Multimodal Transport and Logistics Project.
P512330 · Madagascar · Eastern and Southern Africa · Financing: I, D, A, 8, 0
Procurement plan: every tender of the project
Complete project management for the implementation of dematerialized management and integrated security solutions for the ports of Majunga and Toliara in three lots
PlannedConsultingQCBSSupervision mission for (i) the development works of the artificial canals from Vohipeno to Farafangana and (ii) the development works of the artificial canals from Mananjary to Vohipeno
PlannedConsultingQCBSStudy for the development of national maritime cabotage
PlannedConsultingQCBSRecruitment of an external audit firm responsible for the financial and accounting audit, covering the fiscal years 2026, 2027, and 2028, of the preparatory phase and components 2, 3, and 4 of the PTML project
PlannedConsultingLCSSupply of 100,275 metal sleepers for rails
PlannedGoodsRFBAcquisition de la version mis à niveau du logiciel TOM²PRO, Migration de la version TOMP²RO Windows à la version TOM²PRO WEB, Formation des utilisateurs, Hébergement et Infogérance.
PlannedGoodsDirect selectionComplete Project Management Mission for the construction of the Androndrakely Container Terminal (TAC) and TCE - TA rail bypass
PlannedConsultingQCBSInstitutional and Social Project Management (MOIS), for the organization of land acquisition for the implementation of the PTML Project
PlannedConsultingQCBSFourniture de composants et jeux de fixations attaches SDE pour 139 800 TBA, de 250 000 clips type eclip SS A 31, de 150 000 butées et des 930 140 kits anti vandalepour protéger les clips des T
PlannedGoodsDirect selectionMission d'un spécialiste en VBG couvrant toutes les composantes du projet.
Plannedpipeline.cat.individualMission d'un(e) Spécialiste des risques environnementaux au sein de MADARAIL
Plannedpipeline.cat.individualMission d'un(e) Spécialiste en risques sociaux dédié à la composante MADARAIL
Plannedpipeline.cat.individualRecruement vérficateur indépendant
Plannedpipeline.cat.individualEtudes géotechniques de l'extension de la piste d'envol de l'aéroport de Toliara
Plannedpipeline.cat.individualDirect selectionSupply of 16,511.10 tons of S36 type Rails in elementary bars of 12 ml, in a single and indivisible lot
PlannedGoodsRFBSupply of 12,000 wooden sleepers for metal bridge
PlannedGoodsRFBSupply of 22,775 pairs of Fishplates, 91,140 bolts for S36 rail fishplates, 771,960 baseplate bolts and 772,560 EFG type baseplates for metal sleepers and 8,000 lag screws for track fastening (Vignole rail) on a metal bridge
PlannedGoodsRFBAcquisition of: four (04) construction trolleys with after-sales service and spare parts (Lot 1) and twenty (20) 25m3 ballast wagons (Lot 2).
PlannedGoodsRFBRecrutement Responsable Suivi Evaluation
Plannedpipeline.cat.individualRehabilitation works of the port of Toliara
PlannedWorksRFBRecrutement Responsable Administratif et Financier
Plannedpipeline.cat.individualRecrutement Comptable
Plannedpipeline.cat.individualSupply of 78 track turnouts tg 0.13 with metal floor and CATTINI type manual operation box
PlannedGoodsRFBSupply of security equipment and materials in the airports of Toamasina and Tolagnaro: 02 prefabricated incinerators (means of combating avian hazards)
PlannedGoodsRFQAcquisition of a mobile crusher for ballast production with operating equipment
PlannedGoodsRFBFeasibility Study (APD) and Environmental and Social Impact Assessment (ESIA) for the Toliara Airport runway extension
PlannedConsultingQCBSControl and supervision mission of the Port of Toliara
PlannedConsultingQCBSSupply of 18,799 kits of aluminothermic welding charges, various track welding tools and sealing paste
PlannedGoodsRFBRehabilitation works for the art structures of the TCE and TA lines (Bridge PK+250)
PlannedWorksRFBAudit Mission of the financial statements of component 1 - Modernization and reform of rail transport, of the MULTIMODAL TRANSPORT AND LOGISTICS PROJECT (PTML), Fiscal Years 2026 and 2027
PlannedConsultingLCSRehabilitation and security works for the aeronautical infrastructure and related equipment of Toliara airport
PlannedWorksRFBSupply of telecommunications equipment for telephone exchange and TELECOM tools.
