Lot 1 – Supply, install and commissioning of MID‑Compliant Electrical Meters and Integration to an energy management system, including Telemetry, IoT Gateways and remote metering connectivity
Description
daa is upgrading some of its electrical, thermal and water metering infrastructure across the Dublin Airport campus. The project covers the supply, installation, commissioning, integration of a new generation of utility meters, replacing legacy devices that no longer meet daa’s operational, accuracy or datamanagement requirements. The upgraded meters will provide highaccuracy, MIDcompliant measurement, enhanced data and realtime visibility of energy usage. The programme includes the deployment of new meters, communication interfaces, telemetry solutions for remote locations and full integration with Dublin airport’s existing Energy Management Systems. The solution must be open protocol and technology - agnostic. The project will also consider futureproofing options, including compatibility with LoRaWAN and other IoTbased technologies.
About This Opportunity
This is a supplies contract in the Research sector. Located in Ireland, Europe, this opportunity is open to firms and consortiums, with an estimated budget of EUR 600,000. Proposals must be submitted before May 5, 2026.
Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for the supply of goods in the Research sector. Supply contracts typically require bidders to demonstrate product compliance with technical specifications, delivery capacity, and relevant certifications. Interested parties should review the full documentation on the original source before submitting their proposal.