Terms of Reference for the IUCN Consultancy
Title: consultancy services to conduct studies and preparation of a detailed design for
the rehabilitation of the impire dam, in the district of balama, northern ara, ip.
1. Objective of the Consultancy
This consultancy has the following objective(s):
To develop a detailed design for the rehabilitation of the Impire Dam
To ensure compliance with dam safety standards in accordance with national
legislation
To ensure the structural safety and operational efficiency of the dam
2. Background
Project Reference: P04620
Donor reference: AVMZ-00020
3. About IUCN
IUCN is a membership union composed exclusively of government agencies and civil society
organisations. It provides public, private and non-governmental organisations with the
knowledge and tools that enable human progress, economic development and nature
conservation to work jointly.
Established in 1948, IUCN is now the world’s largest and most diverse environmental
network, drawing on the knowledge, resources and reach of over 1,400 member
organisations and some 15,000 experts. It is a leading provider of data, assessments and
analysis on conservation. Its broad membership base enables the IUCN to act as an
incubator and trusted repository of best practices, tools and international standards.
IUCN provides a neutral space in which various stakeholders, including governments,
NGOs, scientists, businesses, local communities, indigenous peoples organisations and
others, can work together to develop and implement solutions to environmental challenges
and achieve sustainable development.
Working with a wide range of partners and supporters, IUCN implements a broad and
diverse portfolio of conservation projects around the world. Combining the latest science
with the traditional knowledge of local communities, these projects aim to reverse habitat
loss, restore ecosystems and improve people’s well-being.
www.iucn.org
https://twitter.com/IUCN/
4. About the Project
The Mainstreaming and Integrated Water Resources Management approach for More
Resilient Basins in Mozambique [MozWateR] is a geared project towards achieving water
security and safety by supporting Mozambique in developing its capacity to implement
effective integrated water resources management (IWRM) in key basins in the northern and
central water administration regions and improve capacity at a national level. This project is
a collaborative effort where joint action on the ground will produce critical lessons from tried
best practices that inform policy which strengthen business approaches, institutions, and
rules around the sustainable use of land and water. MozWateR is being implemented
collaboratively with the Northern Regional Water Administration (ARA-Norte), Central
Terms of Reference for Consultancy v1 May 2026
Regional Water Administration (ARA-Centro) and the National Directorate for Water
Resources Management (DNGRH) as primary Implementing Partners (IPs) to combat
several challenges in the national water sector.
5. Description of the Assignment
The Consultant shall undertake all technical investigations required to assess the current
condition of the Impire Dam and prepare a Detailed Design for its rehabilitation. The
assignment includes carrying out topographic, hydrological, hydraulic, geological,
geotechnical, environmental and social studies, as well as a dam safety assessment, to
identify the rehabilitation measures required to restore the structural integrity, safety and
operational performance of the dam.
Based on the findings of these investigations, the Consultant shall prepare a complete
Detailed Design package, including design calculations, drawings, technical specifications,
bills of quantities, cost estimates, implementation schedule, operation and maintenance
plan, emergency plan, and all other supporting documentation required for the
implementation of the rehabilitation works, in accordance with the applicable legislation and
dam safety standards.
5.1. General Description of the Dam
The Impire Dam is a small-scale dam infrastructure strategically constructed to provide water
supply and support agricultural activities in Balama District, Cabo Delgado Province. Over
the years, the infrastructure has shown signs of deterioration associated with the ageing of
the structures, widespread erosion, reservoir sedimentation, limitations in hydraulic capacity,
lack of updated technical assessments, vegetation growing on the dam embankment,
seepage (percolation), and the absence of monitoring and safety instruments. These
conditions reduce the operational efficiency of the dam and may pose risks to the safety of
the infrastructure and downstream populations. In this context, it has become necessary to
undertake specialised technical studies and prepare a Detailed Rehabilitation Design to
define the required interventions in accordance with the national dam safety legislation.
5.2. Location and Technical Description of the Impire Dam
The Impire Dam is located within the Montepuez River Basin, specifically along the
Montepuez River, at the coordinates 13°23'24.1"S and 38°22'10.9"E, in Cabo Delgado
Province, Balama District, Impire Administrative Post. Balama District is bordered to the
north by Montepuez District, to the south by Lalaua District, to the east by the districts of
Montepuez and Namuno, and to the west by Marrupa and Nipepe districts. With a total area
of 5,619 km², the district is characterised by a combination of rural areas, traditional
communities, and important resources, including fishing and agricultural areas.
5.3. History of the Reservoir
The Impire Reservoir is an earthfill dam. Its construction began in 1969 and was completed
in 1970. It was built by Cape Verdean farmers under the direction of the colonial authorities
for military and agricultural purposes, to ensure water availability and to support the local
community of Impire in vegetable production. [...]
Procurement details
Reference: IUCN-26-10-Retender Impire Dam Rehab-1255
Procedure: SOP1 - Open Procedure
Procurement type: Consulting
IUCN office (lead): ESARO Mozambique
Requisitioning unit: ESARO Mozambique Programme (MZ)
Project: P04620 MozWateR
Country of performance: Mozambique
Expected contract duration: 3 months
Estimated contract value: 25,000-199,999 CHF
Currency of proposals: EUR - Euro
Language of documents: English
Deadline for questions: 30 October 2026 20:59 UTC
Deadline for technical and financial proposals: 09 November 2026 20:59 UTC
Expected contract award date: 20 November 2026 20:59 UTC
Documents
- Terms of Reference: ToR_Impire_Dam_Rehabilitation_Ara_Norte.pdf
- Conditions for Participating: Conditions for Participating ENG-SPA-FRA v23-09-26.pdf
- Standard contract: Standard Agreement.docx
- RfP_Impire Dam_rehabilitation_Ara Norte IP.pdf
The International Union for Conservation of Nature (IUCN) is a membership union of government and civil society organisations working on nature conservation and sustainable development. IUCN procures consulting services, goods and works for its projects worldwide through the IUCN Procurement Portal. For all contracts above CHF 25,000 IUCN selects contractors through a formal competitive tendering process under its Standard Operating Procedure 1 (Open Procedure). Interested bidders must register on the portal, review the Terms of Reference, the Conditions for Participating and the standard contract, and submit their technical and financial proposals through the portal before the stated deadline. Questions must be raised through the portal's Q&A function before the deadline for questions.