[Announcement] Tajihigawa River Improvement Compensation Work (Nukanobashi Temporary Structure 1)
ANNOUNCEMENT
We hereby announce that an open competitive bid will be held as follows, in accordance with the provisions of Article 87 of the Aki Takata City Financial Regulations.
Bidders must comply with the individual items 1 to 5 and the attached "Common Items for Open Competitive Bidding (Post-Qualification Review Type) Announcement" (hereinafter referred to as "Common Items").
Furthermore, this is an electronic bidding case using the Aki Takata City Electronic Bidding System (hereinafter referred to as "Electronic Bidding System"), and bidding procedures must be carried out in accordance with the Aki Takata City Electronic Bidding Implementation Guidelines (hereinafter referred to as "Electronic Guidelines") (except in cases where the Electronic Guidelines specifically provide for exceptions).
October 19, 2026
Etsushi Fujimoto, Mayor of Aki Takata City
1. Ordering Details
(1) Work Name: Tajihigawa River Improvement Compensation Work (Nukanobashi Temporary Structure 1)
(2) Work Location: Yoshida-cho, Aki Takata City, Yoshida
(3) Work Outline:
[Laying Work]
Hard vinyl chloride pipe φ350 L=17m
Ductile cast iron pipe φ200 L=107.24m
Polyethylene pipe φ75 L=46.52m
[Electrical Equipment]
No. 3 Manhole Pump Temporary Work: 1 set
No. 4 Manhole Pump Temporary Work: 1 set
(4) Construction Period (Scheduled): From the day after the contract date to March 31, 2027
(5) Estimated Price: ¥25,128,000 (excluding consumption tax equivalent)
(6) Method of Selecting Successful Bidder: Subject to low bid price investigation system (in accordance with the "Low Bid Price Investigation System Handling Manual for Construction Works")
(7) Bid Bond: Exempt
(8) Contract Deposit: Payment (Common Item 17)
(9) Qualification Requirement Documents: To be submitted after bid opening (Announcement 3(7) and Common Item 6)
(10) Other: -
2. Bid Participation Qualifications
In addition to the requirements listed in Common Item 3(2), all of the following requirements must be met.
Requirements other than technical requirements
(1) Reiwa 7/8 Aki Takata City Construction Works Bid Participation Qualification
a. Certified business type: Civil Engineering (General) Works
(2) Location of business office (Article 3, Paragraph 1 of the Construction Industry Act): Must have a principal business office within Aki Takata City.
(3) Average annual completed construction value: For the business type specified in 2(1)a, it must be equal to or greater than 1/2 of the estimated price listed in 1(5).
(4) Requirement for specific construction business license: A specific construction business license is required if subcontracting amounts to or exceeds the amount specified in Article 2 of the Cabinet Order for the Construction Industry Act.
(5) Not a contractor for design work, etc. (listed on the right) or have capital and personnel relations with such contractor.
Fukken Chosa Sekkei Co., Ltd.
Technical Requirements
(6) Prime contractor construction experience
a. Type (and scale): Pipeline excavation work
b. Completion inspection: Must have undergone a completion inspection between April 1, 2011, and October 18, 2026.
c. Other: Limited to public works, etc., ordered by the national government, local governments, or public corporations as defined in Table 1 of the Corporation Tax Act.
(7) Assigned Engineer
a. Requirement for dedicated assignment: Dedicated assignment is required if the contract amount is equal to or exceeds the amount specified in Article 27, Paragraph 1 of the Cabinet Order for the Construction Industry Act.
b. Qualifications, etc.: If subcontracting amounts to or exceeds the amount specified in Article 2 of the Cabinet Order for the Construction Industry Act, the person must meet the requirements of Article 15, Paragraph 2, Item a of the Construction Industry Act (Class 1 Civil Engineering Construction Management Engineer, etc.) and have the qualifications of a supervising engineer; otherwise, the person must meet the requirements of Article 7, Paragraph 2, Item a, b, or c of the Construction Industry Act.
c. Experience: Not required
(Note) * For (1)b and c, if the business type in (1)a is prestressed concrete construction or steel bridge superstructure construction, it shall be for civil engineering (general) works or steel structures, respectively.
* For (2) and (4), if the business type in (1)a is prestressed concrete construction, slope treatment work, or steel bridge superstructure construction, it shall be for civil engineering (general) works, scaffolding, earthwork, and concrete works, or steel structures, respectively.
