Tenders/SD-8: Swamp Forest Restoration of 220 Hectares in the Surma-Kushiyara/Haor Region
Open🇧🇩BangladeshConsulting

SD-8: Swamp Forest Restoration of 220 Hectares in the Surma-Kushiyara/Haor Region

Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project
Published: Oct 1, 2026
Updated: Oct 1, 2026
Source: BPPA (Bangladesh)

About This Opportunity

This is a consulting contract in the environment and climate, agriculture and food security and water and sanitation sectors. Located in Bangladesh, Asia, this opportunity is open to firms and consortiums.

Published through BPPA (Bangladesh), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for consulting in the environment and climate sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Published by Ministry of Environment and Forests, Department of Environment. Procuring Entity: Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project. For SD-8: 4.1 Inception, Site Selection, and Planning: • Conduct inception meeting with DoE, UNDP, Forest Department, Deputy Commissioner Sunamganj, Upazila Nirbahi Officers (Shalla & Dharmapasha), and local government representatives. • Carry out participatory GIS mapping and field validation to identify 220 hectares of government land, village common forest, community forest, and suitable swamp forest restoration sites. • Conduct ecological assessment with support from ecologist/botanist (can be engaged as short-term consultant) and local community elders to assess soil type, hydrology, erosion severity, and existing vegetation. • Identify erosion-prone faces of village mounds requiring greenbelt protection. • Develop detailed plantation plan including species mix, planting density, spacing, planting calendar aligned with monsoon season, and erosion protection techniques. • Submit Inception Report (including work plan, detailed activity schedule, budget breakdown, monitoring framework, and site maps) to Project Director (PD), DoE for approval. 4.2 Zoning, spatial planning and propagation plan: Composition of restoration will be differed by the type of the terrain such as low elevation, moderate elevation, high elevation of the landscape by type/ use such as village mound, kanda, dykes, growth centers, graveyard, riverbank, Canal Bank, daair (closed canal), gopat/ Jangal (pathway for cattle and carry grains), playground, crop processing area e.g., Khola, beel, doba, khal, etc. Composition of vegetation is different, which has been largely determined by the inundation period. Spatial planning considering the elevation/contour of the terrace, therefore, important, preparation of maps (GIS based map) and identifying the floral composition and accordingly plan for the restoration. Therefore, zoning is important, for example: Lower shallow-water edge: Nal, Hogla, Khagra and native sedges. • Middle wave-wash zone: Hijal or Koroch combined with suitable reeds. • Upper bank and slope: Vetiver and or Chailla planted in contour lines. • Crest: locally native shrubs and upper-fringe trees. • Submerged plants, semi-aquatic herbs, and small floating plants e.g., Shapla For propagation: Propagation and establishment of native wetland trees mainly for hizal and koroch and support through assisted natural regeneration (ANR) for reeds, grasses, and shrubs through seeds (seedling/ sapling), wildlings, rooted slips, tillers, rhizome division, stem cuttings, rooted clump division, rooted slips or tillers, layering (a branch is bent to the ground and partly covered with soil until roots develop. it is then separated from the parent plant), root suckers (naturally emerging shoots with roots are separated and transplanted), or other ecologically appropriate methods, including ANR (assisted natural regeneration), nursery development, site preparation, planting, protection, maintenance, casualty replacement, and survival monitoring. The zoning approach should follow “plant in patches rather than rigid rows”. A practical initial design is: • Tree clusters: variable spacing of approximately 3–5 meters, adjusted for species and natural recruits. • Mixed clusters: Hijal and Koroch as the main framework. • Open gaps: deliberately retain channels, mudflats, waterbird feeding areas and fish-access routes. 4.3 Purpose by type of species – examples are: • Hijal (Barringtonia acutangula): Low and moderately low land; seasonally deeply flooded; source of seedlings/saplings: nursery-raised seedlings, natural seedlings, limited direct sowing. Propagation through plantation. • Koroch/Karanja (Millettia pinnata (syn. Pongamia pinnata)): Low–middle flood zone, khal and beel margins. sources are wildlings, rhizomes, rooted clumps and stem cuttings, seedlings. Propagation through plantation. • Bon golap (Rosa involucrata): Wet thickets and upper swamp margins; source, rooted suckers or stem cuttings, ANR • Nal/Nol reed (Phragmites karka): Shallow-water belts, wave reduction, fish and bird habitat; source: rhizome pieces or rooted slips; ANR • Khagra (Saccharum spontaneum and locally identified related species): Exposed banks, newly deposited soil and upper shallow margins, source: rooted tillers or rhizome clumps, ANR • Ikor/Ekora (locally verified Saccharum/Erianthus complex): Seasonal wetland edge and wave-exposed margins, source: rhizome clumps or tillers, ANR • Emergent/semi-aquatic herbs: Kolmi (Ipomoea aquatica), Helencha (Enhydra fluctuans), Bishkatali (Persicaria/Polygonum spp.), native arrowheads (Sagittaria spp.), ANR • Rooted floating-leaved plants: Shapla (Nymphaea nouchali, N. pubescens), Padma (Nelumbo nucifera), Paniphal (Trapa spp.), ANR • Submerged plants and small floating plant

