Resilient connectivity and Urban Transport Accessibility Project
P177210 · Haiti · Latin America and Caribbean · Financing: I, D, A, E, 0
Procurement plan: every tender of the project
Chargé de Projet Composante 2 RUTAP
Plannedpipeline.cat.individualSpécialiste Social Gestion Genre basé au Cap-Haïtien
Plannedpipeline.cat.individualSpécialsite environnemental
Plannedpipeline.cat.individualSpécialiste en Passation des Marchés
Plannedpipeline.cat.individualDocumentaliste-Archivisite
Plannedpipeline.cat.individualAssistant(e) de Projet
Plannedpipeline.cat.individualAssistant(e) Administratif(ve)
Plannedpipeline.cat.individualSPÉCIALISTE EN COMMUNICATION
Plannedpipeline.cat.individualIngénieur Sénior en Transport
Plannedpipeline.cat.individualDirect selectionAudit Financier du Projet RUTAP
PlannedConsultingLCSSpécialiste chargé de la Composante 3
Plannedpipeline.cat.individualEtudes Geotechniques du tronçon de route Madeline-Aéroport de la RN3
PlannedNon-consulting servicesDirect selectionEtudes Elargissement du segment de route Madeline/Aéroport de la RN3
PlannedConsultingQCBSEtude des aménagements des principaux carrefours de Cap-Haïtien
PlannedConsultingCQSRéhabilitation de la route Nan Banane au Cap-Haitien
PlannedWorksRFBAdaptation climatique du tronçon de route Plaisance/Lièvre en trois (3) Lots
PlannedWorksRFBAmélioration de routes rurales dans le Sud et les Nippes en quatre (4) Lots
PlannedWorksRFBAménagement des principaux carrefours du Cap-Haitien
PlannedWorksRFBConstruction du pont de Dame-Marie
PlannedWorksRFBPROTECTION DU PONT ET DE LA VILLE LES ANGLAIS
PlannedWorksRFBREHABILITATION DU TRONCON ARNIQUET - CHATEAU
PlannedWorksRFBAssistant(e) Administratif(ve) basé(e) aux Cayes
Plannedpipeline.cat.individualAnimatrice Genre basée dans le Sud
Plannedpipeline.cat.individualSpécialiste Communication Projets Transport
Plannedpipeline.cat.individualRecrutement d’un Bureau d’Études et de conseils pour une Assistance technique sur 12 mois en vue de mettre en œuvre le Plan d’Action Genre (PAG) réalisé au courant de l’année 2025 dans le cadre du contrat DP-004-RUTAP/2024.
PlannedConsultingQCBSCHEF DE MISSION POUR LA SUPERVISION DES TRAVAUX (AON-012-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE SUR LA RN3 ENTRE LE CARREFOUR MADELINE (SOS) ET LE CARREFOUR DE L’AÉROPORT, DANS LA COMMUNE DU CAP-HAÏTIEN (2388 MÈTR
Plannedpipeline.cat.individualINGÉNIEUR RÉSIDENT POUR LA SUPERVISION DES TRAVAUX (AON-012-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE SUR LA RN3 ENTRE LE CARREFOUR MADELINE (SOS) ET LE CARREFOUR DE L’AÉROPORT, DANS LA COMMUNE DU CAP-HAÏTIEN (2388
Plannedpipeline.cat.individualCHEF DE MISSION CONTRÔLE ET SUPERVISION DES TRAVAUX (AON-018-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE CAYES-TORBECK
Plannedpipeline.cat.individualCONTRAT INGÉNIEUR RÉSIDENT POUR CONTRÔLE ET SUPERVISION DES TRAVAUX (AON-018-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE CAYES-TORBECK
Plannedpipeline.cat.individualCONTRAT INGÉNIEUR RÉSIDENT POUR CONTRÔLE ET SUPERVISION DES TRAVAUX (AON-018-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE CAYES-TORBECK
