Copy Copy Copy Copy Copy Extension of canteen kitchen house 25 - SKP 285.1 Interior painting work
Description
This tender, published on the SIMAP platform for Switzerland, concerns the construction of double and hollow floors (Doppel- und Hohlraumböden) for 'Neubau Haus 07B' (New Building House 07B). The contracting authority is seeking specialized contractors to install these types of raised access flooring systems. The project specifies the installation across multiple levels, from the basement (UG02) to the second floor (OG2), covering an area of 525 square meters. Typical requirements for such tenders include the expertise in preparing the substrate, supplying and fitting the double and hollow floor systems, and ensuring a level, stable, and durable finished surface. The tender documents will detail the specific technical requirements, material specifications (e.g., type of panels, pedestal systems), and load-bearing capacities. Bidders must demonstrate experience with raised floor installations in commercial or institutional buildings, adhere to Swiss construction standards, and ensure the work is completed to a high standard of quality and within the specified timeframe.
This procurement aims to create functional and accessible floor spaces.
About This Opportunity
This is a works contract in the construction and civil works and architecture and engineering sectors, with a focus on Buildings. Located in Switzerland, Europe, this opportunity is open to firms and consortiums. Proposals must be submitted before June 9, 2026.
Published through SIMAP Switzerland, a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the construction and civil works sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.