Tenders/Supply, Installation, Testing & Commissioning of 06 Nos New 132KV grid-stations a/w Transmission Lines (Lot-wise) Lot-I: 132KV D.G.Khan-III & Shah Jamal Grids, Lot-II: 132KV Khanewal II & Arifwala-II Grids . Lot-III: 132KV R.Y.Khan III & Layyah-II Grids

Supply, Installation, Testing & Commissioning of 06 Nos New 132KV grid-stations a/w Transmission Lines (Lot-wise) Lot-I: 132KV D.G.Khan-III & Shah Jamal Grids, Lot-II: 132KV Khanewal II & Arifwala-II Grids . Lot-III: 132KV R.Y.Khan III & Layyah-II Grids

This tender is closed

The submission deadline for this tender has passed. It is no longer accepting bids.

Browse open Energy & Power tenders in Pakistan

About This Opportunity

Invitation for Bids | Project: Electricity Distribution Efficiency Improvement Project | Method: Request for Bids | Ref: PK-MEPCO-560389-CW-RFB

This is a works contract in the energy and power and architecture and engineering sectors. Located in Pakistan, Asia, this opportunity is open to firms and consortiums.

Published through WB - World Bank, a multilateral development bank that follows standardized international procurement guidelines. Projects funded by multilateral institutions are generally open to international bidders from eligible member countries for civil works in the energy and power sector. Works contracts of this nature generally require demonstrated experience in similar infrastructure projects, adequate equipment and technical personnel, and financial capacity including bank guarantees.

Description

Project: Electricity Distribution Efficiency Improvement Project

Specific Procurement Notice

Request for Bids

Plant

Design, Supply and Installation

(Single Stage Two-envelope Bidding Process, Without Prequalification)

Employer: Multan Electric Power Company (MEPCO)

Project: Electricity Distribution Efficiency Improvement Project (EDEIP)

Contract title: Design, Supply, Installation, Testing & Commissioning of

Lot-I: 132kV Grid Stations along with Transmission Lines DG Khan III & Shah Jamal

Lot-II: 132kV Grid Stations along with Transmission Lines Khanewal II & Arif Wala II

Lot-III: 132kV Grid Stations along with Transmission Lines Layyah-II and Rahim Yar Khan III

Country: Pakistan

Loan No.: IBRD -9318-PK

RFB No: PK –MEPCO – 560389-CW-RFB

Issued on: 10August, 2026

1. The Islamic Republic of Pakistan has received financing from the World Bank toward the cost of the Electricity Distribution Efficiency Improvement Project (EDEIP) and intends to apply part of the proceeds toward payments under the multiple contracts for Design, Supply and Installation, Testing of Six Nos. 132kV Grid stations along with Transmission Lines, 9000 Nos. Transformer Monitoring System and 46 Nos. HT feeders:

The current Invitation for Bids and bidding is only for the Contract for Design, Supply, Installation, Testing & Commissioning:

Lot-I: 132kV Grid Stations along with Transmission Lines DG Khan III & Shah Jamal

Lot-II: 132kV Grid Stations along with Transmission Lines Khanewal II & Arif Wala II

Lot-III: 132kV Grid Stations along with Transmission Lines Layyah-II and Rahim Yar Khan III

The Borrower shall process the payments using the Direct Payment disbursement method, as defined in the World Bank’s Disbursement Guidelines for Investment Project Financing, except for those payments, which the contract provides to be made through letter of credit.

2. The Multan Electric Power Company (MEPCO) now invites sealed Bids from eligible Bidders for Design, Supply, Installation, Testing & Commissioning:

Lot-I:

132kV Grid Station DG Khan III, District DG Khan (30° 8'26.45"N 70°40'39.05"E) consisting of new 2 Nos. 132/11kV 13MVA Power Transformers, 02 Nos. 132kV Transformer Bays, 02 Nos. 132kV Lines Bays and 01 No PT Bay along with 0.5 Km, D/C ACSR Lynx 132kV I/O 500KV DG Khan-132KV Shah Sadardin Transmission Line &

132kV Grid Station Shah Jamal Muzaffargarh District (29°57'20.35"N, 70°58'58.03"E) consisting of new 1 No. 132/11kV 1x40MVA Power Transformers, 01 No. 132kV Transformer Bay, 02 Nos 132kV Lines Bays and 01 No PT Bay along with 14Km, D/C ACSR Lynx F/F 132kV Shah Jamal, I/O 220kV MuzafarGarh-132kV DG Khan Transmission Line.

Required completion period is 12 months. Minimum average annual turnover requirement is Fourteen (14) million US$. The cash-flow requirement is two million and three hundred thousand (2.3 million) US$. Experience in High Voltage Substations 110 kV or above under contracts in the role of contractor, joint venture member or management contractor for at least five (5) years starting 1st January 2021.

Lot-2:

132kV Grid Station Khanewal II District Khanewal (30°15'45.84"N, 71°55'7.21"E) consisting of new 2 Nos. 132/11kV 40MVA Power Transformers, 02 Nos 132kV Transformer Bays, 02 Nos 132kV Lines Bays and 01 No PT Bay along with 01Km, D/C ACSR Lynx I/O 132kV NGPS - Khanewal Transmission Line &

132kV Grid Station Arif Wala II District Pakpatan (30°17'3.33"N, 73° 2'27.46"E) consisting of new 2 Nos. 132/11kV 40MVA Power Transformers, 02 Nos 132kV Transformer Bays, 02 Nos 132kV Lines Bays and 01 No PT Bay along with 01 Km, D/C ACSR Rail I/O 132kV Qabula- Arifwala Transmission Line.