Plannedpipeline.cat.individualINGÉNIEUR TOPOGRAPHE POUR CONTRÔLE ET SUPERVISION DES TRAVAUX (AON-018-RUTAP/2025) DE RÉHABILITATION DU TRONÇON DE ROUTE CAYES-TORBECK
Plannedpipeline.cat.individualWORKS TO IMPROVE MOBILITY BY STRENGTHENING INFRASTRUCTURE RESILIENCE IN THE MUNICIPALITY OF LIMONADE, NORTH DEPARTMENT IN TWO (2) LOTS
PlannedWorksRFBCONTRÔLE DE QUALITÉ DES TRAVAUX DE RÉHABILITATION DU TRONÇON CAYES-TORBECK
PlannedNon-consulting servicesDirect selectionCONTRÔLE DE QUALITÉ DES TRAVAUX DE RÉHABILITATION DU TRONÇON CARREFOUR MADE LINE - CARREFOUR AÉROPORT AU CAP-HAÏTIEN
PlannedNon-consulting servicesDirect selectionFinancial Audit of the RUTAP Project 2025-2028
PlannedConsultingLCSAdvertised 2026-07-08
Estimate (Premium)SUPERVISION DE LA RÉHABILITATION DU TRONÇON DE ROUTE SUR LA RN3 ENTRE LE CARREFOUR MADELINE (SOS) ET LE CARREFOUR DE L’AÉROPORT, DANS LA COMMUNE DU CAP-HAÏTIEN (2388 MÈTRES)
AdvertisedConsultingQCBSAdvertised 2026-07-08
Estimate (Premium)Etudes portant sur l'amélioration de la mobilité urbaine du tronçon Barrière Bouteille / Centre -ville du Cap-Haïtien
AdvertisedConsultingQCBSAdvertised 2026-06-01
Estimate (Premium)Étude portant sur la reconfiguration et l’aménagement des trois (3) carrefours suivant : Carrefour ROND-POINT / PONT NEUF - Carrefour SAMARIE - Carrefour RUE 5 / RUE A
AdvertisedConsultingQCBSAdvertised 2026-04-06
Estimate (Premium)Recrutement d’un Bureau d’Études pour une Assistance Technique (AT) en vue de réaliser les activités ci-après en lien avec les transports urbains en Haïti.
AdvertisedConsultingQCBSAdvertised 2026-03-26
Estimate (Premium)Etude de l'optimisation des itinéraires "tap-tap" le long des corridors sélectionnés
AdvertisedConsultingQCBSAdvertised 2025-07-29
Estimate (Premium)Observatoire régional du transport public informel et de la mobilité urbaine
Closedpipeline.cat.individualDirect selectionAdvertised 2025-11-26
Estimate (Premium)Assistance Technique intégrée pour le déploiement du Pilote de PIC
ClosedConsultingQCBSAdvertised 2024-08-23
Estimate (Premium)Amélioration de la mobilité sur l'axe Toussaint Louverture et A venue Carthagena par la réalisation d'un carrefour denivellé sous le pont de la Ravine du Sud (en 2 lots)
ClosedWorksRFBReconstruction de la route à l'entrée de la plage de Port-Salut (en 1 lot)
ClosedWorksRFBReconstruction de 6 dalots dans les communes de Cayes Jacmel et Marigot (en 3 lots)
ClosedWorksRFBReconstruction de 10 dalots dans les communes de Torbeck, Les Cayes et Maniche (en 5 lots)
ClosedWorksRFBReconstruction de la route de Petite Baie Dumesle, à Ka Nègre,à Savane Douce dévastée par le séisme du 14 août (en 3 lots)
ClosedWorksRFBReconstruction des dalots de Coquette, de Boury dans la commune des Cayes et d'un dalot dans la ville d'Anse-à-Veaudétruits par le séisme du 14 août (en 3 lots)
ClosedWorksRFBReconstruction de 3,5 km de rues et amélioration du drainage à Jérémie dans les localités de Caracolie, de Rochasse, de Ka Kalasse, de Madan Kodo
ClosedWorksRFB