* (3) refers to the comprehensive evaluation score notification or examination standard date for management item examination attached when applying for qualification review of (1), or a management item examination comprehensive evaluation score notification or examination standard date that is later than this.
* (5) Capital and personnel relations refer to the following cases:
- Owns more than half of the total issued shares of the said contractor.
- The representative director concurrently serves as the representative director of the said contractor.
* For (7)b, if the business type in (1)a is prestressed concrete construction, slope treatment work, or steel bridge superstructure construction, it shall be for civil engineering (general) works, scaffolding, earthwork, and concrete works, or steel structures, respectively.
* For (6) and (7), if it is experience as a member of a specific construction joint venture or a regular construction joint venture, it is limited to those with an investment ratio of 20% or more.
3. Bidding Schedule, Procedures, etc.
Period/Date
Location/Method, etc.
(1) Design Document Viewing
From October 19, 2026, to November 4, 2026, daily (excluding holidays)
From 9:00 AM to 4:30 PM
Aki Takata City Hall, Main Building, 2nd Floor, Viewing Room
and Electronic Bidding System (791 Yoshida-cho, Aki Takata City)
(2) Questions regarding design documents
From October 19, 2026, to November 2, 2026, daily (excluding holidays)
From 9:00 AM to 4:30 PM
Aki Takata City Planning Department, Finance Division, Bidding and Inspection Section
(791 Yoshida-cho, Aki Takata City)
Tel: 0826-42-5623
Submit in writing
(3) Viewing of answers to questions
Until November 4, 2026, daily (excluding holidays)
From 9:00 AM to 4:30 PM
- Aki Takata City Hall, Main Building, 2nd Floor, Viewing Room
and Electronic Bidding System (791 Yoshida-cho, Aki Takata City)
- Posted on the Aki Takata City website
http://www.akitakata.jp/
(4) Submission of technical documents for comprehensive evaluation
- -
(5) Bidding
From 9:00 AM on November 5, 2026, to 4:00 PM on November 6, 2026
* If submitting a written bid as stipulated in the Electronic Guidelines, from 4:00 PM on November 5, 2026, to 9:00 AM on November 6, 2026.
Electronic Bidding (Submission location for written bids as stipulated in the Electronic Guidelines is the same as (2))
(6) Bid Opening
9:32 AM on November 9, 2026
Via the Electronic Bidding System
(7) Submission of Qualification Requirement Documents
From the date of receiving the request for submission of qualification requirement documents until the submission deadline specified in the request, daily (excluding holidays)
From 9:00 AM to 3:00 PM
Submit in person or via the Electronic Bidding System (If submitting in writing, the submission location is the same as (2))
(Note) * Holidays refer to holidays as defined in Article 1 of the Aki Takata City Holiday Ordinance.
4. Construction Cost Breakdown (Common Item 2)
The construction cost breakdown form can be downloaded from the Aki Takata City website.
http://www.akitakata.jp/
5. Inquiries
Aki Takata City Planning Department, Finance Division, Bidding and Inspection Section
