REHABILITATION AND MODERNIZATION OF IRRIGATION SCHEMES – LOT 1: DOMA (NASARAWA STATE) AND GALALA (BAUCHI STATE); LOT 2: KAMPE OMI (KOGI STATE) AND DUKKU LADE (KWARA STATE); LOT 3: NDIEZE (EBONYI STATE) AND ADANI (ENUGU STATE)
About This Opportunity
Invitation for Prequalification | Project: Sustainable Power and Irrigation for Nigeria Project | Method: Request for Proposals | Ref: FMWR&S/SPIN/D&B/RFP/2026/31
This is a works contract in the agriculture and food security, construction and civil works and energy and power sectors, with a focus on Irrigation and Rehabilitation. Located in Nigeria, Africa, this opportunity is open to firms and consortiums.
Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for civil works in the agriculture and food security sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
Invitation for Initial Selection
Works
(Design and Build)
Employer: Federal Ministry of Water Resources & Sanitation
Project: Sustainable Power and Irrigation for Nigeria (SPIN) Project
Contract title: Rehabilitation and Modernization of Irrigation Schemes:
Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State);
Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and
Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State).
Country: Nigeria
Credit No.: 76370NG
ISD No: FMWR&S/SPIN/D&B/RFP/2026/31
Issued on: November 10, 2026
1. The Federal Government of Nigeria has received financing from the World Bank toward the cost of the Sustainable Power and Irrigation for Nigeria (SPIN) Project and intends to apply part of the proceeds toward payments under the contracts for Rehabilitation and Modernization of Irrigation Schemes:
Lot 1: Doma Irrigation Scheme (Nasarawa State) and Galala Irrigation Scheme (Bauchi State);
Lot 2: Kampe-Omi Irrigation Scheme (Kogi State) and Duku-Lade Irrigation Scheme (Kwara State); and
Lot 3: Adani Irrigation Scheme (Enugu State) and Ndi-Eze Irrigation Scheme (Ebonyi State).
2. The Federal Ministry of Water Resources & Sanitation, through the Federal Project Management Unit (FPMU) of the SPIN Project, intends to initially select Applicants for the Procurement of works (Design and Build), summarized below:
a) Scope: Design review/upgrade (surveys, investigations and a modernised final design, including provision for Farmer-Led Irrigation Development) and rehabilitation/construction of intakes, lined canals, hydraulic and drainage structures and access roads, etc through to commissioning and handover. Modernisation includes replacing unlined channels with lined canals or piped/pressurized networks where feasible, improved water control and measurement structures, and innovations that improve scheme performance. Full details of the scope of works are provided in the Initial Selection Document (ISD).
(b) Performance: The works shall achieve high overall irrigation efficiency from source to field. This includes conveyance efficiency above 90% for lined canals, field application efficiency above 80% for surface irrigation, and distribution uniformity of at least 65%. The works shall also deliver an adequate, reliable and equitable water supply that meets crop water requirements throughout the irrigation season, to head, middle and tail-end users alike. Implementation within 18 months (two dry seasons) per Lot, plus a 12-month Defects Notification Period, under FIDIC Plant and Design-Build 2017, reprinted 2022 with amendments.
c) Key Qualification Requirements:
(i) Financial resources (liquid assets, lines of credit, etc.): Lot 1: US$4 million; Lot 2: US$6.5 million; Lot 3: US$4 million.
(ii) Minimum average annual construction turnover (2021–2025): Lot 1: US$26 million; Lot 2: US$39 million; Lot 3: US$26 million.
(iii) General experience: experience under construction contracts in the role of prime contractor or JV member for at least the last five (5) years, starting 1st January 2021.
(iv) Specific experience: two (2) similar contracts for construction or rehabilitation of irrigation works, satisfactorily and substantially completed between 1st January 2021 and the application deadline, each of minimum value Lot 1: US$16 million; Lot 2: US$24 million; Lot 3: US$16 million; with experience in irrigation works of at least 1,800 hectares, canal networks and water control structures, supported by mandatory documentary evidence.
(v) Design experience: two (2) contracts for the design of irrigation systems, each with a minimum area of 1,800 hectares, at least one of which demonstrates technical design optimisation addressing scheme-specific hydraulic, geotechnical and structural conditions. This may be met by the Applicant and/or a specialised subcontractor.
Requirements for multiple Lots are aggregated. Joint Ventures are limited to three members. Full qualification criteria are in the ISD.
3. It is expected that the Request for Proposals will be issued to initially selected Applicants by February 2027.
4. Initially selected Applicants may submit Proposals for one or several contracts (Lots), as further defined in the Request for Proposals document.
5. Initial Selection will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers, September 2025 (“Procurement Regulations”), and is open to all eligible Applicants as defined in the Procurement Regulations.
