Selection of Consultancy Services for Detailed Engineering Design and Construction Supervision of: Water Supply Systems; and The Kotu Faecal Sludge Treatment Plant, together with the Rehabilitation of Sanitation Infrastructure in Kotu and Banjul.
About This Opportunity
Request for Expression of Interest | Project: The Gambia Water and Sanitation Project | Method: Quality And Cost-Based Selection | Ref: GM-NAWEC-565968-CS-QCBS
This is a consulting contract in the water and sanitation, construction and civil works and architecture and engineering sectors, with a focus on Rehabilitation, Water Supply, Sanitation and Construction Supervision. Located in Gambia, The, Asia, this opportunity is open to firms and consortiums. Proposals must be submitted before October 5, 2026.
Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for consulting in the water and sanitation sector. Consulting assignments are typically evaluated with a strong emphasis on the technical proposal, including the methodology and qualifications of key experts. Shortlisted firms may be invited to submit financial proposals in a second stage. Interested parties should review the full documentation on the original source before submitting their proposal.
Description
REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES – FIRMS SELECTION)
REPUBLIC OF THE GAMBIA
The Gambia Water and Sanitation Project (WASAP)
Project ID: P513113
Assignment Title:
Consultancy Services for Feasibility Studies, Detailed Engineering Design, Procurement Support, Construction Supervision, and Defects Liability Support for Urban Water Supply Systems in Kombo East and Urban Sanitation Infrastructure in Kotu and Banjul
Reference No.: GM-NAWEC-565968-CS-QCBS
The Republic of The Gambia has received financing from the World Bank toward the cost of the Gambia Water and Sanitation Project (WASAP) and intends to apply part of the proceeds for consulting services for Feasibility Studies, Detailed Engineering Design, Procurement Support, Construction Supervision, and Defects Liability Support for Urban Water Supply Systems in Kombo East and Urban Sanitation Infrastructure in Kotu and Banjul.
The Greater Banjul Area is the country’s principal urban and economic center. Urban water services face major challenges including production constraints, intermittent supply, ageing infrastructure, limited storage capacity, and high levels of non-revenue water. Similarly, sanitation services in Banjul and Kotu are constrained by deteriorated sewerage assets, underperforming wastewater treatment facilities, and inadequate fecal sludge management infrastructure. WASAP will support the Government of The Gambia in addressing these challenges through investments aimed at improving service coverage, reliability, resilience, and sustainability of water supply and sanitation services.
The assignment will support the preparation and implementation of priority investments in urban water supply and urban sanitation infrastructure, including:
- Urban water supply investments in Kombo East and Brikama East comprising boreholes, treatment facilities, storage reservoirs, transmission pipelines, distribution networks, household connections, SCADA systems, and power supply facilities; and
- Urban sanitation investments including rehabilitation and expansion of wastewater and sewerage infrastructure in Kotu and Banjul, fecal sludge treatment facilities, pumping stations, and associated infrastructure.
Scope of the Services
The consulting services will be undertaken in five phases:
Phase 1: Feasibility Study
- Review existing studies, plans, records, GIS data and infrastructure information.
- Conduct socio-economic, service area, demand and affordability assessments.
- Undertake detailed feasibility studies for urban water supply and sanitation investments.
- Assess climate resilience, environmental and social requirements, institutional arrangements, technical options and implementation strategies.
- Conduct economic and financial analyses, including lifecycle costing and investment prioritization.
- Prepare feasibility reports and preliminary designs.
Phase 2: Detailed Engineering Design
- Undertake topographic, cadastral, geotechnical, laboratory and utility investigations.
- Prepare detailed engineering designs for:
- Water supply facilities including boreholes, treatment systems, reservoirs, transmission mains, distribution networks and SCADA.
- Sanitation facilities include wastewater treatment systems, fecal sludge treatment plants, sewer networks, pumping stations and sea outfall improvements.
- Prepare design calculations, drawings, technical specifications, cost estimates, bills of quantities, and O&M documentation.
- Prepare procurement-ready engineering packages.
Phase 3: Procurement Support
- Prepare complete bidding documents and technical specifications.
- Participate in pre-bid meetings and site visits.
- Provide support during bid evaluation and contract award processes.
- Respond to technical clarifications and prepare addenda where required.
Phase 4: Construction Supervision and Contract Administration
- Supervise construction works and administer contracts.
- Monitor quality assurance, environmental and social compliance, occupational health and safety, cost and schedule performance.
- Review contractor submissions and oversee testing and commissioning.
- Support handover and completion.
Phase 5: Defects Liability Support
- Conduct inspections during the defect’s liability period.
- Verify correction of defects.
- Support final completion and contract close-out.
Duration
The estimated duration of the assignment is 46.5 months, including feasibility studies, design, procurement support, construction supervision, and defects liability support.
National Water and Electricity Company Limited (NAWEC), through the WASAP Project Implementation Unit (PIU), now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services.
Shortlisting Criteria
Interested firms should demonstrate:
- At least 15 years of experience in water supply and sanitation engineering.
- At least 10 years of experience in feasibility studies, detailed design, and construction supervision of urban water and sanitation infrastructure.
- Demonstrated experience in water treatment facilities, transmission and distribution networks, reservoirs, SCADA systems, wastewater treatment facilities, sewerage systems, pumping stations, and fecal sludge treatment infrastructure.
- Successful completion of at least two comparable assignments financed by multilateral development partners within the last seven years.
- Demonstrated experience in Africa and familiarity with international forms of contract including FIDIC or equivalent.
- Demonstrated quality assurance, environmental and social management, and occupational health and safety systems.
The qualifications and experience of Key Experts shall not be included in the shortlisting criteria. Key Experts will not be evaluated at the shortlisting stage.
The attention of interested Consultants is drawn to Section III, paragraphs 3.14, 3.16 and 3.17 of the World Bank’s Procurement Regulations for IPF Borrowers (September 2023) setting forth the World Bank’s policy on conflict of interest.
Consultants may associate with other firms to enhance their qualifications but should indicate clearly whether the association is in the form of a Joint Venture and/or a sub-consultancy. In the case of a Joint Venture, all partners shall be jointly and severally liable for the entire contract if selected.
The Consultant will be selected in accordance with the Quality and Cost-Based Selection (QCBS) method set out in the World Bank Procurement Regulations.
The TOR and further information can be obtained at the address below during office hours:
Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by fax, or by e-mail) by October 15th, 2026.
Attention: Mrs. Haddy Njie - Project Coordinator
Address: National Water & Electricity Company Limited,
Project Implementation Unit
Emporium III Building, Fajara
114 Kairaba Avenue
Floor/ Room number: Conference Room, 1st Floor
City: Banjul
Country: The Gambia
Telephone: +220 833664125/ 7009342
Electronic mail address: hnjie@nawec.gm, and copy asallah@nawec.gm )
Data provenance
This notice is sourced from WB - World Bank and was originally published on September 14, 2026. Last refreshed today. Reference: OP00468646. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
Frequently asked questions about this tender
Where will the contract be performed?
The contract is for delivery in Gambia, The. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00468646 when communicating with the contracting authority.
When does this tender close?
The submission deadline is October 5, 2026. You have 19 days left to prepare and submit your proposal to the contracting authority.
Who is the contracting authority?
This notice was issued by The Gambia Water and Sanitation Project in Gambia, The. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
What type of contract is this?
This is a Consulting contract in the Water & Sanitation sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Key Details
Contracting Authority
Contact
Companies That Won Similar
Companies with awards in Water & Sanitation in Gambia, The