NOTICE OF CALL FOR TENDER
Title: Terms of Reference for Vendors interested to supply construction materials
in the little Akaki Catchment in Sululta town of the Sheger City, Ethiopia
Objective: Supply and Delivery of Construction Materials, Hand Tools, Vegetative Stock, and
Geo-Fabrics for Community-Based Integrated Watershed Management (Nature-based
Solutions)
Publication Date: September 12, 2026
Closure Date: September 26,2026
Supply and delivery of Construction materials for the implementation of nature based solution (NbS)
measures in little Akaki covering Sululta town, Sheger city.
Project Code: P04807
Donor reporting reference: DN01983, AVKE-00130
Country of Assignment: Ethiopia
Organisation: International Union for Conservation of Nature (IUCN) – Eastern and Southern
Africa Regional Office
Country/Location: Ethiopia
Reporting to: IUCN Ethiopia Office
Expected start date: October 26, 2026
Type of contract: 45 days’ supply and delivery contract
Expected Contract end date: 11 December 2026
1. Context and Rationale
Ethiopia faces a severe land degradation crisis, with more than eighty-five percent of its nationwide
land area classified as moderately to severely degraded. Although recent policy interventions and
national campaigns have achieved measurable improvements in overall forest cover and reduced
localized deforestation rates, broad rural and peri-urban landscapes remain under extreme pressure.
This ongoing ecological stress is driven by rapid demographic growth, continuous expansion of
unsustainable agricultural practices, aggressive over-extraction of surface and groundwater
resources, severe soil erosion, and persistent institutional gaps in land governance. Together, these
drivers fuel a self-reinforcing cycle of ecosystem vulnerability and socio-economic fragility.
As Ethiopia's fourth largest and most socio-economically utilized watershed, the Awash River Basin
experiences acute environmental distress characterized by aggressive farmland expansion, industrial
effluent pollution, soil salinization, and invasive species encroachment. The Upper Awash Sub-basin,
which directly encompasses the rapidly growing Addis Ababa Metropolitan Area and its critical
surrounding catchment highlands, bears the heaviest burden of these human-induced pressures. In
response to these profound threats, the Government of Ethiopia has launched high-level strategic
frameworks, including the nationally recognized Green Legacy Initiative, basin-wide master planning
overseen by the Ministry of Water and Energy, and dedicated funding channels such as the Green
Legacy and Landscape Restoration Special Fund. The IUCN's NbS4Water in Africa project contributes
to watershed restoration result pathways that ultimately improve groundwater recharge in Addis
Ababa. This project aligns directly with these overarching national priorities, seeking to systematically
restore degraded catchments and enhance water-related ecosystem services through Integrated
Watershed Management (IWM) and application of Nature-based Solutions.
2. About the Project
The project focuses on promoting catchment protection through Nature-based Solutions (NbS),
framed as best adaptive practices in the context of climate change and increasing land degradation. It
aims to scale up NbS for watershed restoration in alignment with national basin development, land
degradation neutrality, and landscape restoration goals.
The general objective is to enhance water-related ecosystem services in key watersheds of the Awash
sub-basin for the benefit of both people and the environment through the application of NbS. To
achieve this, the project will strengthen action-oriented partnerships among community-based
organizations (CBOs), the wider public, national and local governments, and non-government actors.
These partnerships will promote NbS that build knowledge, shape positive attitudes, and encourage
good practices, mobilizing society as a whole to achieve large-scale watershed rehabilitation,
restoration, and sustainable development and use.
The general objective of the project is to improve ground water recharge of the little Akaki
catchment of the upper Awash river basin focusing on Guleel & Addis Ketema sub-cities of Addis
Ababa and Sululta town of Sheger city, specifically in Bilisuma micro catchment.
3. Description of the Assignment
The International Union for Conservation of Nature (IUCN) is currently executing a strategic project
focused on Nature-based Solutions (NbS) for integrated watershed restoration within the Little Akaki
Catchment. This crucial catchment is located in the area beyond Entoto mountain, particularly in
Bilisuma mountain micro catchment. The operational model of this intervention relies on procuring
material inputs that will subsequently be utilized by Community-Based Organizations (CBOs) assigned
for the watershed restoration activities in the project areas.
Accordingly, the IUCN Ethiopia Program Office is issuing this Invitation to Bid. Qualified suppliers,
dealers, manufacturers, and contractors are invited to submit their formal technical and financial
proposals to supply specified material lots, which will form the basis for formal procurement purchase
orders and supply contracts. Applicants must possess official business registration, valid trade licenses
renewed for the current fiscal year, tax clearance, and proven supply capacity verified by competent
administrative and commercial authorities.
Under the resulting procurement contracts, selected suppliers will deliver targeted material inputs
necessary for NbS implementation. The required materials encompass heavy-duty galvanized wire
mesh baskets, binding wire, quarried stone, geotextile filter fabrics, HDPE geomembranes, hand
toolkits, survey equipment, biological vegetative slips, organic compost, and heavy machinery
execution hours. These inputs will allow CBOs to construct micro-ponds, soil and water conservation [...]
Procurement details
Reference: IUCN-26-08-Vendor Supply of construction materials NBS4Water for Sululta-608
Procedure: SOP1 - Open Procedure
Procurement type: Field - Construction materials
IUCN office (lead): ESARO Kenya
Requisitioning unit: ESARO - Programme Coordination (KE)
Project: P04807 Scaling up NbS for water in Africa
Country of performance: Ethiopia
Expected contract duration: 45 days’ supply and delivery contract
Estimated contract value: 25,000-199,999 CHF
Currency of proposals: USD - United States dollar
Language of documents: English
Donor requirements: Not Any
Deadline for questions: 15 September 2026 20:59 UTC
Deadline for technical and financial proposals: 30 September 2026 20:59 UTC
Expected contract award date: 14 October 2026 20:59 UTC
Documents
- Terms of Reference: Terms of Reference.pdf
- Conditions for Participating: Conditions for Participating ENG-SPA-FRA.docx
- Standard contract: Standard Agreement.docx
- BoQ for Sululta-Site.pdf
The International Union for Conservation of Nature (IUCN) is a membership union of government and civil society organisations working on nature conservation and sustainable development. IUCN procures consulting services, goods and works for its projects worldwide through the IUCN Procurement Portal. For all contracts above CHF 25,000 IUCN selects contractors through a formal competitive tendering process under its Standard Operating Procedure 1 (Open Procedure). Interested bidders must register on the portal, review the Terms of Reference, the Conditions for Participating and the standard contract, and submit their technical and financial proposals through the portal before the stated deadline. Questions must be raised through the portal's Q&A function before the deadline for questions.