Tenders/Turnkey contract - E1 - Heat Pump
Awarded🇩🇰DenmarkWorks

Turnkey contract - E1 - Heat Pump

Auto-translated from da
Original title: Totalentreprisekontrakt ­ E1 ­ Varmepumpe
Svendborg Fjernvarme A.m.b.a
Published: Jun 29, 2026
Updated: Jul 10, 2026
Source: TED - Tenders Electronic Daily (EU)

This tender has been awarded

Awarded to Krebs A/S — DKK 160,991,500

Browse open Construction & Civil Works tenders in Denmark

About This Opportunity

This is a works contract in the construction and civil works sector. Located in Denmark, Europe, this opportunity is open to firms and consortiums, with an estimated budget of DKK 190.0 million.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.

Description

Auto-translated from da

The tendered task is offered as a turnkey contract. The tender comprises one heat pump system based on outside air as the energy source, the system must deliver 22.5-26 MW of heat at 0° C outside temperature, and a relative humidity between 80 and 100%. The project allows all natural refrigerants in the heat pump installation itself. Direct evaporation in the air yard is only accepted for A1 refrigerants, meaning that flammable or toxic refrigerants are not desired in the air yard. The contracting authority wishes to enter into a turnkey contract for the design, supply, installation, and commissioning of a heat pump system within the specified delivery limits. The delivery thus includes a project where the tenderer takes full responsibility for designing, calculating, collaborating on the best solution in the short and long term, purchasing, performing installation, and commissioning. Refer to the technical descriptions and specifications in the tender material for a detailed specification of the delivery. The contractor must perform all necessary work for the establishment of the heat pump system, including, but not limited to: Preliminary design, detailed design, purchasing specifications, quality assurance, CE marking, installation control according to requirements from the Danish Working Environment Authority, compliance and documentation of all relevant authority requirements. The contractor must deliver the technical information necessary for the design of the building contract. Perform planning, coordination, and necessary work required for the delivery of the agreed supply. In the start-up phase, the turnkey contractor must coordinate design and interfaces with adjacent contracts to clarify availability restrictions. Quality assurance, control, tests, commissioning, and preparation of trial operation and warranty measurements for the heat pump system. Other contracts that are ongoing in Svendborg Fjernvarme E1 – 22.5-26 MW Air/water heat pump (this tender) E2 – 25 MW Electric boiler (Other contract) E3 – 10,000 m3 Accumulation tank (VAK) (Other contract) E4 – 60 / 10 kV power supply from Bodøvej Transformer Station (Other contract) E5 – District heating pipeline (Other contract) E6 – Renovation of building (Other contract))

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on June 29, 2026. Last refreshed 27 days ago. Original language: da. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Svendborg Fjernvarme A.m.b.a

Svendborg Fjernvarme A.m.b.a has issued 2 procurement notices on BidsFactory, including 0 currently open and 2 awarded contracts. Activity concentrates in Construction & Civil Works. All notices are published for Denmark. Notices are distributed via TED - Tenders Electronic Daily (EU). Most recent publication: June 29, 2026.

Frequently asked questions about this tender

Is this tender still open?

No — the contract has already been awarded to Krebs A/S. The award notice is archived on BidsFactory for transparency and market intelligence.

Who is the contracting authority?

This notice was issued by Svendborg Fjernvarme A.m.b.a in Denmark. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Construction & Civil Works sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

How much was the contract awarded for?

Krebs A/S was awarded the contract for DKK 160,991,500. The figure reflects the value disclosed by the contracting authority in the award notice.

Where will the contract be performed?

The contract is for delivery in Denmark. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Estimated Budget
DKK 190,000,000 - DKK 190,000,000
Contract Type
Works
Eligibility
Firms / Consortiums
Language
da

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

Svendborg Fjernvarme A.m.b.a
🇩🇰Denmark

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.