(791 Yoshida-cho, Aki Takata City Tel: 0826-42-5623)
TEMPORARY QUANTITY SUMMARY TABLE
1-2
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
Pipeline Work (Inner Diameter φ350VU)
Route Length
m
19.40
Pipe Body Length
m
17.00
Pipe Laying Work
VU350
m
17.00
17.0
Rubber Ring Joint
Straight Pipe
Hard Vinyl Chloride Pipe
SRA350 L=4,000
Piece
2
2
Plain End Straight Pipe
〃
PE350 L=4,000
Piece
3
3
Flexible Joint
Manhole Joint
φ350, Upstream
Piece
3
3
Flexible Joint
φ350, Downstream
Piece
3
3
Earthwork
Excavation Work
0.28m3 Backhoe
m3
16.3
20
Sand Base
Tamping Compaction
m3
1.28
1
Sand Backfill
Tamping Compaction
m3
4.10
4
Backfill Work
0.28m3 Backhoe
m3
8.3
80
0.28m3 Backhoe
4tDT (to temporary storage)
Earthwork Disposal
Transport Distance: 0.5km
m3
7.1
7
Loading (Loose)
Earth and Sand
m3
7.1
7
0.80m3 Backhoe
10tDT (to receiving facility)
Residual Soil Disposal Work
Transport Distance: 11.3km
m3
7.1
7
Pipeline Work (Inner Diameter φ200GX)
Route Length
m
107.24
Pipe Body Length
m
107.95
Pipe Laying Work
DIP-GX200
m
107.95
108.0
GX Type Straight Pipe
S Type
DIP-GXφ200 L=5,000
Piece
8
8
GX Type Straight Pipe (for cutting)
Type 1
〃
DIP-GXφ200 L=5,000
Piece
14
14
GX Type Single Socket Elbow
〃
DIP-GXφ200×90°
Piece
1
1
GX Type Single Socket Elbow
〃
DIP-GXφ200×45°
Piece
9
9
GX Type Single Socket Elbow
〃
DIP-GXφ200×22 1/2°
Piece
2
2
GX Type Single Socket Elbow
〃
DIP-GXφ200×11 1/4°
Piece
2
2
QUANTITY SUMMARY TABLE
Ductile Cast Iron Pipe GX Type
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
QUANTITY SUMMARY TABLE
Ductile Cast Iron Pipe GX Type
Single Socket Elbow
Pipe Laying Work
GX Type
〃
DIP-GXφ200×5 5/8°
Piece
22
22
GX Type Joint Ring
〃
DIP-GXφ200
Piece
2
2
GX Type Double Socket Short Pipe
〃
DIP-GXφ200
Piece
6
6
GX Type Double Socket T-Junction
〃
φ200×φ200
Piece
1
1
GX Type Cap
〃
φ200
Piece
1
1
Liner
φ200
Piece
9
9
Support Bracket
Piece
10
-
*Measured as bridge quantity
U-Bolt
Piece
10
-
〃
Straight Joint
φ200
Piece
22
22
Reducer
〃
φ200
Piece
35
35
Grooving
"Simultaneous Cutting and Grooving"
〃
φ200
Piece
23
-
Accounted as
Pipe Cutting Work
φ200
Piece
23
23
Accounted as
Installation Length: 38.2m
Pipe Protection Work
Steel Plate
22×1524×3048
m2
60.5
61
Days: 120, 13 sheets
Earthwork
Excavation Work
0.28m3 Backhoe
m3
31.0
30
Sand Backfill
Tamping Compaction
m3
11.10
10
Backfill Work
0.28m3 Backhoe
m3
17.3
20
0.28m3 Backhoe
4tDT (to temporary storage)
Earthwork Disposal
Transport Distance: 0.5km
m3
11.8
10
Loading (Loose)
Earth and Sand
m3
11.8
10
0.80m3 Backhoe
10tDT (to receiving facility)
Residual Soil Disposal Work
Transport Distance: 11.3km
m3
11.8
10
Pipeline Work (Inner Diameter φ75PE)
Route Length
m
45.88
Pipe Body Length
m
46.52
Pipe Laying Work
PEφ75
m
46.52
46.5
〃
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
QUANTITY SUMMARY TABLE
Single Socket Straight Pipe
Pipe Laying Work
Polyethylene Pipe
PE-SEφ75 L=5,000
Piece
9
9
Elbow
〃
PE-90BSφ75
Piece
1
1
Elbow
〃
PE-45BSφ75
Piece
5
5
Elbow
〃
PE-22BSφ75
Piece
2
2
Elbow
〃
PE-11BSφ75
Piece
2
2
Color
〃
PE-Dφ75
Piece
3
3
Flanged Short Pipe
〃
PE-Fφ75
Piece
1
1
Cap
〃
PE-Cφ75
Piece
1
1
Flanged Branch Pipe
〃
φ75×φ75
Piece
1
1
K Type Short Pipe No. 1
Ductile Cast Iron Pipe
