Tenders/Supply of net active electrical energy by the Contractor, coordinator of a standard balancing group for medium and low voltage with full administration of the information flow with the Electricity System Operator ESO EAD (ESO EAD) and assumption of imbalance costs for facilities of the Council of Ministers administration located in the territory of the Republic of Bulgaria
Open🇧🇬BulgariaSupplies

Supply of net active electrical energy by the Contractor, coordinator of a standard balancing group for medium and low voltage with full administration of the information flow with the Electricity System Operator ESO EAD (ESO EAD) and assumption of imbalance costs for facilities of the Council of Ministers administration located in the territory of the Republic of Bulgaria

Auto-translated from bg
Original title: Доставка на нетна активна електрическа енергия от Изпълнител, координатор на стандартна балансираща група за средно и ниско напрежение с пълно администриране на информационния поток с Електроенергийния системен оператор ЕАД (ЕCО ЕАД) и поемане на разходите за небаланси за обекти на администрацията на Министерския съвет, находящи се на територията на Република България
МИНИСТЕРСКИ СЪВЕТ
Published: Jul 28, 2026
Updated: Aug 1, 2026
Source: TED - Tenders Electronic Daily (EU)

About This Opportunity

This is a supplies contract in the energy and power sector, with a focus on Renewable Energy. Located in Bulgaria, Europe, this opportunity is open to firms and consortiums, with an estimated budget of EUR 2.0 million. Proposals must be submitted before August 28, 2026.

Published through TED - Tenders Electronic Daily (EU), a national government procurement portal. Public procurement tenders follow the country's national bidding regulations and may have specific eligibility and documentation requirements for the supply of goods in the energy and power sector. Supply contracts typically require bidders to demonstrate product compliance with technical specifications, delivery capacity, and relevant certifications. Interested parties should review the full documentation on the original source before submitting their proposal.

Description

Auto-translated from bg

Within the public procurement, the following shall be carried out: - Supply – fulfillment of obligations for the supply of net active electrical energy at low and medium voltage levels to the Contracting Authority's facilities, carried out by purchasing on the Bulgarian Independent Energy Exchange. This activity includes preparing hourly schedules, registering an hourly purchase offer on the Bulgarian Exchange. The selected Contractor shall perform full administration of the information flow with the licensed electricity distribution companies (EDC) in the territory where the metering points are located and with ESO EAD, and shall assume the costs for imbalances (positive, negative), in accordance with the requirements of the Contracting Authority specified in the Technical Specification and the Execution Proposal submitted by the selected Contractor. - Balancing – fulfillment of the obligations of a balancing group coordinator under liberalized market conditions, consumption forecasting, and responsibility for balancing. This activity includes consumption forecasting, full administration of the information flow with ESO EAD, as well as responsibility for balancing. Place and term of execution of the order: 6 (six) facilities: Sofia city, AMS, "Knyaz Alexander Dondukov" Blvd. No. 1; Sofia city, AMS, "Serdika" St. No. 6-8; Sofia city, AMS garage, "Yoakim Kurchovski" St. No. 1; Sofia city, "Boyana" complex, "Vitosko lale" St. No. 16; Varna city, "Evksinograd" farm, "St. St. Constantine and Helena" resort; Shabla town, "Shabla" facility, No./bl. 192, with 13 (thirteen) metering points. The contract term is 24 (twenty-four) months, starting from the date of confirmation of the first registered delivery schedule (load schedule) and/or until the maximum value of the contract is reached, whichever occurs first, with the actual electricity supply to commence from 01.11.2026. A supply of up to 12,004 MWh of medium and low voltage electrical energy is planned for a period of 24 (twenty-four) months. The indicated forecast quantity for the supply of medium and low voltage electrical energy does not oblige the Contracting Authority to consume it, and the Contractor undertakes to supply the required quantity of electricity per day, per month, and for the entire delivery period. For the duration of the contract, the Contracting Authority reserves the right to make changes to the facilities (removal or addition of a facility) for electricity supply, as well as to change the forecast quantity in a positive or negative direction according to the arising need.

