Supervising Section: Work Name: Work Location: Start Date: Completion Date: Designated Contractor Selection Date: Venue: Date: Reiwa 8, September 2 (Wednesday) - Reiwa 8, September 28 (Monday) Venue: 8:30 AM - 3:00 PM Date: Reiwa 8, September 29 (Tuesday) 9:10 AM Venue: Design Amount (incl. tax): Design Amount (excl. tax): Bid Security: Minimum Price System: Contract Security: Breakdown Submission: Diet Approval: Bid Information: Urban Development Division: R8 Akashi Line No. 2 Implementation Design Geological Survey Work: Komatsushima City, Obayashi Town, Aza Nakatsu: From the day after the contract signing date to February 15, Reiwa 9: Reiwa 8 Domestic Civil Engineering Consultants (Geological Survey): - - Komatsushima City Website: Reiwa 8, September 25 (Friday): Reiwa 8, September 28 (Monday): Komatsushima City Hall, 4th Floor, Small Conference Room: \6,922,300: \6,293,000: Exempt: Applicable: Required: Not Required (Regarding ordered project): Komatsushima City, Yokochocho 1-1, Phone: 0885-32-2118, Urban Development Department, Urban Development Division: FAX: 0885-33-2104 (Regarding bid execution): Komatsushima City, Yokochocho 1-1, Phone: 0885-32-2121, Urban Development Department, Contract and Inspection Division: FAX: 0885-33-1559: Scheduled Period: Site Briefing Session: Design Document Viewing: Bid Submission Period: Bid Opening: Remarks: - This bid is an electronic bidding project utilizing the Tokushima Prefecture Electronic Bidding System.
- This bid will be executed and the contract concluded based on the Komatsushima City Competitive Contract Bidding Conditions, Komatsushima City Contract Regulations, Consignment Contract Terms, and Komatsushima City Electronic Bidding System Operation Standards, etc.
- The contract amount will be the bid amount plus 10% of that amount (if there is a fraction of less than 1 yen, that fraction will be rounded down). Therefore, bidders must enter the amount equivalent to 100/110 of their estimated contract amount as the bid amount, regardless of whether they are subject to consumption tax and local consumption tax.
- Delegation of bidding to other construction-related companies is not permitted for this bid.
- This designation notice may be canceled under certain circumstances.
- Bid opening may be postponed due to circumstances.
- If you wish to decline this designation, please submit a letter of withdrawal.
- The bid execution will be conducted once. If there are no valid bids within the limit of the estimated price, the bidding will be closed.
- Bidders who have not viewed the design documents, etc. and attended the site briefing session mentioned in the designation notice cannot participate in the bid.
* Design documents can also be viewed at the Contract and Inspection Division on the 4th floor of Komatsushima City Hall.
Contact Information:
(Consignment Name) R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Source: Processed from Geospatial Information Authority of Japan map
Location Map
Mechanical Boring φ86mm L=15m N=1 unit φ66mm L=33m N=1 unit
Reiwa 8 Fiscal Year
Consignment Design Document
Komatsushima City
Consignment Number:
Work Days:
Work Period:
Route Name, etc.: Akashi Line No. 2
Construction Location: Komatsushima City, Obayashi Town, Aza Nakatsu
Consignment Name: R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Consignment Fee: \ Yen
Geological Survey Work: Mechanical Boring φ86mm L=15m N=1 unit / φ66mm L=33m N=1 unit: Standard Penetration Test N=33 times, Laboratory Soil Test: Lump sum, Data organization and compilation: Lump sum, Cross-section drawing creation: Lump sum, Comprehensive analysis and compilation: Lump sum.
Consignment Overview:
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Summary Table:
Cost Item / Work Type / Classification / Sub-classification: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Work Expenses: 1 Unit: Consignment Fee: 1 Unit: Consignment Fee: 1 Unit
Total: Komatsushima City 1
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Consignment Fee Breakdown:
Cost Item / Work Type / Classification / Sub-classification: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Geological Survey Work: 1 Unit
Direct Survey Expenses (Geological Survey Work): 1 Unit
Direct Survey Expenses (Accumulated): 1 Unit
Common: 1 Unit
Meetings (Geological Survey Work): Intermediate Meeting: 1 time: 1 Work: Unit 1
Mechanical Boring: 1 Unit
Mechanical Boring (Non-core) Soil Boring: 15m: 1 Unit: Unit 2
Mechanical Boring (Non-core) Soil Boring: 30m: 1 Unit: Unit 3
Mechanical Boring (All-core) Rock Boring: 3m: 1 Unit: Unit 4
Sounding and In-situ Testing: 1 Unit
Standard Penetration Test: Cohesive Soil/Silt: 16 times: Unit 5
Standard Penetration Test: Sand/Sandy Soil: 6 times: Unit 6
Komatsushima City 2
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Consignment Fee Breakdown:
Cost Item / Work Type / Classification / Sub-classification: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Standard Penetration Test: Gravelly Soil: 8 times: Unit 7
Standard Penetration Test: Soft Rock: 3 times: Unit 8
Borehole Load Test (Pressuremeter/Borehole Jack Test): Normal Load (≤ 2.5MN/m²): Within GL-50m: 1 time: Unit 9
Sampling: 1 Unit
Fixed Piston Type Thin Wall Sampler (Thin Wall Sampling): 1 unit: Unit 10
Laboratory Soil Test: 1 Unit
Soil Specific Gravity Test: 20 samples
Soil Moisture Content Test: 20 samples
Soil Particle Size Distribution Test: 20 samples
Liquid Limit Test: 11 samples
Plastic Limit Test: 11 samples
Wet Density Test: 1 sample