6. Interested eligible Applicants may obtain further information from the Federal Project Management Unit of the Sustainable Power and Irrigation for Nigeria (SPIN) Project (e-mail: info@spinproject.ng) at the address given below, between 09:00 am and 15:00 pm (Nigerian time), Monday to Friday.
7. A complete set of the Initial Selection Document in English may be purchased by interested Applicants on the submission of a written application to the address below and upon payment of a non-refundable fee of NGN 300,000.00 (Three Hundred Thousand Naira) only, or USD 225.00 (Two Hundred and Twenty-Five United States Dollars) only. The method of payment will be:
(a) Naira: through REMITA (www.remita.net) to the CBN (TSA) Account No. 0020293665077, Federal Ministry of Water Resources and Sanitation: Sustainable Power and Irrigation for Nigeria, under the service type “Sale of Bid Document”; or
(b) United States Dollars: by bank transfer to the following account:
Beneficiary Bank: Central Bank of Nigeria (CBN)
Beneficiary Bank Address: Plot 33, Tafawa Balewa Way, CBD, Abuja, Nigeria
Beneficiary Bank SWIFT Code: CBNINGLA
Account Name: Federal Ministry of Water Resources and Sanitation: Sustainable Power and Irrigation for Nigeria (SPIN) USD Project Account
Account Number: 3000151883
Intermediary Bank: Standard Chartered Bank, United Kingdom
Intermediary Bank Address: 1 Basinghall Avenue, London EC2V 5DD, United Kingdom
Intermediary Bank SWIFT Code: SCBLGB2L
Intermediary Bank Sort Code: 609470
Applicants are advised to quote the beneficiary account details and the ISD No. correctly in the payment narration to facilitate identification and reconciliation of funds. Proof of payment shall be presented at the address below or sent to info@spinproject.ng. Upon verification of payment, the Initial Selection Document will be issued in one of the following ways:
(i) in hard copy, for collection in person by the Applicant’s duly authorized representative at the address below; or
(ii) electronically, through a secure download link to a shared folder, which will be sent to the e-mail address provided by the Applicant in its written application.
8. A pre-application meeting will be held on December 1, 2026 at 2:00 p.m. Nigerian time (WAT) at the address below, or at another address to be communicated to Applicants. Applicants may also attend virtually; the link may be requested from info@spinproject.ng. Attendance is not mandatory. Applicants are requested to submit any questions in writing to reach the Employer not later than December 8, 2026.
9. Applications for Initial Selection should be submitted in sealed and clearly marked envelopes and delivered to the address below not later than 12:00 noon (Nigerian time) on December 22, 2026. Electronic submission of Applications will not be permitted. Late Applications may be rejected.
10. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful Proposer’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the Request for Proposals document.
11. The address referred to above is:
Attention: Engr. Ipinlaye Olaiya, National Project Coordinator
Federal Project Management Unit (FPMU), Sustainable Power and Irrigation for Nigeria (SPIN) Project
Federal Ministry of Water Resources & Sanitation
Plot 1402 Abba Kyari Street, Off Adesoji Aderemi Street, Apo
1st Floor / Room No. 08
Abuja-FCT, 900104, Nigeria
Tel: +234 803 443 2501
E-mail: info@spinproject.ng
Website: www.spinproject.ng
Data provenance
This notice is sourced from WB - World Bank and was originally published on November 10, 2026. Last refreshed today. Reference: OP00479463. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About Sustainable Power and Irrigation for Nigeria Project
Sustainable Power and Irrigation for Nigeria Project has issued 54 procurement notices on BidsFactory, including 3 currently open and 34 awarded contracts. Activity concentrates in Energy & Power, Infrastructure, and Education & Training. All notices are published for Nigeria. Notices are distributed via WB - World Bank. Most recent publication: November 10, 2026.
Frequently asked questions about this tender
Who is the contracting authority?
This notice was issued by Sustainable Power and Irrigation for Nigeria Project in Nigeria. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Works contract in the Agriculture & Food Security sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Where will the contract be performed?
The contract is for delivery in Nigeria. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00479463 when communicating with the contracting authority.
Find tenders like this automatically
Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.
Sectors & Categories
Key Details
Contracting Authority
Companies That Won Similar
Companies with awards in Agriculture & Food Security in Nigeria
Open expert positions in Nigeria
Aninver Development Partners is building its team for these assignments. Send your CV in two minutes.
- Local Ecosystem Facilitator - NigeriaUNDPApply by Nov 20, 2026Apply →
- Local Facilitator - NigeriaEBRDApply by Nov 30, 2026Apply →
- Local Project Facilitator - NigeriaAfrican Development Bank – ECNR · AfDB261021CIV1Apply by Nov 30, 2026Apply →