Thaton Combine Cycle Gas Turbine (CCGT) Power Plant
Summary
Description
Invitation for Prequalification
Myanmar Electric Power Project (IDA-53060-MM)
Thaton Combine Cycle Gas Turbine (CCGT) Power Plant
(ICB MEPE-G-01)
This invitation forprequalification follows the general procurement notice for this project that appeared in Development Business of October 22, 2013 on-line.
The Republic Of TheUnion Of Myanmar hasreceived a credit from the International Development Association (IDA) toward the cost of the Myanmar Electric Power Project, and it intends to apply part of the proceeds of this credit to payments under the contract for Thaton Combine Cycle Gas Turbine (CCGT) Power Plant at the existing Thaton gas station (GT) in Mon State with a new combined cycle gas turbine (CCGT) power plant. TheMyanmar Electric Power Enterprise (MEPE) intends to prequalify contractorsfor supply and installation of a gas power plant which will generate and supply as much electricity as possible to the grid, limited by the available fuel gas up to 25 MMCFD. Power export shallbe at 66kV and 230 kV. The power station shall primarily generate base load power to Myanmar National grids.The main specifications include: the overall capacity of the power plant to be constructed is in the range of 105-110 MW, the minimum capacity of gas turbine and steam turbine is 35-45 MW/unit and 20-40 MW/unit respectively
It is expected that invitations for bid will be made in April 2014.
Prequalification will be conducted through the procedures specified in the World Bank's Guidelines: Procurement under IBRD Loans and IDA Credits, January 2011, and is open to all bidders from eligible source countries, as defined in the guidelines.
Interested eligibleApplicants may obtain further information from and inspect the prequalification document from 10:00 -15:30 hrs. at
Thermal Power Department
Myanmar Electric Power Enterprise,
Bldg No. 27, Nay Pyi Taw
Myanmar
Phone: + 9567410228
E-mail: gtceoffice@gmail.com
A complete set of the prequalification document in English language may be obtained free of charge by sending a request to the above email address. A copy of the prequalification document will be sent to the interested eligible Applicants as the attachment to the email. Applications for prequalification should be submitted in sealed envelopes, delivered to the address below by24.2.2014 , 14:00 Hrand be clearly marked "Application to Prequalify for Thaton Combine CycleGas Turbine (CCGT) Power Plant(ICB MEPE-G-01)"
Material Planning Department
Myanmar Electric Power Enterprise,
Ministry ofElectric Power
Bldg No. 27, Nay Pyi Taw
Myanmar
About This Opportunity
This is a works contract in the education and training, energy and power and transport and logistics sectors. Located in Myanmar, Asia, this opportunity is open to firms and consortiums.
Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for civil works in the education and training sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.