PlannedGoodsRFBMission d'un(e) Consultant individuel pour le PBC
Plannedpipeline.cat.individualRehabilitation works for operating buildings at the Station: TCE and TA Lines (in several lots).
PlannedWorksRFBConstruction works for the Androndrakely Container Terminal and TCE - TA rail bypass
PlannedWorksRFBMission d'assistance d’un Consultant pour le service conseil pour la gestion du Port sec : accompagner la délégation de gestion de la plateforme logistique à un opérateur privé.
Plannedpipeline.cat.individualProduction locale de 139 80 0 Traverses en Béton Armé (TBA) avec SDE
PlannedGoodsDirect selectionFourniture de 119 420 m3 de ballasts 25/50
PlannedGoodsDirect selectionTravaux de renouvellement et de confortement de la voie ferrée des lignes : Tananarive–Côte Est (TCE) et Tananarive–Antsirabe (TA) du PK 0 au PK 11.
PlannedWorksDirect selectionSupply of signaling equipment: automatic, semi-automatic, mechanical, and TAC
PlannedGoodsRFBRehabilitation and securing works of aeronautical infrastructure and related equipment at Toamasina (lot 01) and Tolagnaro (lot 02) airports (pavements, lighting, drainage, fences and fire access)
PlannedWorksRFBTravaux de réhabilitation du port de Majunga : quais existants et quai aux boutres
AdvertisedWorksRFBAdvertised 2026-11-05
Estimate (Premium)Fourniture de matériels et équipements de sécurité dans les aéroports de Toamasina et Tolagnaro (matériels roulants): voitures de 1ère intervention, camion de pompier et tracteurs avec gyrobroyeurs
AdvertisedGoodsRFBAdvertised 2026-11-05
Estimate (Premium)Fourniture, livraison, installation et calibration de divers équipements d'aide à la navigation : DME (Distance Measuring Equipment) et NDB (Non Directional Beacon)
AdvertisedGoodsRFBAdvertised 2026-10-26
Estimate (Premium)Fourniture, livraison, installation et calibration de divers équipements d'aide à la navigation : PAPI pour les deux seuils de piste (Precision Approach Path Indicator) et système de balisage lumineux de piste
AdvertisedGoodsRFBAdvertised 2026-10-05
Estimate (Premium)Fourniture de matériels et équipements de sécurité dans les aéroports de Toliara (matériels roulants) : camion pompier, véhicule de piste, Tracteur avec gyrobroyeur
AdvertisedGoodsRFBAdvertised 2026-10-05
Estimate (Premium)Fourniture de matériels et équipements de sécurité dans l'aéroport de Toliara : Incinérateur préfabriqué
AdvertisedGoodsRFQAdvertised 2026-10-05
Estimate (Premium)Fourniture de matériels et équipements de sécurité dans l'aéroport de Toliara : 01 group e électrogène de 150 kVA
AdvertisedGoodsRFQAdvertised 2026-10-05
Estimate (Premium)Fourniture de matériels et équipements de sécurité dans l'aéroport de Toliara : machine traceur (marques de piste)
AdvertisedGoodsRFQAdvertised 2026-10-05
Estimate (Premium)Fourniture, livraison, installation et calibration de divers équipements d'aide à la navigation en deux lots : lot 01 Radio balise NDB (Non Directional Beacon), lot 02 Complémentsde panneaux lumineux de guidage au sol des avions
AdvertisedGoodsRFBAdvertised 2026-10-05
Estimate (Premium)