Data provenance

This notice is sourced from TED - Tenders Electronic Daily (EU) and was originally published on July 28, 2026. Last refreshed 8 days ago. Original language: bg. BidsFactory mirrors official procurement notices and links back to the source for full legal text.

About МИНИСТЕРСКИ СЪВЕТ

МИНИСТЕРСКИ СЪВЕТ has issued 9 procurement notices on BidsFactory, including 2 currently open and 5 awarded contracts. Activity concentrates in Energy & Power, General Supplies & Services, and Media & Communications. All notices are published for Bulgaria. Notices are distributed via TED - Tenders Electronic Daily (EU). Most recent publication: August 3, 2026.

Frequently asked questions about this tender

When does this tender close?

The submission deadline is August 28, 2026. You have 19 days left to prepare and submit your proposal to the contracting authority.

Who is the contracting authority?

This notice was issued by МИНИСТЕРСКИ СЪВЕТ in Bulgaria. The authority is responsible for evaluating bids, awarding the contract, and managing performance.

What type of contract is this?

This is a Supplies contract in the Energy & Power sector. The classification helps bidders match the opportunity to their qualifications and registered scope of supply.

What is the estimated budget?

The estimated contract value is €2,045,200 - €2,045,200. Bidders should ensure their proposals are consistent with this range and account for any local taxes and contract execution costs.

Where will the contract be performed?

The contract is for delivery in Bulgaria. Foreign bidders should review local registration, taxation, and any in-country presence requirements before submitting.

How can I submit a bid?

Visit TED - Tenders Electronic Daily (EU) to access the full notice, required documents, and submission instructions provided by the contracting authority.

Find tenders like this automatically

Set up alerts and filters that match your business — never miss a relevant opportunity again.

See plans

Key Details

Submission Deadline
Aug 28, 2026
19 days remaining
Estimated Budget
€2,045,200 - €2,045,200
Contract Type
Supplies
Eligibility
Firms / Consortiums
Language
bg

Source

ted
TED - Tenders Electronic Daily (EU)
Public Procurement

Contracting Authority

МИНИСТЕРСКИ СЪВЕТ
🇧🇬Bulgaria

Matching Experts

Are you a consultant?

Join our Expert Network and get matched with relevant tenders.

Similar Open Tenders in Bulgaria

Open🇧🇬Bulgaria

SUPPLY OF NET ACTIVE ELECTRIC ENERGY AT FREELY NEGOTIATED PRICES AND SELECTION OF A BALANCING GROUP COORDINATOR FOR THE NEEDS OF PANAGYURISHTE MUNICIPALITY

Energy & Power
Sep 8, 2026€350,000 - €350,000
Open🇧🇬Bulgaria

Selection of an electricity supplier and a standard balancing group coordinator for the facilities of "TSAREVGRAD TARNOV" EOOD, connected at medium and low voltage

Energy & Power
Sep 7, 2026€200,000 - €200,000
Open🇧🇬Bulgaria

Supply of electricity at freely negotiated prices and selection of a balancing group coordinator for the sites of the National Social Security Institute (NOI) in the Southeast region

Energy & Power
Sep 8, 2026€271,044 - €271,044
Open🇧🇬Bulgaria

[bg] Delivery of net active electrical energy by a contractor – coordinator of a standard balancing group, for low voltage, with full administration of the information flow with ESO and assumption of costs for imbalances for sites of the Municipality of Vratsa

Energy & Power
Sep 8, 2026€2,000,000 - €2,000,000
Open🇧🇬Bulgaria

Delivery of net quantities of active electrical energy (high/medium/low voltage) and selection of a balancing group coordinator for the needs of TP "DGS – Asenovgrad" for a period of 36 months

Energy & Power
Sep 14, 2026€46,000 - €46,000
Open🇧🇬Bulgaria

Supply of natural gas for the needs of the Territorial Directorate of the National Social Security Institute - Kyustendil

Energy & Power
Aug 17, 2026€40,903 - €40,903