-
bound roadmap to address them.
The roadmap shall identify responsible institutions, required actions, sequencing, dependencies, priorities, and
the policies, regulations, codes, and guidelines to be prepared or aligned under this assignment.
The Deliverable shall be submitted within ten weeks of the NTP.
3. Deliverable 3: Institutional and Capacity Development Framework (Linked to: Task 4 and relevant
institutional findings from Tasks 1 to 3)
The Consultant shall prepare an Institutional and Capacity Development Framework setting out the
recommended institutional arrangements, roles and responsibilities, coordination arrangements, manpower and
skills requirements, identified capacity gaps, and capacity-development strategy for RE, EE and e-mobility.
15
The proposed framework shall be consistent with the findings and priorities established under Deliverable 2
The Deliverable shall be submitted within eighteen weeks of the NTP.
4. Deliverable 4: Monitoring, Database and Reporting Framework and RE Report (Linked to: Task 5)
The Consultant shall prepare the Monitoring, Database and Reporting Framework for monitoring progress in
RE, EE and e-mobility, including the recommended database, data collection, validation and reporting
arrangements and institutional responsibilities.
The deliverable shall include the recommended database and reporting arrangements and the first RE Report,
prepared in a form suitable for subsequent updating by NEA.
The Deliverable shall be submitted within twenty-four weeks of the NTP.
5. Deliverable 5: Electricity Tariff Review and Recommendations (Linked to: Task 6)
The Consultant shall prepare a stand-alone Electricity Tariff Review and Recommendations Report, presenting
the assessment, findings, and recommended tariff and regulatory pathway in accordance with Task 6.
The deliverable shall provide the analytical and regulatory basis necessary to support tariff-related decisions and the
preparation or implementation of the applicable tariff and billing regulatory framework.
The deliverable shall also include the updated tariff model in editable form, covering all MEC-served systems
including Ebeye, and concise briefing notes setting out the rationale and supporting calculations for the
recommended tariff positions, for use by MEC and NEA in policy and stakeholder discussions.
The Deliverable shall be submitted within twenty-six weeks of the NTP.
6. Deliverable 6: Policies, Regulations, Codes and Guidelines for Implementation of the Energy Act
(Linked to: Task 7, informed by Tasks 1, 2 and 3)
Based on the approved recommendations and implementation roadmap, the Consultant shall prepare and/or
align the policies, regulations, codes, and guidelines identified as necessary to implement the relevant
provisions of the Energy Act, 2025, and the National Energy Authority Act, 2025, within the scope of the
assignment.
The deliverable shall comprise the agreed package of new and/or revised policies, regulations, codes and
guidelines covering, as applicable:
Electricity-sector regulation;
Renewable energy;
Energy efficiency, including air-conditioning and cooling; and
E-mobility.
The policies, regulations, codes and guidelines shall be consistent with the gaps, priorities and sequencing
established through the preceding Tasks and agreed with NEA and MEC.
16
The Deliverable shall be submitted within thirty-two weeks of the NTP.
9. Contract Duration
The contract duration is 9 months. The expected start date is January 2027.
10. Evaluation Criteria
The Consultant will be selected using the Consultant’s Qualifications-Based Selection (CQS) method in
accordance with the World Bank Procurement Regulations for IPF Borrowers and the REGAIN Procurement
Plan. Interested firms shall submit an Expression of Interest (EOI) demonstrating their qualifications and
relevant experience. EOIs will be evaluated against the criteria below. The most qualified and experienced firm
will be invited to submit a combined technical and financial proposal and, if responsive, to negotiate a contract.
Experience preparing energy-sector legal, policy and regulatory frameworks, or implementation plans
for energy legislation, including regulations, codes and licensing (35 points)
Experience in electricity tariff, cost-of-service and revenue-requirement studies for small island or multi-
system utilities, preferably with high renewable energy penetration (25 points)
Experience in the Pacific or other Small Island Developing States (25 points)
Technical and managerial capability of the firm, including core business, years in business, organization
and availability of relevant expertise (15 points)
Total: 100 points
Key experts will not be evaluated at the EOI stage. The qualifications of the proposed key experts set out in
Section 6 will be reviewed when the selected firm submits its technical proposal.
11. Inputs to be provided by MEC and NEA
MEC, as the Employer, and NEA, as the technical and regulatory counterpart, shall provide or facilitate timely
access to the information, documents, data, personnel, and stakeholders reasonably required for the performance
of the Services, to the extent available.
NEA shall:
Provide or facilitate access to applicable policies, regulations, codes, guidelines, regulatory instruments,
sector targets, reports, databases and other relevant regulatory information,
Provide available information on institutional arrangements, regulatory processes, staffing and capacity
relevant to the assignment,
Facilitate access to relevant officials and stakeholders for consultations and workshops, and
Review and provide timely technical comments and acceptance of deliverables submitted to it for review
or acceptance.
MEC shall:
Provide or facilitate access to relevant technical, operational, customer, commercial, financial and
investment information and data, including information required for the tariff review, covering all MEC-
served systems including Ebeye (former KAJUR operations), and MEC’s current tariff methodology and
tariff model,
17
Provide available plans, studies, reports, databases and information relating to existing and planned RE,
EE, e-mobility, storage, and network,
Facilitate access to relevant MEC and PMU personnel and stakeholder consultations, and
Undertake the contractual, administrative and financial review and approval of deliverables in
accordance with the implementation arrangements.
The Consultant shall, as part of the Inception Report, submit a consolidated data and information request
specifying the information required, its proposed source, format and required date. The Consultant shall
promptly identify material data gaps and propose appropriate alternative sources, assumptions or methodologies
where required.
The provision of information by MEC, NEA or any other stakeholder shall not relieve the Consultant of its
responsibility for the verification, analysis, adequacy and quality of the Services and deliverables required under
the Contract.
Data provenance
This notice is sourced from WB - World Bank and was originally published on August 17, 2026. Last refreshed today. Reference: OP00459459. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About Renewable Energy Generation and Access Increase Project
Renewable Energy Generation and Access Increase Project has issued 7 procurement notices on BidsFactory, including 2 currently open and 4 awarded contracts. Activity concentrates in Construction & Civil Works, Energy & Power, and Architecture & Engineering Services. Notices are distributed via WB - World Bank. Most recent publication: October 21, 2026.
Frequently asked questions about this tender
How can I submit a bid?
Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00459459 when communicating with the contracting authority.
Who is the contracting authority?
This notice was issued by Renewable Energy Generation and Access Increase Project in Marshall Islands. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Consulting contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Marshall Islands. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
Find tenders like this automatically
Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.