Renovation of Vähärauma substation
About This Opportunity
TranslatedPori Energia Sähköverkot Oy is set to renew the Vähärauma substation, originally built in the 1970s, during the years 2025-2026. The new substation will be constructed adjacent to the existing facility, with some components positioned above the current station. This project will be executed as a KVR contract and includes modifications to 110 kV power lines, transitions to new portals, and the rerouting of existing medium voltage and telecommunications cables to the new structure. The scope of the substation includes two (2) 110 kV outgoing fields, two (2) 110 kV transformer fields (including transformer foundations), and a shared single-bus system. The SF6-free medium voltage switchgear will comprise approximately 40 cells, depending on the switchgear solution, and will be implemented as a double-bus system (or duplex). The delivery will also include two fixed earth fault protection devices and an adjustable reactor. The new substation building will feature two floors (cable space and equipment rooms) with a minimum area of 600 m2. The contract also encompasses the power upgrade (ONAN to ONAF) of the existing main transformer (PM2) and its relocation to the new transformer foundation, along with the necessary connection works for a new main transformer (PM1) procured by the client. Additionally, the relocation of existing equipment, including the 110 kV transformer to the client's storage and the transfer and commissioning of two earth fault protection devices at the new substation, is included. The demolition of existing structures and equipment at the current substation, along with sorting for recycling, is also part of the contract. The procurement is not divided into parts, as it constitutes a single cohesive entity, emphasizing the importance of coordinated execution.
This is a works contract in the energy and power, construction and civil works and architecture and engineering sectors, with a focus on Transmission Distribution, Buildings, Construction Supervision and Electrical Engineering. Located in Finland, Europe, this opportunity is open to firms and consortiums.
Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the energy and power sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. This contract has already been awarded. The information is published for transparency and market intelligence purposes.
Description
Auto-translated from fiPori Energia Sähköverkot Oy will renovate the Vähärauma substation, built in the 1970s, during the years 2025-2026. The substation will be built next to the current substation and partly on top of the current substation. The substation will be implemented as a design-build contract and will also include, among other things, modifications and diversions of 110 kV power lines to new portals and the diversion of current medium-voltage and telecommunication cables to the new building. The substation will have two (2) 110 kV line outgoing fields, two (2) 110 kV transformer fields (incl. transformer foundations), and a split single-busbar system. The SF6-free medium-voltage switchgear will have approximately 40 cells, depending on the switchgear solution. The switchgear will be implemented as a double-busbar system (or duplex). The delivery includes two fixed ground fault neutralization devices and an adjustable reactor. The new substation building will have two floors (cable space and equipment rooms). The building area is at least 600 m2. The contract also includes the power upgrade (ONAN -> ONAF) of the current main transformer (PM2) and its transfer to the new transformer foundation, as well as connection work required for the new main transformer (PM1) procured by the client. The transfer of current equipment to be preserved or moved, such as the 110 kV transformer to the client's warehouse, and the transfer and commissioning of two ground fault neutralization devices at the new substation. The demolition of the current substation structures and equipment, as well as sorting for recycling, is also included in the contract. The procurement has not been divided into parts, as it forms a single, cohesive whole. It is important for the implementation of the project that it is coordinated as a single entity.
Data provenance
This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on March 14, 2025. Last refreshed today. Original language: fi. BidsFactory mirrors official procurement notices and links back to the source for full legal text.
About Pori Energia Sähköverkot Oy
Pori Energia Sähköverkot Oy has issued 8 procurement notices on BidsFactory, including 2 currently open and 1 awarded contracts. Activity concentrates in Construction & Civil Works, Energy & Power, and Architecture & Engineering Services. All notices are published for Finland. Notices are distributed via TED - Tenders Electronic Daily (EU) and Hilma Finland. Most recent publication: July 14, 2026.
Frequently asked questions about this tender
What type of contract is this?
This is a Works contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.
How much was the contract awarded for?
Energineering Oy was awarded the contract for €5,613,510. The figure reflects the value disclosed by the contracting authority in the award notice.
Where will the contract be performed?
The contract is for delivery in Finland. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.
How can I submit a bid?
Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.
Is this tender still open?
No — the contract has already been awarded to Energineering Oy. The award notice is archived on BidsFactory for transparency and market intelligence.
Who is the contracting authority?
This notice was issued by Pori Energia Sähköverkot Oy in Finland. The authority is responsible for evaluating bids, awarding the contract, and managing performance.
Find tenders like this automatically
Set up alerts and filters that match your business — never miss a relevant opportunity again.
Sectors & Categories
Contracting Authority
Companies That Won Similar
Companies with awards in Energy & Power in Finland