Tenders/Recruitment of one (1) Social Development Expert for the UGP of PAAEG 2.
Closed🇬🇳GuineaConsulting

Recruitment of one (1) Social Development Expert for the UGP of PAAEG 2.

Auto-translated from French
Original title: Recrutement d'un (1) Expert Spécialiste en Développement Social de l'UGP du PAAEG 2.

This tender is closed

The submission deadline for this tender has passed. It is no longer accepting bids.

Browse open Social Protection & Welfare tenders in Guinea

About This Opportunity

Request for Expression of Interest | Project: Guinea Electricity Access Scale Up Project-Phase 2 | Method: Individual Consultant Selection | Ref: GN-PAAEG - PHASE 2-547834-CS-CDS

This is a consulting contract in the social protection, rural development and Youth sectors. Located in Guinea, Africa, this opportunity is open to individual consultants.

Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the social protection sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage.

Description

Auto-translated from French
Project: Guinea Electricity Access Scale Up Project-Phase 2

REPUBLIC OF GUINEA

MINISTRY OF ENERGY

ELECTRICITE DE GUINEE (EDG SA)

Project to Improve Electricity Access in Guinea Phase 2 (PAAEG 2)

CALL FOR EXPRESSIONS OF INTEREST FOR THE RECRUITMENT OF AN INTERNATIONAL EXPERT IN SOCIAL SAFEGUARDS FOR PAAEG 2

(INDIVIDUAL CONSULTANT)

EOI NO. 03/ME/EDG/PAAEG 2/2026

Sector: Energy

Start Date: May 18, 2026

End Date: June 04, 2026

  1. CONTEXT AND JUSTIFICATION

The Guinean government, with the support of the World Bank, has prepared a development plan for the electricity grids of Conakry. For several decades, the electricity sector in Guinea has suffered from a chronic deficit between supply and demand due to the low level of electricity production and the inadequacy of the transmission and distribution network.

The deficit problem and the quality of electricity supply limit the participation of the private sector in the country's economic development as well as the improvement of the living conditions of the population. In order to eliminate these constraints in the reliable supply of electricity to the population, the Ministry of Energy and Hydraulics has initiated electricity distribution network extension projects through the Electricity Access Improvement Project in Guinea (PAAEG).

As part of the implementation of the national affordable electricity access program, in line with its strategic options for mobilizing financial resources, the Government of Guinea has developed the Project to Improve Electricity Access in Guinea (PAAEG). For its implementation, the Government has sought financing from the World Bank and financing from the French Development Agency (AFD).

The first phase of the project, which began in 2019, is currently underway, and its closing date is scheduled for June 2025.

In preparation for the documents for the new project (PAAEG 2) by the borrower with the assistance of the World Bank, a number of planning instruments and environmental and social safeguard tools are being developed. These include the establishment of framework instruments to guide the design of operational tools:

One of the main challenges of the new project is to improve the viability of the national electricity company (ÉlectricitĂ© de GuinĂ©e, EDG) and to maintain electricity tariffs at a socially acceptable level.

This Phase 2 of the PAAEG project is an Investment Project Financing (IPF) of $200 million with Performance-Based Conditions (PBC) and co-financing of the project. It will complement the first phase started in 2019, which is due to end in December 2025.

Its implementation will strengthen the dynamic of electricity access for all, while implementing comprehensive reforms to ensure the financial viability of the sector.

The proposed project will support the development of solar projects to increase renewable energy capacity, make more energy available in anticipation of increased demand, and reduce fossil fuel costs. The proposed project is part of the M300 energy initiative and is expected to generate significant climate co-benefits.

An environmental and social assessment was conducted for Phase 1 of the project, under the World Bank's Operational Policies (OP), and involved conducting two framework studies: an Environmental and Social Management Framework (ESMF) and a Resettlement Policy Framework (RPF).

These studies led to the classification of the project as Category "B" by the World Bank, meaning that the project generates negative environmental impacts of lesser magnitude, of a very local nature, and not irreversible.

At this stage of preparing the extension of the project-PAAEG 2-, it is also required to conduct a framework study, with safeguard instruments, in accordance with the World Bank's safeguard policies; namely the ESMF.

2. OBJECTIVE OF THE MISSION:

Due to the nature, location, characteristics, and scale of the activities envisaged within the framework of its implementation, the Project to Improve Electricity Access in Guinea Phase 2 is potentially associated with significant environmental and social risks and impacts, including safety risks. This is why it is classified as a "high-risk project" according to national legislation and the World Bank's environmental and social classification criteria. Eight (08) World Bank Environmental and Social Standards (ESS) are relevant to apply to the project in order to prevent risks and mitigate negative impacts on the environment and the population that could arise from its implementation. These are: ESS No. 1 "Assessment and Management of Environmental and Social Risks and Impacts"; ESS No. 2 "Labor and Working Conditions"; ESS No. 3 "...

Data provenance

This notice is sourced from WB - World Bank and was originally published on May 17, 2026. Last refreshed 4 days ago. Reference: OP00444204. Original language: French. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Guinea Electricity Access Scale Up Project-Phase 2

Guinea Electricity Access Scale Up Project-Phase 2 has issued 14 procurement notices on BidsFactory, including 0 currently open and 8 awarded contracts. Activity concentrates in Youth & Employment, Energy & Power, and Finance & Banking. All notices are published for Guinea. Notices are distributed via WB - World Bank. Most recent publication: September 8, 2026.

Frequently asked questions about this tender

What type of contract is this?

This is a Consulting contract in the Social Protection & Welfare sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Guinea. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00444204 when communicating with the contracting authority.

Is this tender still accepting bids?

No — the submission deadline has passed. The notice is archived for reference. To find open opportunities, use the filters above to browse current tenders.

Who is the contracting authority?

This notice was issued by Guinea Electricity Access Scale Up Project-Phase 2 in Guinea. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans

Key Details

Contract Type
Consulting
Eligibility
Individual Consultants
Language
French
Reference
OP00444204

Source

w
WB - World Bank
Multilateral

Contracting Authority

Guinea Electricity Access Scale Up Project-Phase 2
🇬🇳Guinea
Project: P511453