Komatsushima City 3
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Consignment Fee Breakdown:
Cost Item / Work Type / Classification / Sub-classification: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Unconfined Compressive Strength Test: 1 sample
Consolidation Test: 1 sample
Analysis, etc. Survey Work: 1 Unit
Data Organization and Compilation: Direct Labor Costs (Direct Survey Expenses Portion): 1 Work: Unit 11
Cross-section Drawing Creation, etc.: Direct Labor Costs (Direct Survey Expenses Portion): 1 Work: Unit 12
Comprehensive Analysis and Compilation: Direct Labor Costs (Analysis, etc. Survey Expenses Portion): 1 Work: Unit 13
Direct Expenses: 1 Unit
Electronic Deliverables Creation Fee (Proportional Calculation): 1 Unit
Total Direct Survey Expenses: 1 Unit
Indirect Survey Expenses: 1 Unit
Transportation Expenses (Accumulated): 1 Unit
Truck [with crane]: Common name 2-ton class, lifting capacity 2.9t: 2 units: Operating Days
Komatsushima City 4
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
Consignment Fee Breakdown:
Cost Item / Work Type / Classification / Sub-classification: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Preparation Expenses (Accumulated): 1 Unit
Borehole Closure: 2 locations: Unit 14
Water Supply Expenses (Pump Operation): ≥ 20m, ≤ 150m: 1 location: Unit 15
Temporary Facilities Expenses (Accumulated): 1 Unit
Flat ground, scaffolding height ≤ 0.3m: 1 location: Unit 16
Travel Expenses (Proportional Calculation): 1 Unit
Net Survey Expenses: 1 Unit
Survey Miscellaneous Expenses: 1 Unit
Survey Work Price: 1 Unit
Consumption Tax, etc.: 1 Unit
Total: Komatsushima City 5
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 1]
Meetings (Geological Survey Work) Intermediate Meeting: 1 time: Per Unit:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Start of Work: 1 time: Unit 17
Intermediate Meeting: 1 time: Unit 18
End of Delivery: 1 time: Unit 19
Total: Per Unit: Komatsushima City 6
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 2]
Mechanical Boring (Non-core) Soil Boring: 15m: Per Unit:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Soil Boring (Non-core Boring) φ86mm: Cohesive Soil/Silt: 7m
Soil Boring (Non-core Boring) φ86mm: Sand/Sandy Soil: 4m
Soil Boring (Non-core Boring) φ86mm: Gravelly Soil: 4m
Total: Per Unit: Komatsushima City 7
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 3]
Mechanical Boring (Non-core) Soil Boring: 30m: Per Unit:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Soil Boring (Non-core Boring) φ66mm: Cohesive Soil/Silt: 16m
Soil Boring (Non-core Boring) φ66mm: Sand/Sandy Soil: 6m
Soil Boring (Non-core Boring) φ66mm: Gravelly Soil: 8m
Total: Per Unit: Komatsushima City 8
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 4]
Mechanical Boring (All-core) Rock Boring: 3m: Per Unit:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Rock Boring (All-core Boring) φ66mm: Soft Rock: 3m
Total: Per Unit: Komatsushima City 9
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 5]
Standard Penetration Test Cohesive Soil/Silt: Per Time:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Standard Penetration Test: Cohesive Soil/Silt: 1 time
Total: Per Unit: Komatsushima City 10
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 6]
Standard Penetration Test Sand/Sandy Soil: Per Time:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Standard Penetration Test: Sand/Sandy Soil: 1 time
Total: Per Unit: Komatsushima City 11
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 7]
Standard Penetration Test Gravelly Soil: Per Time:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Standard Penetration Test: Gravelly Soil: 1 time
Total: Per Unit: Komatsushima City 12
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 8]
Standard Penetration Test Soft Rock: Per Time:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Standard Penetration Test: Soft Rock: 1 time
Total: Per Unit: Komatsushima City 13
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 9]
Borehole Load Test (Pressuremeter/Borehole Jack Test) Normal Load (≤ 2.5MN/m²) Within GL-50m: Per Time:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Borehole Load Test (Pressuremeter/Borehole Jack Test) Normal Load (≤ 2.5MN/m²): 1 time
Total: Per Unit: Komatsushima City 14
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 10]
Fixed Piston Type Thin Wall Sampler (Thin Wall Sampling): Per Unit:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Fixed Piston Type Thin Wall Sampler (Thin Wall Sampling) Cohesive Soil: 1 unit
Total: Per Unit: Komatsushima City 15
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 11]
Data Organization and Compilation Direct Labor Costs (Direct Survey Expenses Portion): Per Work:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Data Organization and Compilation: Direct Labor Costs (Direct Survey): 1 Work
Subtotal: Correction Factor: Total: Per Unit: Komatsushima City 16
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 12]
Cross-section Drawing Creation, etc. Direct Labor Costs (Direct Survey Expenses Portion): Per Work:
Name / Specifications: Quantity / Unit / Unit Price / Amount: Detailed Unit Price Number / Standard:
Cross-section Drawing Creation, etc.: Direct Labor Costs (Direct Survey): 1 Work
Subtotal: Correction Factor: Total: Per Unit: Komatsushima City 17
R8 Akashi Line No. 2 Implementation Design Geological Survey Work
[Consignment Unit Price Table No. 13]
Comprehensive Analysis and Compilation Direct Labor Costs