Required completion period is 12 months. Minimum average annual turnover requirement is Fifteen (15) million US$. The cash-flow requirement is Two million and five hundred thousand (2.5 million) US$. Experience in High Voltage Substations 110 kV or above under contracts in the role of contractor, joint venture member or management contractor for at least five (5) years starting 1st January 2021.

Lot-III

132kV Grid Station Layyah II District Layyah (30°57'28.11"N, 70°58'57.22"E) consisting of new 2 Nos. 132/11kV 40MVA Power Transformers, 02 Nos 132kV Transformer Bays, 02 Nos 132kV Lines Bays and 01 No PT Bay along with 0.5 Km, D/C ACSR Rail I/O 132kV Kot Addu - Layyah Transmission Line, &

132kV Grid Station Rahim Yar Khan III District Rahim Yar Khan (28°33'20.53"N, 70°16'39.43"E) consisting of new 2 Nos. 132/11kV 40MVA Power Transformers, 02 Nos 132kV Transformer Bays, 02 Nos 132kV Lines Bays and 01 No PT Bay along with 4.6Km, D/C ACSR Rail I/O 132kV RYK Industrial Estate- R.Y. Khan New Transmission Line

Required completion period is 12 months. Minimum average annual turnover requirement is Seventeen (17) million US$. The cash-flow requirement is Two million and eight hundred thousand (2.8 million) US$. Experience in High Voltage Substations 110 kV or above under contracts in the role of contractor, joint venture member or management contractor for at least five (5) years starting 1st January 2021.

3. Bidding will be conducted through international competitive procurement using a Request for Bids (RFB) as specified in the World Bank’s ā€œProcurement Regulations for IPF Borrowers dated September 2023 & February 2025 and is open to all eligible Bidders as defined in the Procurement Regulations.

4. Bids will be evaluated in accordance with the evaluation process set out in the bidding documents. The following weightings shall apply for Rated Criteria (including technical and non-price factors): 30 %. and for Bid cost: 70 %.

5. Interested eligible Bidders may obtain further information from the office of Chief Engineer (Development) PMU MEPCO Multan and inspect the bidding document during office hours i.e. 08:00Hrs to 16:00 Hrs. at the address given below (see No. 10).

6. The eligible Bidders may download the Bidding Document in English at no cost from the websites: www.mepco.com.pk . Bidders opting to download the Bidding Documents from the stated website shall inform MEPCO, in writing at the address given below failing which MEPCO shall not be responsible if they do not receive clarifications and amendments, if any. The documents can also be collected free of cost in person or can be sent by courier services for an additional amount of Rs.2000/- for domestic delivery and US$90 or equivalents for international delivery. No liability will be accepted for loss or late delivery of the documentsā€

7. Bids must be delivered to the address below (see No.10) on or before 11:00Hrs, 23September, 2026. Electronic bidding will not be permitted. Late Bids will be rejected. The outer Bid envelopes marked ā€œORIGINAL BIDā€, and the inner envelopes marked ā€œTECHNICAL PARTā€ will be publicly opened in the presence of the Bidders’ designated representatives and anyone who chooses to attend, at the address below (see no. 10) on 23 September, 2026 at 11:00Hrs. All envelopes marked ā€œFINANCIAL PARTā€ shall remain unopened and will be held in safe custody of the Employer until the second public Bid opening.

8. All Bids must be accompanied by a Bid-Securing Declaration.

9. Attention is drawn to the Procurement Regulations requiring the Borrower to disclose information on the successful bidder’s beneficial ownership, as part of the Contract Award Notice, using the Beneficial Ownership Disclosure Form as included in the bidding document.

10. The address referred to above is:

Chief Engineer (Development) PMU MEPCO

1st Floor, MEPCO Circle Building, Khanewal Road Multan Pakistan

Tel: 92-61-9220248, Fax: 92-61-9220187,

E-mail: cedev.mepco@gmail.com

Data provenance

This notice is sourced from WB - World Bank and was originally published on August 10, 2026. Last refreshed 54 days ago. Reference: OP00461490. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About Electricity Distribution Efficiency Improvement Project

Electricity Distribution Efficiency Improvement Project has issued 43 procurement notices on BidsFactory, including 3 currently open and 16 awarded contracts. Activity concentrates in Information & Communication Technology, Energy & Power, and General Supplies & Services. All notices are published for Pakistan. Notices are distributed via WB - World Bank. Most recent publication: October 21, 2026.

Frequently asked questions about this tender

Where will the contract be performed?

The contract is for delivery in Pakistan. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit WB - World Bank to access the full notice, required documents, and submission instructions. Quote reference OP00461490 when communicating with the contracting authority.

Is this tender still accepting bids?

No — the submission deadline has passed. The notice is archived for reference. To find open opportunities, use the filters above to browse current tenders.

Who is the contracting authority?

This notice was issued by Electricity Distribution Efficiency Improvement Project in Pakistan. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Works contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

Find tenders like this automatically

Premium shows the full details of every tender like this one and alerts you instantly when a new one is published.

See plans