DIP-Kφ75
Piece
2
2
Fusion Joint
Joint
φ75
1 port
19
19
Fusion Joint
〃
φ75
2 ports
3
3
Flanged Joint
〃
φ75
ports
2
2
Mechanical Joint
〃
φ75
ports
2
2
Pipe Cutting Work
φ75
ports
8
8
Pipe Protection Work
Sleeve SPφ150
m
10.3
10
Installation Length: 9.7m
Steel Plate
22×1524×3048
m2
18.6
19
Days: 120, 4 sheets
Earthwork
Excavation Work
0.28m3 Backhoe
m3
23.0
20
Sand Base
〃
m3
2.53
3
Sand Backfill
〃
m3
4.43
4
Backfill Work
0.28m3 Backhoe
m3
15.8
20
0.28m3 Backhoe
4tDT (to temporary storage)
Earthwork Disposal
Transport Distance: 0.5km
m3
5.5
6
Loading (Loose)
Earth and Sand
m3
5.5
6
0.80m3 Backhoe
10tDT (to receiving facility)
Residual Soil Disposal Work
Transport Distance: 11.3km
m3
5.5
6
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
QUANTITY SUMMARY TABLE
Manhole Installation Work
No. 1 Assembly Manhole
Depth 3m or less
Location
4
T-14
Manhole Frame
Inner Diameter 600mm, with frame H=110mm
Set
4
4
Adjustment Fitting
H=25mm
Set
2
2
〃
H=45mm
Set
2
2
Adjustment Ring
Inner Diameter 600mm
H=50mm
Piece
3
3
〃
〃
H=100mm
Piece
1
1
Sloped Block
Inner Diameter 600/670mm
H=150mm
Piece
3
3
〃
Inner Diameter 600/900mm
H=600mm
Piece
1
1
Vertical Block
Inner Diameter 900mm
H=300mm
Piece
1
1
Body Block
Inner Diameter 900mm
H=900mm
Piece
3
3
〃
〃
H=1800mm
Piece
1
1
Base Slab
H=130mm
Piece
4
4
Split Horseshoe Cut for Manhole
Cutting Work
VUφ350
Location
1
1
〃
VUφ350
Location
2
2
〃
PEφ75
Location
2
2
Assembly Manhole Installation Work
3.0m or less
Location
4
4
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
QUANTITY SUMMARY TABLE
T-14
Vinyl Manhole
Protective Frame
Inner Diameter 300mm (with settlement prevention plate)
Set
1
1
Sealed Inner Lid
φ300
Piece
1
1
Plain End Straight Pipe
Hard Vinyl Chloride Pipe
PE300 L=4,000
Piece
--
150-300 Invert
KDR H=1,000
Piece
1
1
Included in installation work
Vinyl Small Manhole Installation Work
Less than 2.0m
Location
1
1
Main Pipe Diameter 350mm
Branch Pipe Installation Work
Outer Branch Pipe Installation Work
Branch Pipe Diameter 200mm
Location
1
1
Step 1.7m
Branch Pipe 90-degree Elbow
VSφ350-200
Piece
1
1
Adhesive Socket Collar
WTBφ200
Piece
1.0
1
Plain End Straight Pipe
VUφ200×4000
Piece
0.3
0.3
Branch Pipe 90-degree Elbow
90STφ200
Piece
1
1
Concrete
18N/mm2
m3
0.5
0.5
18-8-40BB
Formwork
m2
3.3
3
Crushed Stone Base
RC-40, t=20cm
0.3m2
m2
0.06
0.06
Pavement Demolition and Restoration Work
Pavement Cutting Work
Asphalt t=20cm or less
m
32.6
33
t=4cm Pavement Slab Demolition Work
Asphalt
0.28m3 Backhoe
m2
17.2
17
4tDT (to temporary storage)
Asphalt Debris Disposal
Asphalt
Transport Distance: 0.5km
m3
0.9
0.9
Asphalt Debris Loading
Asphalt
m3
0.9
0.9
10tDT (to receiving facility)
Asphalt Debris Transport
Asphalt
Transport Distance: 11.3km
m3
0.9
0.9
Asphalt Debris Disposal Work
Asphalt
t
2.1
2
0.9m3*2.35=2.1t
Pavement Work
Regenerated Dense Graded Asphalt (20) t=3cm
m2
6.4
6
RC-30
Base Course Work
Regenerated Crushed Stone t=12cm
m2
6.4
6
Excavation for Pavement
m3
0.1
0.1
Leveling
m2
7.7
8
t=5cm
Surface Course Work
Regenerated Dense Graded Asphalt (20)
Road width less than 1.4m
m2
14.1
14
Name
Type
Detail
Shape
Dimensions
Unit
Quantity
Accounted Quantity
Remarks
QUANTITY SUMMARY TABLE