Data provenance

This notice is sourced from BPPA (Bangladesh) and was originally published on October 1, 2026. Last refreshed 3 days ago. Reference: 10689. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project

Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project has issued 3 procurement notices on BidsFactory, including 3 currently open and 0 awarded contracts. Activity concentrates in Environment & Climate, Agriculture & Food Security, and Urban Development & Housing. All notices are published for Bangladesh. Notices are distributed via BPPA (Bangladesh). Most recent publication: October 1, 2026.

Frequently asked questions about this tender

Who is the contracting authority?

This notice was issued by Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project in Bangladesh. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Consulting contract in the Environment & Climate sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Where will the contract be performed?

The contract is for delivery in Bangladesh. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit BPPA (Bangladesh) to access the full notice, required documents, and submission instructions. Quote reference 10689 when communicating with the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Contract Type
Consulting
Eligibility
Firms / Consortiums
Language
English
Reference
10689

Source

bppa
BPPA (Bangladesh)
Public Procurement

Contracting Authority

Project Director, Integrating Climate Change Adaptation into Sustainable Development Pathways of Bangladesh Project
🇧🇩Bangladesh

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.

Similar Open Tenders in Bangladesh

Open🇧🇩Bangladesh

Procurement of 50,000 MT (+ 5%) Bagged Granular Urea in 02 (two) shipments through Mongla Sea Port, Bangladesh.

🌾 Agriculture & Food Security🏗️ Construction & Civil Works
Oct 14, 2026
Open🇧🇩Bangladesh

National Consultant for Development Project Proposal (DPP)

🌍 Environment & Climate🏛️ Governance & Public Administration
Oct 14, 2026
Open🇧🇩Bangladesh

Supply of 1,00,000 MT (+5%) Bulk Granular Urea and delivery in package basis to the respective godowns located in various places in Bangladesh in 50 kg net bag in 04(four) shipments (bags to be supplied by the bidder).

🌾 Agriculture & Food Security🏦 Finance & Banking
Oct 14, 2026
Open🇧🇩Bangladesh

Procurement of 50,000 MT (+5%) Bagged Granular Urea in 02(two) shipments through Chattogram sea Port, Bangladesh.

🌾 Agriculture & Food Security🏗️ Construction & Civil Works
Oct 14, 2026
Open🇧🇩Bangladesh

Appointment of Carrying Contractor for Stevedoring, Lightering at Fairway and/or Harbaria, Mongla Seaport, Bangladesh, Bagging (Empty bags will be supplied by BCIC) and delivery of 40,000 MT (+/-10%) Granular Urea Fertilizer in 50 kg net bags to different Buffer Godowns located in Bangladesh imported from Fertiglobe,UAE under G2G agreement (2nd lot).

🌾 Agriculture & Food Security🏭 Industry & Manufacturing
Oct 8, 2026
Open🇧🇩Bangladesh

Construction of G+19 Storied utility Building with Two basement including Civil, internal Sanitary & Water supply system and internal Electrical works at Bangladesh Bank Head Office Premises,

🏗️ Construction & Civil Works📐 Architecture & Engineering Services
Oct 25, 2026