R8 Ado Kariygawa Anan-Nakagawa River Improvement Works (1) (Planning and Education)
Description
This tender, originating from Japan and issued by the Anan Prefectural Civil Engineering Office, pertains to river improvement works on the Kariya River in the Anan and Naka River areas. Specifically classified under 'Civil Engineering Works (General)', this procurement involves construction and rehabilitation activities aimed at enhancing the river's flood control capacity and environmental conditions. The scope of work is likely to include earthworks, construction of embankments or levees, installation of erosion control measures, and potentially dredging or channel modification. Bidders must possess substantial experience in river engineering and construction, hold the necessary licenses and certifications, and demonstrate a strong capacity for project management, including adherence to strict safety and environmental protocols. The project details, including design specifications, work schedules, and contract duration, will be provided in the full tender documents. Further information is available through the Tokushima Prefecture Electronic Bidding (Bidding Information Service).
About This Opportunity
This is a works contract in the architecture and engineering and environment and climate sectors, with a focus on Project Management. Located in Japan, Asia, this opportunity is open to firms and consortiums. Proposals must be submitted before June 1, 2026.
Published through Tokushima Prefecture (e-PPI works), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for civil works in the architecture and engineering sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees. Interested parties should review the full documentation on the original source before submitting their proposal.