Volcanoes Community Resilience Project
P178161 · Rwanda · Eastern and Southern Africa · Financing: I, D, A, V, 4
Procurement plan: every tender of the project
Feasibility Study, Preliminary Design, and Detailed for Dredging of Satintsyi, Rubagabaga, Giciye, Mukungwa and Nyabarongo rivers with Proper Protection System due to Sedimentation meandering
PlannedConsultingQCBSConsultancy services for the supervision of construction of priority flood mitigation measures/ infrastructure in priority sub- cathcments (Karisimbi system under 1st Batch)
PlannedConsultingQCBSConstruction of priority flood mitigation measures/ infrastructure in priority sub-catchments (Karisimbi System under 1st Batch
PlannedWorksRFBConstruction of fences on fifteen (15) automatic water level monitoring stations located in different districts (Ngororero (1), Rubavu (3), Nyabihu (4), Musanze (4), Gakenke (1), and Burera (2).
PlannedWorksRFBView noticeWinner: PRECIBU (PRECISION BUILDING) LTD· Awarded 2026-07-08Contract amount (Premium)
Supply of Field Equipment for surveys (Bathmetry)
PlannedGoodsRFBView noticeWinner: DC SURVEY LTD· Awarded 2026-07-08Contract amount (Premium)
Individual Consultant: Hydrological and Hydraulic Modeller Expert
Closedpipeline.cat.individualAdvertised 2026-04-02
Estimate (Premium)Framework contract of consultant to conduct VLUAPs
ClosedConsultingQCBSView noticeWinner: ENTREPRISE POUR LA PROTECTION DE L'ENVIRONNEMENT CONSTRUCTION ET TRAVAUX GENERAUX EPECOTGE LTD· Awarded 2026-04-01
Advertised 2026-04-01
Estimate (Premium)Individual Consultant: Hydraulic/Structural Expert
Closedpipeline.cat.individualAdvertised 2026-04-01
Estimate (Premium)Supply of beverages, Tea and Coffee
ClosedGoodsRFBAdvertised 2025-06-11
Estimate (Premium)Maintenance and repair of vehicles and their related spare parts
ClosedNon-consulting servicesRFBAdvertised 2025-06-02
Estimate (Premium)Supply of field equipment for surveys (topography)
ClosedGoodsRFBAdvertised 2025-04-16
Estimate (Premium)Environmental and Social Safeguard instruments for VCRP studies (Vunga corridor feasibility study, stomwater Musanze and Rubavu, dredging feasibility study)
ClosedConsultingQCBSAdvertised 2025-01-21
Estimate (Premium)Supply of Office equipments (furnitures) for VCRP staff
ClosedGoodsRFBAdvertised 2024-11-14
Estimate (Premium)Acquisition of vehicles for VCRP project
ClosedGoodsRFBAdvertised 2024-06-20
Estimate (Premium)Feasibility Study, Preliminary and Detailed Design for flood control measures in Vunga Corridor
ClosedConsultingQCBSAdvertised 2024-06-20
Estimate (Premium)Stormwater master plan study for Musanze and Rubavu cities and development of guideline to linkage the flood maps into spatial plans of districts
ClosedConsultingQCBSAdvertised 2024-06-20
Estimate (Premium)Construction of priority Flood Mitigation measures/infrastructure in priority sub-catchments (Sebeya)
ClosedWorksRFBSupply of Field Equipment for surveys (topography and bathymetry)
ClosedGoodsRFBSupply and installation of Automatic water level monitoring stations
ClosedGoodsRFBSupply of Printers, scanner and photocopiers for staff members
ClosedGoodsRFBSupply of IT equipment and related services for office work (laptops (regular and high performance), data center server space, and monitors)
ClosedGoodsRFBProvision of insurance for project IT equipment and others assets
ClosedNon-consulting servicesRFBConsultancy Services for the Supervision of Construction of priority Flood Mitigation measures/infrastructure in priority sub-catchments (Sebeya)
ClosedConsultingQCBS
Other notices and awards in this project
- Supply and installation of automated green houses for improved Irish potato seeds multiplication.
- Design and Supervision of the Construction Works of the Smart Green Village
Winner: VOYANTS SOLUTIONS PRIVATE LIMITED· Awarded 2026-06-09
- Hiring firm or an NGO to support the livelihood restoration of the relocated community under the Volcanoes Community Resilience Project (VCRP).